{
  "meta": {
    "id": "lien-deadlines",
    "title": "Mechanics lien deadlines by state (2026)",
    "license": "CC BY 4.0",
    "retrievedAt": "2026-09-30",
    "verifiedAt": "2026-10-03",
    "reviewBy": "2026-12-31",
    "sources": [
      {
        "id": "ak-0",
        "title": "AS 34.35.050 to 34.35.140, Alaska Legislature",
        "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ak-1",
        "title": "AS 01.10.080, Alaska Legislature",
        "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=01.10.080&secEnd=01.10.080",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ak-2",
        "title": "AS 44.12.010 to 44.12.025, Alaska Legislature",
        "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "al-0",
        "title": "Ala. Code § 35-11-210, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-210",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "al-1",
        "title": "Ala. Code § 35-11-218, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-218",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "al-2",
        "title": "Ala. Code § 35-11-215, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-215",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "al-3",
        "title": "Ala. Code § 35-11-221, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-221",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "al-4",
        "title": "Ala. Code § 1-1-4, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-1-4",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "al-5",
        "title": "Ala. Code § 1-3-8, Alabama Legislature",
        "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ar-0",
        "title": "Arkansas Code of 1987 Annotated, LexisNexis public access for the Arkansas Code",
        "url": "https://www.lexisnexis.com/hottopics/arcode/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-0",
        "title": "A.R.S. § 33-992.01, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00992-01.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-1",
        "title": "Laws 2024, ch. 89 (H.B. 2110), Arizona Legislature",
        "url": "https://www.azleg.gov/legtext/56leg/2R/laws/0089.htm",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "az-2",
        "title": "A.R.S. § 33-993, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00993.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-3",
        "title": "A.R.S. § 33-998, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/00998.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-4",
        "title": "A.R.S. § 33-1002, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/33/01002.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-5",
        "title": "A.R.S. § 1-243, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00243.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-6",
        "title": "A.R.S. § 1-303, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00303.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "az-7",
        "title": "A.R.S. § 1-301, Arizona Legislature",
        "url": "https://www.azleg.gov/ars/1/00301.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-0",
        "title": "Cal. Civ. Code § 8204, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-1",
        "title": "Cal. Civ. Code § 8200, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-2",
        "title": "Cal. Civ. Code § 8110, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8110",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-3",
        "title": "Cal. Civ. Code § 8412, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-4",
        "title": "Cal. Civ. Code § 8190, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-5",
        "title": "Cal. Civ. Code § 8414, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8414",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-6",
        "title": "Cal. Civ. Code § 8460, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8460",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-7",
        "title": "Cal. Civ. Code § 8180, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8180",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-8",
        "title": "Cal. Civ. Code § 8182, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8182",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-9",
        "title": "Cal. Code Civ. Proc. § 12, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-10",
        "title": "Cal. Civ. Code § 8058, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8058",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-11",
        "title": "Cal. Code Civ. Proc. § 12a, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-12",
        "title": "Cal. Code Civ. Proc. § 135, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ca-13",
        "title": "Cal. Code Civ. Proc. § 12b, California Legislative Information",
        "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12b",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "co-0",
        "title": "Colorado Revised Statutes 2024, title 38, Colorado General Assembly",
        "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
        "retrievedAt": "2026-09-26",
        "type": "statute"
      },
      {
        "id": "ct-0",
        "title": "Conn. Gen. Stat. chapter 847, Connecticut General Assembly",
        "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "dc-0",
        "title": "D.C. Code § 40-301.02, Council of the District of Columbia",
        "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "dc-1",
        "title": "D.C. Code § 40-303.01, Council of the District of Columbia",
        "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.01",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "dc-2",
        "title": "D.C. Code § 40-303.02, Council of the District of Columbia",
        "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.02",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "dc-3",
        "title": "D.C. Code § 40-303.03, Council of the District of Columbia",
        "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.03",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "dc-4",
        "title": "D.C. Code § 40-303.13, Council of the District of Columbia",
        "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.13",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "de-0",
        "title": "25 Del. C. ch. 27, subch. II, Delaware Code Online",
        "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "de-1",
        "title": "25 Del. C. ch. 27, subch. III, Delaware Code Online",
        "url": "https://delcode.delaware.gov/title25/c027/sc03/index.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "de-2",
        "title": "25 Del. C. ch. 27, subch. I, Delaware Code Online",
        "url": "https://delcode.delaware.gov/title25/c027/sc01/index.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "fl-0",
        "title": "Fla. Stat. ch. 713 (2025), Online Sunshine",
        "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
        "retrievedAt": "2026-05-17",
        "type": "statute"
      },
      {
        "id": "fl-1",
        "title": "Fla. Stat. § 110.117 (2025), Online Sunshine",
        "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
        "retrievedAt": "2025-11-18",
        "type": "statute"
      },
      {
        "id": "ga-0",
        "title": "Official Code of Georgia Annotated, LexisNexis public access for the Georgia General Assembly",
        "url": "https://www.lexisnexis.com/hottopics/gacode/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "hi-0",
        "title": "Haw. Rev. Stat. § 507-42, Hawaii State Legislature",
        "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0042.htm",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "hi-1",
        "title": "Haw. Rev. Stat. § 507-43, Hawaii State Legislature",
        "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "hi-2",
        "title": "Haw. Rev. Stat. § 1-29, Hawaii State Legislature",
        "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0001/HRS_0001-0029.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "hi-3",
        "title": "Haw. Rev. Stat. § 8-1, Hawaii State Legislature",
        "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0008/HRS_0008-0001.htm",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "hi-4",
        "title": "Haw. Rev. Stat. § 8-2, Hawaii State Legislature",
        "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0008/HRS_0008-0002.htm",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ia-0",
        "title": "Iowa Code § 572.13B, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-1",
        "title": "Iowa Code § 572.1, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.1.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-2",
        "title": "Iowa Code § 572.33, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.33.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-3",
        "title": "Iowa Code § 572.13A, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-4",
        "title": "Iowa Code § 572.13, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.13.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-5",
        "title": "Iowa Code § 572.14, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.14.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-6",
        "title": "Iowa Code § 572.9, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.9.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-7",
        "title": "Iowa Code § 572.10, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.10.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-8",
        "title": "Iowa Code § 572.11, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.11.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-9",
        "title": "Iowa Code § 572.27, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.27.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-10",
        "title": "Iowa Code § 572.28, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/572.28.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ia-11",
        "title": "Iowa Code § 4.1, Iowa Legislature",
        "url": "https://www.legis.iowa.gov/docs/code/4.1.pdf",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "id-0",
        "title": "Idaho Code § 45-507, Idaho State Legislature",
        "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
        "retrievedAt": "2026-05-15",
        "type": "statute"
      },
      {
        "id": "id-1",
        "title": "Idaho Code § 45-510, Idaho State Legislature",
        "url": "https://web.archive.org/web/20251219143937id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-510/",
        "retrievedAt": "2025-12-19",
        "type": "statute"
      },
      {
        "id": "id-2",
        "title": "Idaho Code § 73-109, Idaho State Legislature",
        "url": "https://web.archive.org/web/20251224185027id_/https://legislature.idaho.gov/statutesrules/idstat/Title73/T73CH1/SECT73-109/",
        "retrievedAt": "2025-12-24",
        "type": "statute"
      },
      {
        "id": "id-3",
        "title": "Idaho Code § 73-108, Idaho State Legislature",
        "url": "https://web.archive.org/web/20251112164259id_/https://legislature.idaho.gov/statutesrules/idstat/Title73/T73CH1/SECT73-108/",
        "retrievedAt": "2025-11-12",
        "type": "statute"
      },
      {
        "id": "il-0",
        "title": "770 ILCS 60, Mechanics Lien Act, Illinois General Assembly",
        "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "il-1",
        "title": "770 ILCS 60, Mechanics Lien Act, Illinois General Assembly",
        "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
        "retrievedAt": "2026-04-09",
        "type": "statute"
      },
      {
        "id": "il-2",
        "title": "5 ILCS 70/1.11, Illinois General Assembly",
        "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
        "retrievedAt": "2025-05-02",
        "type": "statute"
      },
      {
        "id": "il-3",
        "title": "205 ILCS 630/17, Illinois General Assembly",
        "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
        "retrievedAt": "2025-03-11",
        "type": "statute"
      },
      {
        "id": "in-0",
        "title": "Indiana Code 2026, Title 32, Indiana General Assembly",
        "url": "https://iga.in.gov/laws/2026/ic/titles/32",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ks-0",
        "title": "K.S.A. 60-1103a, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-1",
        "title": "K.S.A. 60-1103b, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-2",
        "title": "K.S.A. 60-1102, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-3",
        "title": "K.S.A. 60-1103, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-4",
        "title": "K.S.A. 60-1105, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0005.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-5",
        "title": "K.S.A. 60-206, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_002_0006.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ks-6",
        "title": "K.S.A. 35-107, Kansas Office of Revisor of Statutes",
        "url": "https://ksrevisor.gov/statutes/chapters/ch35/035_001_0007.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "la-0",
        "title": "La. R.S. 9:4822, Louisiana State Legislature",
        "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
        "retrievedAt": "2025-12-13",
        "type": "statute"
      },
      {
        "id": "la-1",
        "title": "La. R.S. 9:4823, Louisiana State Legislature",
        "url": "https://web.archive.org/web/20241016005844id_/https://legis.la.gov/Legis/Law.aspx?p=y&d=108063",
        "retrievedAt": "2024-10-16",
        "type": "statute"
      },
      {
        "id": "la-2",
        "title": "La. Code Civ. Proc. art. 5059, Louisiana State Legislature",
        "url": "https://web.archive.org/web/20260624164838id_/https://legis.la.gov/Legis/Law.aspx?d=112147",
        "retrievedAt": "2026-06-24",
        "type": "statute"
      },
      {
        "id": "la-3",
        "title": "La. R.S. 1:55, Louisiana State Legislature",
        "url": "https://web.archive.org/web/20260615050952id_/https://legis.la.gov/Legis/Law.aspx?d=74097",
        "retrievedAt": "2026-06-15",
        "type": "statute"
      },
      {
        "id": "ma-0",
        "title": "Mass. Gen. Laws ch. 254, § 2, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260305204026id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2",
        "retrievedAt": "2026-03-05",
        "type": "statute"
      },
      {
        "id": "ma-1",
        "title": "Mass. Gen. Laws ch. 254, § 4, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
        "retrievedAt": "2026-05-08",
        "type": "statute"
      },
      {
        "id": "ma-2",
        "title": "Mass. Gen. Laws ch. 254, § 1, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20251112194744id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section1",
        "retrievedAt": "2025-11-12",
        "type": "statute"
      },
      {
        "id": "ma-3",
        "title": "Mass. Gen. Laws ch. 254, § 8, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260512182550id_/https://malegislature.gov/laws/generallaws/partiii/titleiv/chapter254/section8",
        "retrievedAt": "2026-05-12",
        "type": "statute"
      },
      {
        "id": "ma-4",
        "title": "Mass. Gen. Laws ch. 254, § 11, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260519042043id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section11",
        "retrievedAt": "2026-05-19",
        "type": "statute"
      },
      {
        "id": "ma-5",
        "title": "Mass. Gen. Laws ch. 254, § 5, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20251211162603id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section5",
        "retrievedAt": "2025-12-11",
        "type": "statute"
      },
      {
        "id": "ma-6",
        "title": "Mass. Gen. Laws ch. 254, § 2A, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260605003204id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2A",
        "retrievedAt": "2026-06-05",
        "type": "statute"
      },
      {
        "id": "ma-7",
        "title": "Mass. Gen. Laws ch. 254, § 2B, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260311020010id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2B",
        "retrievedAt": "2026-03-11",
        "type": "statute"
      },
      {
        "id": "ma-8",
        "title": "Mass. Gen. Laws ch. 4, § 9, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260115181129id_/https://malegislature.gov/Laws/GeneralLaws/PartI/TitleI/Chapter4/Section9",
        "retrievedAt": "2026-01-15",
        "type": "statute"
      },
      {
        "id": "ma-9",
        "title": "Mass. Gen. Laws ch. 4, § 7, The General Court of the Commonwealth of Massachusetts",
        "url": "https://web.archive.org/web/20260923215455id_/https://malegislature.gov/Laws/GeneralLaws/PartI/TitleI/Chapter4/Section7",
        "retrievedAt": "2026-09-23",
        "type": "statute"
      },
      {
        "id": "md-0",
        "title": "Md. Code, Real Prop. § 9-104, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "md-1",
        "title": "Md. Code, Real Prop. § 9-101, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-101&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "md-2",
        "title": "Md. Code, Real Prop. § 9-105, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-105&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "md-3",
        "title": "Md. Code, Real Prop. § 9-109, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-109&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "md-4",
        "title": "Md. Code, Gen. Prov. § 1-302, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-302&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "md-5",
        "title": "Md. Code, Gen. Prov. § 1-111, Maryland General Assembly",
        "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-111&enactments=false",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "me-0",
        "title": "10 M.R.S. § 3255, Maine Legislature",
        "url": "https://legislature.maine.gov/statutes/10/title10sec3255.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "me-1",
        "title": "10 M.R.S. § 3253, Maine Legislature",
        "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "me-2",
        "title": "10 M.R.S. § 3256, Maine Legislature",
        "url": "https://legislature.maine.gov/statutes/10/title10sec3256.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mi-0",
        "title": "Mich. Comp. Laws § 570.1109, Michigan Legislature",
        "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
        "retrievedAt": "2025-05-16",
        "type": "statute"
      },
      {
        "id": "mi-1",
        "title": "Mich. Comp. Laws § 570.1111, Michigan Legislature",
        "url": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
        "retrievedAt": "2025-05-17",
        "type": "statute"
      },
      {
        "id": "mi-2",
        "title": "Mich. Comp. Laws § 570.1117, Michigan Legislature",
        "url": "https://web.archive.org/web/20250516001507id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1117",
        "retrievedAt": "2025-05-16",
        "type": "statute"
      },
      {
        "id": "mi-3",
        "title": "Mich. Comp. Laws § 570.1114, Michigan Legislature",
        "url": "https://web.archive.org/web/20251223201708id_/https://legislature.mi.gov/Laws/MCL?objectName=MCL-570-1114",
        "retrievedAt": "2025-12-23",
        "type": "statute"
      },
      {
        "id": "mi-4",
        "title": "Mich. Comp. Laws § 570.1108a, Michigan Legislature",
        "url": "https://web.archive.org/web/20250517054740id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108a",
        "retrievedAt": "2025-05-17",
        "type": "statute"
      },
      {
        "id": "mi-5",
        "title": "Mich. Comp. Laws § 570.1108, Michigan Legislature",
        "url": "https://web.archive.org/web/20250516091235id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108",
        "retrievedAt": "2025-05-16",
        "type": "statute"
      },
      {
        "id": "mi-6",
        "title": "Mich. Comp. Laws § 8.6, Michigan Legislature",
        "url": "https://web.archive.org/web/20250708202026id_/https://legislature.mi.gov/Laws/MCL?objectName=MCL-8-6",
        "retrievedAt": "2025-07-08",
        "type": "statute"
      },
      {
        "id": "mi-7",
        "title": "Mich. Comp. Laws § 435.101, Michigan Legislature",
        "url": "https://web.archive.org/web/20250517074538id_/https://www.legislature.mi.gov/Laws/MCL?objectName=MCL-435-101",
        "retrievedAt": "2025-05-17",
        "type": "statute"
      },
      {
        "id": "mn-0",
        "title": "Minn. Stat. ch. 514 (2025), Minnesota Office of the Revisor of Statutes",
        "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mn-1",
        "title": "Minn. Stat. § 645.15 (2025), Minnesota Office of the Revisor of Statutes",
        "url": "https://www.revisor.mn.gov/statutes/cite/645.15",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mn-2",
        "title": "Minn. Stat. § 645.44 (2025), Minnesota Office of the Revisor of Statutes",
        "url": "https://www.revisor.mn.gov/statutes/cite/645.44",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-0",
        "title": "Mo. Rev. Stat. § 429.012, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.012",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-1",
        "title": "Mo. Rev. Stat. § 429.016, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-2",
        "title": "Mo. Rev. Stat. § 429.100, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.100",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-3",
        "title": "Mo. Rev. Stat. § 429.080, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.080",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-4",
        "title": "Mo. Rev. Stat. § 429.170, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.170",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-5",
        "title": "Mo. Rev. Stat. § 429.013, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.013",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-6",
        "title": "Mo. Rev. Stat. § 506.060, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=506.060",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-7",
        "title": "Mo. Rev. Stat. § 1.040, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=1.040",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mo-8",
        "title": "Mo. Rev. Stat. § 9.010, Missouri Revisor of Statutes",
        "url": "https://revisor.mo.gov/main/OneSection.aspx?section=9.010",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ms-0",
        "title": "Mississippi Code 1972 Annotated, LexisNexis public access for the Mississippi Legislature",
        "url": "https://www.lexisnexis.com/hottopics/mscode/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "mt-0",
        "title": "Mont. Code Ann. § 71-3-531, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-1",
        "title": "Mont. Code Ann. § 71-3-535, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0350/0710-0030-0050-0350.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-2",
        "title": "Mont. Code Ann. § 71-3-533, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0330/0710-0030-0050-0330.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-3",
        "title": "Mont. Code Ann. § 71-3-534, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0340/0710-0030-0050-0340.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-4",
        "title": "Mont. Code Ann. § 71-3-562, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0620/0710-0030-0050-0620.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-5",
        "title": "Mont. Code Ann. § 1-1-306, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0060/0010-0010-0030-0060.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-6",
        "title": "Mont. Code Ann. § 1-1-216, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0020/section_0160/0010-0010-0020-0160.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "mt-7",
        "title": "Mont. Code Ann. § 1-1-307, Montana Legislature",
        "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0070/0010-0010-0030-0070.html",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "nc-0",
        "title": "N.C. Gen. Stat. ch. 44A, art. 2, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
        "retrievedAt": "2026-05-17",
        "type": "statute"
      },
      {
        "id": "nc-1",
        "title": "N.C. Gen. Stat. § 1-593, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260311222231id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1/GS_1-593.html",
        "retrievedAt": "2026-03-11",
        "type": "statute"
      },
      {
        "id": "nc-2",
        "title": "N.C. Gen. Stat. § 1A-1, Rule 6, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
        "retrievedAt": "2026-06-14",
        "type": "statute"
      },
      {
        "id": "nc-3",
        "title": "N.C. Gen. Stat. § 103-5, North Carolina General Assembly",
        "url": "https://web.archive.org/web/20250620225922id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_103/GS_103-5.html",
        "retrievedAt": "2025-06-20",
        "type": "statute"
      },
      {
        "id": "nd-0",
        "title": "N.D.C.C. ch. 35-27, North Dakota Legislative Branch",
        "url": "https://ndlegis.gov/cencode/t35c27.pdf",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "nd-1",
        "title": "N.D.C.C. ch. 1-02, North Dakota Legislative Branch",
        "url": "https://ndlegis.gov/cencode/t01c02.pdf",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "nd-2",
        "title": "N.D.C.C. ch. 1-03, North Dakota Legislative Branch",
        "url": "https://ndlegis.gov/cencode/t01c03.pdf",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ne-0",
        "title": "Neb. Rev. Stat. § 52-135, Nebraska Legislature",
        "url": "https://web.archive.org/web/20260614013143id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-135",
        "retrievedAt": "2026-06-14",
        "type": "statute"
      },
      {
        "id": "ne-1",
        "title": "Neb. Rev. Stat. § 52-136, Nebraska Legislature",
        "url": "https://web.archive.org/web/20260411055309id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-136",
        "retrievedAt": "2026-04-11",
        "type": "statute"
      },
      {
        "id": "ne-2",
        "title": "Neb. Rev. Stat. § 52-137, Nebraska Legislature",
        "url": "https://web.archive.org/web/20260614002359id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-137",
        "retrievedAt": "2026-06-14",
        "type": "statute"
      },
      {
        "id": "ne-3",
        "title": "Neb. Rev. Stat. § 52-129, Nebraska Legislature",
        "url": "https://web.archive.org/web/20251118222242id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-129",
        "retrievedAt": "2025-11-18",
        "type": "statute"
      },
      {
        "id": "ne-4",
        "title": "Neb. Rev. Stat. § 52-140, Nebraska Legislature",
        "url": "https://web.archive.org/web/20260614011458id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-140",
        "retrievedAt": "2026-06-14",
        "type": "statute"
      },
      {
        "id": "ne-5",
        "title": "Neb. Rev. Stat. § 25-2221, Nebraska Legislature",
        "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
        "retrievedAt": "2025-10-05",
        "type": "statute"
      },
      {
        "id": "nh-0",
        "title": "N.H. Rev. Stat. Ann. § 447:5, New Hampshire General Court",
        "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-5.htm",
        "retrievedAt": "2026-05-11",
        "type": "statute"
      },
      {
        "id": "nh-1",
        "title": "N.H. Rev. Stat. Ann. § 447:6, New Hampshire General Court",
        "url": "https://web.archive.org/web/20260909165306id_/https://gc.nh.gov/rsa/html/XLI/447/447-6.htm",
        "retrievedAt": "2026-09-09",
        "type": "statute"
      },
      {
        "id": "nh-2",
        "title": "N.H. Rev. Stat. Ann. § 447:8, New Hampshire General Court",
        "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-8.htm",
        "retrievedAt": "2026-05-11",
        "type": "statute"
      },
      {
        "id": "nh-3",
        "title": "N.H. Rev. Stat. Ann. § 447:12-b, New Hampshire General Court",
        "url": "https://web.archive.org/web/20250418123623id_/https://gc.nh.gov/rsa/html/XLI/447/447-12-b.htm",
        "retrievedAt": "2025-04-18",
        "type": "statute"
      },
      {
        "id": "nh-4",
        "title": "N.H. Rev. Stat. Ann. § 447:9, New Hampshire General Court",
        "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-9.htm",
        "retrievedAt": "2026-05-11",
        "type": "statute"
      },
      {
        "id": "nh-5",
        "title": "N.H. Rev. Stat. Ann. § 447:10, New Hampshire General Court",
        "url": "https://web.archive.org/web/20250823180037id_/https://gc.nh.gov/rsa/html/XLI/447/447-10.htm",
        "retrievedAt": "2025-08-23",
        "type": "statute"
      },
      {
        "id": "nh-6",
        "title": "N.H. Rev. Stat. Ann. § 21:35, New Hampshire General Court",
        "url": "https://web.archive.org/web/20260712210734id_/https://gc.nh.gov/rsa/html/I/21/21-35.htm",
        "retrievedAt": "2026-07-12",
        "type": "statute"
      },
      {
        "id": "nm-0",
        "title": "N.M. Stat. Ann. chapter 48, New Mexico Compilation Commission",
        "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "nv-0",
        "title": "NRS chapter 108, Nevada Legislature",
        "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
        "retrievedAt": "2026-04-20",
        "type": "statute"
      },
      {
        "id": "ny-0",
        "title": "N.Y. Lien Law § 3, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/3",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-1",
        "title": "N.Y. Lien Law § 10, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-2",
        "title": "N.Y. Lien Law § 10, New York State Senate",
        "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
        "retrievedAt": "2026-09-22",
        "type": "statute"
      },
      {
        "id": "ny-3",
        "title": "N.Y. Lien Law § 11, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-4",
        "title": "N.Y. Lien Law § 11-b, New York State Senate",
        "url": "https://web.archive.org/web/20250418044502id_/https://www.nysenate.gov/legislation/laws/LIE/11-B",
        "retrievedAt": "2025-04-18",
        "type": "statute"
      },
      {
        "id": "ny-5",
        "title": "N.Y. Lien Law § 11-b, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/11-B",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-6",
        "title": "N.Y. Lien Law § 17, New York State Senate",
        "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ny-7",
        "title": "N.Y. Gen. Constr. Law § 20, New York State Senate",
        "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
        "retrievedAt": "2025-11-08",
        "type": "statute"
      },
      {
        "id": "ny-8",
        "title": "N.Y. Gen. Constr. Law § 25-a, New York State Senate",
        "url": "https://web.archive.org/web/20250825120112id_/https://www.nysenate.gov/legislation/laws/GCN/25-A",
        "retrievedAt": "2025-08-25",
        "type": "statute"
      },
      {
        "id": "ny-9",
        "title": "N.Y. Gen. Constr. Law § 24, New York State Senate",
        "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
        "retrievedAt": "2026-02-11",
        "type": "statute"
      },
      {
        "id": "oh-0",
        "title": "Ohio Rev. Code ch. 1311, Ohio Laws",
        "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
        "retrievedAt": "2026-05-20",
        "type": "statute"
      },
      {
        "id": "oh-1",
        "title": "Ohio Rev. Code § 1.14, Ohio Laws",
        "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
        "retrievedAt": "2026-06-12",
        "type": "statute"
      },
      {
        "id": "ok-0",
        "title": "Okla. Stat. tit. 42 (Liens), Oklahoma State Legislature",
        "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "ok-1",
        "title": "Okla. Stat. tit. 25 (Definitions and General Provisions), Oklahoma State Legislature",
        "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "or-0",
        "title": "ORS chapter 87 (2025 edition), Oregon State Legislature",
        "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
        "retrievedAt": "2026-04-11",
        "type": "statute"
      },
      {
        "id": "or-1",
        "title": "ORS chapter 174 (2025 edition), Oregon State Legislature",
        "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
        "retrievedAt": "2026-02-19",
        "type": "statute"
      },
      {
        "id": "or-2",
        "title": "ORS chapter 187 (2025 edition), Oregon State Legislature",
        "url": "https://web.archive.org/web/20260606100201id_/https://www.oregonlegislature.gov/bills_laws/ors/ors187.html",
        "retrievedAt": "2026-06-06",
        "type": "statute"
      },
      {
        "id": "ri-0",
        "title": "R.I. Gen. Laws § 34-28-4.1, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20251109223838id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.1.htm",
        "retrievedAt": "2025-11-09",
        "type": "statute"
      },
      {
        "id": "ri-1",
        "title": "R.I. Gen. Laws § 34-28-4, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
        "retrievedAt": "2025-11-09",
        "type": "statute"
      },
      {
        "id": "ri-2",
        "title": "R.I. Gen. Laws § 34-28-9, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20260919171153id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-9.htm",
        "retrievedAt": "2026-09-19",
        "type": "statute"
      },
      {
        "id": "ri-3",
        "title": "R.I. Gen. Laws § 34-28-7, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20260609132607id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-7.htm",
        "retrievedAt": "2026-06-09",
        "type": "statute"
      },
      {
        "id": "ri-4",
        "title": "R.I. Gen. Laws § 34-28-10, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20251109224126id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-10.htm",
        "retrievedAt": "2025-11-09",
        "type": "statute"
      },
      {
        "id": "ri-5",
        "title": "R.I. Gen. Laws § 43-3-13, State of Rhode Island General Assembly",
        "url": "https://web.archive.org/web/20250502060313id_/https://webserver.rilegislature.gov/Statutes/TITLE43/43-3/43-3-13.htm",
        "retrievedAt": "2025-05-02",
        "type": "statute"
      },
      {
        "id": "sc-0",
        "title": "S.C. Code tit. 29, ch. 5, South Carolina Legislature",
        "url": "https://www.scstatehouse.gov/code/t29c005.php",
        "retrievedAt": "2026-10-02",
        "type": "statute"
      },
      {
        "id": "sd-0",
        "title": "SDCL 44-9-53, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-53.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-1",
        "title": "SDCL 44-9-10, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-10.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-2",
        "title": "SDCL 44-9-17, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-17.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-3",
        "title": "SDCL 44-9-15, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-15.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-4",
        "title": "SDCL 44-9-24, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-24.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-5",
        "title": "SDCL 44-9-26, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-26.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-6",
        "title": "SDCL 44-9-50, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-50.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-7",
        "title": "SDCL 44-9-51, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/44-9-51.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-8",
        "title": "SDCL 2-14-14, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/2-14-14.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "sd-9",
        "title": "SDCL 1-5-1, South Dakota Legislature",
        "url": "https://sdlegislature.gov/api/Statutes/1-5-1.html",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "tn-0",
        "title": "Tennessee Code Annotated, LexisNexis public access for the Tennessee Code",
        "url": "https://www.lexisnexis.com/hottopics/tncode/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "tx-0",
        "title": "Tex. Prop. Code ch. 53, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "tx-1",
        "title": "Tex. Gov't Code ch. 311, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.311.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "tx-2",
        "title": "Tex. Prop. Code ch. 1, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.1.htm",
        "retrievedAt": "2026-10-01",
        "type": "statute"
      },
      {
        "id": "tx-3",
        "title": "Tex. Gov't Code ch. 662, Texas Legislative Council",
        "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "ut-0",
        "title": "Utah Code § 38-1a-501, Utah State Legislature",
        "url": "https://web.archive.org/web/20170216155206id_/http://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S501_2014040320140513.pdf",
        "retrievedAt": "2017-02-16",
        "type": "statute"
      },
      {
        "id": "ut-1",
        "title": "Utah Code § 38-1a-502, Utah State Legislature",
        "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
        "retrievedAt": "2017-03-03",
        "type": "statute"
      },
      {
        "id": "ut-2",
        "title": "Utah Code § 38-1a-701, Utah State Legislature",
        "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
        "retrievedAt": "2017-03-03",
        "type": "statute"
      },
      {
        "id": "ut-3",
        "title": "Utah Code § 38-1a-507, Utah State Legislature",
        "url": "https://web.archive.org/web/20170217013047id_/https://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S507_1800010118000101.pdf",
        "retrievedAt": "2017-02-17",
        "type": "statute"
      },
      {
        "id": "ut-4",
        "title": "Utah Code § 68-3-7, Utah State Legislature",
        "url": "https://web.archive.org/web/20250402062522id_/https://le.utah.gov/xcode/Title68/Chapter3/C68-3-S7_1800010118000101.html",
        "retrievedAt": "2025-04-02",
        "type": "statute"
      },
      {
        "id": "ut-5",
        "title": "Utah Code Title 63G, Chapter 1, Part 3 (State Holidays), Utah State Legislature",
        "url": "https://web.archive.org/web/20260708192127id_/https://le.utah.gov/xcode/Title63G/Chapter1/C63G-1-P3_1800010118000101.pdf",
        "retrievedAt": "2026-07-08",
        "type": "statute"
      },
      {
        "id": "va-0",
        "title": "Va. Code § 43-4.01, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-1",
        "title": "Va. Code § 43-7, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-7/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-2",
        "title": "Va. Code § 43-1, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-1/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-3",
        "title": "Va. Code § 43-9, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-9/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-4",
        "title": "Va. Code § 43-4, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-5",
        "title": "Va. Code § 43-17, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-17/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "va-6",
        "title": "Va. Code § 1-210, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-210/",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "va-7",
        "title": "Va. Code § 2.2-3300, Virginia General Assembly",
        "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "vt-0",
        "title": "9 V.S.A. § 1921, Vermont Statutes Online, Vermont General Assembly",
        "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "vt-1",
        "title": "9 V.S.A. § 1923, Vermont Statutes Online, Vermont General Assembly",
        "url": "https://legislature.vermont.gov/statutes/section/09/051/01923",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "vt-2",
        "title": "9 V.S.A. § 1924, Vermont Statutes Online, Vermont General Assembly",
        "url": "https://legislature.vermont.gov/statutes/section/09/051/01924",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "vt-3",
        "title": "1 V.S.A. § 138, Vermont Statutes Online, Vermont General Assembly",
        "url": "https://legislature.vermont.gov/statutes/section/01/003/00138",
        "retrievedAt": "2026-09-30",
        "type": "statute"
      },
      {
        "id": "wa-0",
        "title": "RCW chapter 60.04, Washington State Legislature",
        "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "wa-1",
        "title": "RCW 1.12.040, Washington State Legislature",
        "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=1.12.040",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "wa-2",
        "title": "RCW 1.16.050, Washington State Legislature",
        "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=1.16.050",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "wi-0",
        "title": "Wis. Stat. § 779.02, Wisconsin State Legislature",
        "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
        "retrievedAt": "2025-12-14",
        "type": "statute"
      },
      {
        "id": "wi-1",
        "title": "Wis. Stat. § 779.06, Wisconsin State Legislature",
        "url": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
        "retrievedAt": "2026-03-14",
        "type": "statute"
      },
      {
        "id": "wi-2",
        "title": "Wis. Stat. § 990.001, Wisconsin State Legislature",
        "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
        "retrievedAt": "2026-04-19",
        "type": "statute"
      },
      {
        "id": "wi-3",
        "title": "Wis. Stat. § 995.20, Wisconsin State Legislature",
        "url": "https://web.archive.org/web/20260303050923id_/https://docs.legis.wisconsin.gov/statutes/statutes/995/20",
        "retrievedAt": "2026-03-03",
        "type": "statute"
      },
      {
        "id": "wv-0",
        "title": "W. Va. Code § 38-2-14, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251207221646id_/https://code.wvlegislature.gov/38-2-14/",
        "retrievedAt": "2025-12-07",
        "type": "statute"
      },
      {
        "id": "wv-1",
        "title": "W. Va. Code § 38-2-8, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251117192814id_/https://code.wvlegislature.gov/38-2-8/",
        "retrievedAt": "2025-11-17",
        "type": "statute"
      },
      {
        "id": "wv-2",
        "title": "W. Va. Code § 38-2-9, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251118044727id_/https://code.wvlegislature.gov/38-2-9/",
        "retrievedAt": "2025-11-18",
        "type": "statute"
      },
      {
        "id": "wv-3",
        "title": "W. Va. Code § 38-2-2, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251113172756id_/https://code.wvlegislature.gov/38-2-2/",
        "retrievedAt": "2025-11-13",
        "type": "statute"
      },
      {
        "id": "wv-4",
        "title": "W. Va. Code § 38-2-10, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251212174906id_/https://code.wvlegislature.gov/38-2-10/",
        "retrievedAt": "2025-12-12",
        "type": "statute"
      },
      {
        "id": "wv-5",
        "title": "W. Va. Code § 38-2-11, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251113052420id_/https://code.wvlegislature.gov/38-2-11/",
        "retrievedAt": "2025-11-13",
        "type": "statute"
      },
      {
        "id": "wv-6",
        "title": "W. Va. Code § 38-2-12, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251217034957id_/https://code.wvlegislature.gov/38-2-12/",
        "retrievedAt": "2025-12-17",
        "type": "statute"
      },
      {
        "id": "wv-7",
        "title": "W. Va. Code § 38-2-13, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251116024630id_/https://code.wvlegislature.gov/38-2-13/",
        "retrievedAt": "2025-11-16",
        "type": "statute"
      },
      {
        "id": "wv-8",
        "title": "W. Va. Code § 38-2-34, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251113181843id_/https://code.wvlegislature.gov/38-2-34/",
        "retrievedAt": "2025-11-13",
        "type": "statute"
      },
      {
        "id": "wv-9",
        "title": "W. Va. Code § 2-2-1, West Virginia Legislature",
        "url": "https://web.archive.org/web/20251201094423id_/https://code.wvlegislature.gov/2-2-1/",
        "retrievedAt": "2025-12-01",
        "type": "statute"
      },
      {
        "id": "wv-10",
        "title": "W. Va. Senate Bill 793 (2026 Regular Session), enrolled, West Virginia Legislature",
        "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      },
      {
        "id": "wy-0",
        "title": "Wyo. Stat. title 29 (Liens), Wyoming Legislature",
        "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
        "retrievedAt": "2026-10-03",
        "type": "statute"
      }
    ],
    "changelog": [
      {
        "date": "2026-10-01",
        "change": "Dataset first published: 9 of 51 jurisdictions published",
        "fields": []
      },
      {
        "date": "2026-10-02",
        "change": "10 more jurisdictions published: Alabama, Alaska, Arkansas, Colorado, Connecticut, Delaware, District of Columbia, Hawaii, Idaho and Indiana",
        "fields": []
      },
      {
        "date": "2026-10-02",
        "change": "10 more jurisdictions published: Iowa, Kansas, Louisiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi and Missouri",
        "fields": []
      },
      {
        "date": "2026-10-03",
        "change": "10 more jurisdictions published: Montana, Nebraska, Nevada, New Hampshire, New Mexico, North Dakota, Oklahoma, Oregon, Rhode Island and South Carolina",
        "fields": []
      },
      {
        "date": "2026-10-03",
        "change": "9 more jurisdictions published: South Dakota, Tennessee, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin and Wyoming",
        "fields": []
      }
    ],
    "fieldNotes": {
      "projectType": "A rule's projectType \"commercial\" covers every project outside the state's residential definition, and the site displays it as \"Other than residential\". \"residential\" follows the residentialDefinition of the record; \"any\" is both."
    }
  },
  "records": [
    {
      "jurisdiction": "AK",
      "name": "Alaska",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "AS 34.35.050 to 34.35.140",
      "statuteUrl": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
      "summary": "Alaska gives a claimant 120 days after completing the construction contract or ceasing to furnish labor, material, services, or equipment to record a claim of lien, where the owner records no notice of completion; after the owner records one, a claimant who received advance notification of its recording date or has not given a notice of right to lien records a claim of lien or a notice of right to lien within 15 days after the notice of completion is recorded. A lien does not bind the property for more than six months after the claim of lien is recorded unless an action to enforce it is commenced within that time, or within six months after an extension notice recorded within the original six months.",
      "effectiveOrAmended": null,
      "quotes": [
        {
          "id": "ak-q1",
          "text": "Before furnishing labor, material, service, or equipment for a project, a person may give a notice of right to lien to the owner or owner's agent.",
          "citation": "AS 34.35.064(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q2",
          "text": "(a) If a notice of completion is not recorded by the owner as provided in AS 34.35.071, a claim of lien shall be recorded not later than 120 days after the claimant (1) completes the construction contract; or (2) ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property.",
          "citation": "AS 34.35.068(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ak-q3",
          "text": "A claim of lien is enforceable only if recorded by a claimant within the time specified in (a) or (b) of this section.",
          "citation": "AS 34.35.068(c)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q4",
          "text": "(b) If a notice of completion is recorded by the owner as provided in AS 34.35.071, (1) the following shall record a claim of lien or a notice of right to lien not later than 15 days after the notice of completion is recorded: (A) a claimant who has received advance notification of the date that the notice of completion is recorded as provided in AS 34.35.071(a)(2); (B) a claimant who has not given a notice of right to lien as permitted in AS 34.35.064; (2) the following shall record a claim of lien not later than the time specified in (a) of this section: (A) a claimant who records a notice of right to lien before or within the period specified in (1) of this subsection; (B) a claimant who has given a notice of right to lien but who has not received advance notice of the date that the notice of completion is recorded by the owner as provided in AS 34.35.071(a)(2).",
          "citation": "AS 34.35.068(b)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ak-q5",
          "text": "(a) A lien provided for in AS 34.35.050  34.35.120 does not bind real property for more than six months after the claim of lien is recorded, unless an action is commenced in the proper court to enforce the lien within (1) that time; or (2) six months after recording of an extension notice in the same recording office within the original six-month period showing the recording date and the book and page or instrument number or serial number of the initial claim of lien, and the balance owing.",
          "citation": "AS 34.35.080(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ak-q6",
          "text": "(a) The owner of real property that may be subject to a lien under AS 34.35.050  34.35.120 may announce the date of completion of the project by (1) recording a notice of completion after completion of the project in the office of the recorder of the district in which the real property is situated; and (2) giving notice at least five days before the recording of the notice of completion to all claimants who have given a notice of right to lien or a stop-lending notice to the owner and the lender prior to 10 days before recording a notice of completion; the notice must include a copy of the notice of completion and a statement advising claimants that a notice of completion will be recorded not earlier than five days after the date of the notice.",
          "citation": "AS 34.35.071(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ak-q7",
          "text": "(d) A notice of completion is not effective if recorded before completion.",
          "citation": "AS 34.35.071(d)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=34.35.050&secEnd=34.35.140",
          "sourceId": "ak-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ak-q8",
          "text": "The time in which an act provided by law is required to be done is computed by excluding the first day and including the last, unless the last day is a holiday, and then it is also excluded.",
          "citation": "AS 01.10.080",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=01.10.080&secEnd=01.10.080",
          "sourceId": "ak-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q9",
          "text": "(13) every Sunday;",
          "citation": "AS 44.12.010(a)(13)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
          "sourceId": "ak-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q10",
          "text": "(a) The following days are legal holidays:",
          "citation": "AS 44.12.010(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
          "sourceId": "ak-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q11",
          "text": "(1) the first of January, known as New Year's Day; (2) the third Monday of January, known as Martin Luther King, Jr.'s Birthday as provided in (b) of this section; (3) the third Monday in February, known as Presidents' Day; (4) the last Monday of March, known as Seward's Day; (5) the last Monday in May, known as Memorial Day; (6) the 19th of June, known as Juneteenth Day; (7) the fourth of July, known as Independence Day; (8) the first Monday in September, known as Labor Day; (9) the 18th of October, known as Alaska Day; (10) the 11th of November, known as Veterans' Day; (11) the fourth Thursday in November, known as Thanksgiving Day; (12) the 25th of December, known as Christmas Day; (13) every Sunday;",
          "citation": "AS 44.12.010(a)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
          "sourceId": "ak-2",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "ak-q12",
          "text": "(14) every day designated by public proclamation by the President of the United States or the governor of the state as a legal holiday.",
          "citation": "AS 44.12.010(a)(14)",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
          "sourceId": "ak-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ak-q13",
          "text": "If a holiday listed in AS 44.12.010, except AS 44.12.010(a)(13), falls on a Sunday, Sunday and the following Monday are both legal holidays.",
          "citation": "AS 44.12.020",
          "url": "https://www.akleg.gov/basis/statutes.asp?media=print&secStart=44.12.010&secEnd=44.12.025",
          "sourceId": "ak-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ak-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ak-q1"
          ]
        },
        {
          "id": "ak-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of completion is not recorded by the owner as provided in AS 34.35.071",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "A claim of lien is enforceable only if recorded within the time AS 34.35.068 specifies.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ak-q2",
            "ak-q3"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant completes the construction contract or ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property"
            }
          ]
        },
        {
          "id": "ak-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a notice of completion is recorded by the owner, for a claimant who has received advance notification of the date it is recorded or who has not given a notice of right to lien, to record a claim of lien or a notice of right to lien",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "A claim of lien is enforceable only if recorded within the time AS 34.35.068 specifies.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ak-q4",
            "ak-q3"
          ]
        },
        {
          "id": "ak-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a notice of completion is recorded by the owner, for a claimant who records a notice of right to lien before or within that 15-day period, or who has given a notice of right to lien but has not received advance notice of the date the notice of completion is recorded",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "A claim of lien is enforceable only if recorded within the time AS 34.35.068 specifies.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ak-q4",
            "ak-q2",
            "ak-q3"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant completes the construction contract or ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property"
            }
          ]
        },
        {
          "id": "ak-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien does not bind real property for more than six months after the claim of lien is recorded unless an action to enforce it is commenced in the proper court within that time, or within six months after an extension notice recorded in the same recording office within the original six-month period.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ak-q5"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is recorded"
            }
          ],
          "mayChangeIf": "an extension notice is recorded within the original six-month period"
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "The owner may announce the date of completion by recording a notice of completion after completion of the project, and by giving notice at least five days before recording it to every claimant who gave the owner and the lender a notice of right to lien or a stop-lending notice earlier than 10 days before the recording. A notice of completion recorded before completion is not effective.",
          "quoteIds": [
            "ak-q6",
            "ak-q7"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ak-q8"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ak-q8",
            "ak-q9"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s Birthday",
            "quoteId": "ak-q10",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "ak-q10",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Seward's Day",
            "quoteId": "ak-q10",
            "kind": "last-weekday",
            "month": 3,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "ak-q10",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "ak-q10",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Alaska Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 10,
            "day": 18,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ak-q10",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "ak-q10",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ak-q10",
          "ak-q11",
          "ak-q12",
          "ak-q13"
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the claimant completes the construction contract or ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property",
          "input": "Construction contract completed, or furnishing ceased, on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is recorded",
          "input": "Claim of lien recorded on",
          "hint": "Leave empty if no claim of lien has been recorded."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "ak-0",
        "ak-1",
        "ak-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "AL",
      "name": "Alabama",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Ala. Code §§ 35-11-210 to 35-11-234",
      "statuteUrl": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-215",
      "summary": "Alabama gives an original contractor six months, a journeyman or day laborer 30 days, and every other lien claimant four months after the last item of work or labor is performed or the last item of any material, fixture, engine, boiler, or machinery is furnished to file the statement of lien in the office of the judge of probate. An action to enforce the lien must be commenced within six months after the maturity of the entire debt it secures, except as otherwise provided in the division.",
      "effectiveOrAmended": "Section 35-11-210 was last amended by Acts 1996, 1st Ex. Sess., No. 96-26. Sections 35-11-215, 35-11-218 and 35-11-221 carry no amendment after the Code of 1940.",
      "quotes": [
        {
          "id": "al-q1",
          "text": "But if the person, firm, or corporation, before furnishing any material, shall notify the owner or his or her agent in writing that certain specified material will be furnished by him or her to the contractor or subcontractor for use in the building or improvements on the land of the owner or proprietor at certain specified prices, unless the owner or proprietor or his or her agent objects thereto, the furnisher of the material shall have a lien for the full price thereof as specified in the notice to the owner or proprietor without regard to whether or not the amount of the claim for the material so furnished exceeds the unpaid balance due the contractor, unless on the notice herein provided for being given, the owner or proprietor or his or her agent shall notify the furnisher in writing before the material is used, that he or she will not be responsible for the price thereof.",
          "citation": "Ala. Code § 35-11-210",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-210",
          "sourceId": "al-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "al-q2",
          "text": "Every person, except the original contractor, who may wish to avail himself of the provisions of this division, shall before filing his statement in the office of the judge of probate, give notice in writing to the owner or proprietor, or his agent, that he claims a lien on such building or improvement, setting forth the amount thereof, for what, and from whom it is owing; and after such notice, any unpaid balance in the hands of the owner or proprietor shall be held subject to such lien.",
          "citation": "Ala. Code § 35-11-218",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-218",
          "sourceId": "al-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "al-q3",
          "text": "But the provisions of this section shall not apply to the case of any material furnished for such building or improvement, of which the owner was notified in advance as provided in Section 35-11-210.",
          "citation": "Ala. Code § 35-11-218",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-218",
          "sourceId": "al-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "al-q4",
          "text": "The lien declared in this division shall be deemed lost unless the statement referred to in Section 35-11-213 shall be filed by every original contractor within six months and by every journeyman and day laborer within 30 days, and by every other person entitled to such lien within four months, after the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished for any building or improvement on land or for repairing, altering, or beautifying the same under or by virtue of any contract with the owner or proprietor thereof, or his agent, architect, trustee, contractor, or subcontractor.",
          "citation": "Ala. Code § 35-11-215",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-215",
          "sourceId": "al-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "al-q5",
          "text": "Any action for the enforcement of the lien declared in this division must be commenced within six months after the maturity of the entire indebtedness secured thereby, except as otherwise provided in this division.",
          "citation": "Ala. Code § 35-11-221",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=35-11-221",
          "sourceId": "al-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "al-q6",
          "text": "Time within which any act is provided by law to be done must be computed by excluding the first day and including the last.",
          "citation": "Ala. Code § 1-1-4",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-1-4",
          "sourceId": "al-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "al-q7",
          "text": "However, if the last day is Sunday, or a legal holiday as defined in Section 1-3-8, or a day on which the office in which the act must be done shall close as permitted by any law of this state, the last day also must be excluded, and the next succeeding secular or working day shall be counted as the last day within which the act may be done.",
          "citation": "Ala. Code § 1-1-4",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-1-4",
          "sourceId": "al-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "al-q8",
          "text": "(a) The following days are official state holidays:",
          "citation": "Ala. Code § 1-3-8(a)",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
          "sourceId": "al-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "al-q9",
          "text": "(12) Thanksgiving Day, as designated by the Governor.",
          "citation": "Ala. Code § 1-3-8(a)(12)",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
          "sourceId": "al-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "al-q10",
          "text": "(1) New Year’s Day, January 1. (2) Martin Luther King, Jr.‘s birthday and Robert E. Lee’s birthday, the third Monday in January. (3) George Washington’s birthday and Thomas Jefferson’s birthday, the third Monday in February. (4) Confederate Memorial Day, the fourth Monday in April. (5) Memorial Day, the last Monday in May. (6) Jefferson Davis’ birthday, the first Monday in June. (7) Juneteenth, June 19. (8) The Fourth of July, July 4. (9) Labor Day, the first Monday in September. (10) Columbus Day, Fraternal Day, and American Indian Heritage Day, the second Monday in October. (11) Veterans’ Day, November 11.",
          "citation": "Ala. Code § 1-3-8(a)",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
          "sourceId": "al-5",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "al-q11",
          "text": "(13) Christmas Day, December 25.",
          "citation": "Ala. Code § 1-3-8(a)(13)",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
          "sourceId": "al-5",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "al-q12",
          "text": "(b) If any holiday falls on Sunday, the following day is the holiday. If any holiday falls on Saturday, the preceding day is the holiday.",
          "citation": "Ala. Code § 1-3-8(b)",
          "url": "https://alison.legislature.state.al.us/code-of-alabama?section=1-3-8",
          "sourceId": "al-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "al-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "al-q1"
          ]
        },
        {
          "id": "al-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Except for material of which the owner was notified in advance as provided in Section 35-11-210",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before the statement is filed in the office of the judge of probate"
          },
          "consequence": null,
          "recipients": [
            "The owner or proprietor, or his agent"
          ],
          "delivery": "In writing, setting forth the amount, for what, and from whom it is owing.",
          "quoteIds": [
            "al-q2",
            "al-q3"
          ]
        },
        {
          "id": "al-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien is lost unless the statement is filed within this time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "al-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished"
            }
          ]
        },
        {
          "id": "al-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For every journeyman and day laborer",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "The lien is lost unless the statement is filed within this time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "al-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished"
            }
          ]
        },
        {
          "id": "al-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": "The lien is lost unless the statement is filed within this time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "al-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished"
            }
          ]
        },
        {
          "id": "al-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Six months after the maturity of the entire indebtedness secured by the lien, except as otherwise provided in the division"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "al-q5"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "al-q6"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "al-q7"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "al-q8",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s birthday and Robert E. Lee's birthday",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "George Washington's birthday and Thomas Jefferson's birthday",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Confederate Memorial Day",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 4,
            "weekday": 1,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "al-q8",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Jefferson Davis' birthday",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 6,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "al-q8",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The Fourth of July",
            "quoteId": "al-q8",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day, Fraternal Day, and American Indian Heritage Day",
            "quoteId": "al-q8",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "al-q8",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "al-q9",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": "Ala. Code § 1-3-8(a)(12) names the day designated by the Governor; modeled as the fourth Thursday."
          },
          {
            "name": "Christmas Day",
            "quoteId": "al-q8",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "al-q8",
          "al-q10",
          "al-q9",
          "al-q11",
          "al-q12"
        ],
        "closure": {
          "clause": "on which the office in which the act must be done closes as permitted by any law of this state",
          "place": "the office",
          "quoteIds": [
            "al-q7"
          ]
        }
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished",
          "input": "Last item of work, labor or material performed or furnished on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "al-0",
        "al-1",
        "al-2",
        "al-3",
        "al-4",
        "al-5"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "AR",
      "name": "Arkansas",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Ark. Code Ann. § 18-44-101 et seq.",
      "statuteUrl": "https://www.lexisnexis.com/hottopics/arcode/",
      "summary": "Arkansas gives a claimant 120 days after the things specified in the subchapter have been furnished or the work or labor done or performed to file the lien account with the clerk of the circuit court, with 10 days' notice to the owner before filing, and actions on the lien are commenced within 15 months after it is filed. Before work commences on residential real estate of four or fewer units, the residential contractor gives the owner a statutory notice unless it supplies a performance and payment bond or the transaction is a direct sale to the property owner; on commercial real estate a subcontractor, service provider, material supplier, or laborer notifies the owner and the contractor before 75 days have elapsed from the time the labor was supplied or the materials furnished.",
      "effectiveOrAmended": "Section 18-44-115 was last amended by Acts 2021, No. 984; section 18-44-117 by Acts 2019, No. 806; section 18-44-114 by Acts 2009, No. 454; and section 18-44-119 by Acts 2005, No. 2287. The code text is current through the First Extraordinary Session, 2026.",
      "quotes": [
        {
          "id": "ar-q1",
          "text": "(1) No lien upon residential real estate containing four (4) or fewer units may be acquired by virtue of this subchapter unless the owner of the residential real estate, the owner's authorized agent, or the owner's registered agent has received, by personal delivery or by certified mail, a copy of the notice set out in this subsection.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q2",
          "text": "(3) It shall be the duty of the residential contractor to give the owner, the owner's authorized agent, or the owner's registered agent the notice set out in this subsection on behalf of all potential lien claimants before the commencement of work.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(3)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q3",
          "text": "(4) If a residential contractor fails to give the notice required under this subsection, then the residential contractor may not avail himself or herself of the benefit of the lien provided for in this subchapter.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(4)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q4",
          "text": "(A) If the residential contractor supplies a performance and payment bond or if the transaction is a direct sale to the property owner, the notice requirement of this subsection shall not apply, and the lien rights arising under this subchapter shall not be conditioned on the delivery and execution of the notice.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(8)(A)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q5",
          "text": "(A) Any potential lien claimant may also give notice.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(5)(A)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q6",
          "text": "(C) However, no lien may be claimed by any subcontractor, laborer, material supplier, or other lien claimant unless the owner of the residential real estate, the owner's authorized agent, or the owner's registered agent has received at least one (1) copy of the notice, which need not have been given by the particular lien claimant.",
          "citation": "Ark. Code Ann. § 18-44-115(a)(5)(C)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q7",
          "text": "(4) No subcontractor, service provider, material supplier, or laborer shall be entitled to a lien upon commercial real estate unless the subcontractor, service provider, material supplier, or laborer notifies the owner of the commercial real estate being constructed or improved, the owner's authorized agent, or the owner's registered agent in writing that the subcontractor, service provider, material supplier, or laborer is currently entitled to payment but has not been paid.",
          "citation": "Ark. Code Ann. § 18-44-115(b)(4)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q8",
          "text": "(A) The notice shall be sent to the owner, the owner's authorized agent, or the owner's registered agent and to the contractor before seventy-five (75) days have elapsed from the time that the labor was supplied or the materials furnished.",
          "citation": "Ark. Code Ann. § 18-44-115(b)(5)(A)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q9",
          "text": "(3) Because supplying the notice specified in subsection (a) of this section imposes a substantial burden on laborers, subcontractors, service providers, and material suppliers, the notice requirement mandated under subsection (a) of this section as a condition precedent to the imposition of a lien by a laborer, subcontractor, service provider, or material supplier shall apply only to construction of or improvement to residential real estate containing four (4) or fewer units.",
          "citation": "Ark. Code Ann. § 18-44-115(b)(3)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q10",
          "text": "(a) Every person who may wish to avail himself or herself of the benefit of the provisions of this subchapter shall give ten (10) days' notice before the filing of the lien, as required in § 18-44-117(a), to the owner of a building or improvement that he or she holds a claim against the building or improvement, setting forth the amount and from whom it is due.",
          "citation": "Ark. Code Ann. § 18-44-114(a)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q11",
          "text": "(1) A person who wishes to avail himself or herself of the provisions of this subchapter has a duty to file with the clerk of the circuit court of the county in which the building, erection, or other improvement to be charged with the lien is situated and within one hundred twenty (120) days after the things specified in this subchapter have been furnished or the work or labor done or performed:",
          "citation": "Ark. Code Ann. § 18-44-117(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q12",
          "text": "(a) All actions under this subchapter shall be commenced within fifteen (15) months after filing the lien and prosecuted without unnecessary delay to final judgment.",
          "citation": "Ark. Code Ann. § 18-44-119(a)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q13",
          "text": "(b) No lien shall continue to exist by virtue of the provisions of this subchapter for more than fifteen (15) months after the lien is filed, unless within that time:",
          "citation": "Ark. Code Ann. § 18-44-119(b)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q14",
          "text": "(1) An action shall be instituted as described in this subchapter; and",
          "citation": "Ark. Code Ann. § 18-44-119(b)(1)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q15",
          "text": "(2) A lis pendens is filed under § 16-59-101 et seq.",
          "citation": "Ark. Code Ann. § 18-44-119(b)(2)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q16",
          "text": "(A) “Commercial real estate” means:",
          "citation": "Ark. Code Ann. § 18-44-115(b)(2)(A)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q17",
          "text": "(i) Nonresidential real estate; and",
          "citation": "Ark. Code Ann. § 18-44-115(b)(2)(A)(i)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ar-q18",
          "text": "(ii) Residential real estate containing five (5) or more units; and",
          "citation": "Ark. Code Ann. § 18-44-115(b)(2)(A)(ii)",
          "url": "https://www.lexisnexis.com/hottopics/arcode/",
          "sourceId": "ar-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ar-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before the commencement of work, unless the residential contractor supplies a performance and payment bond or the transaction is a direct sale to the property owner"
          },
          "consequence": "If the residential contractor fails to give the notice, the residential contractor may not avail himself or herself of the benefit of the lien.",
          "recipients": [
            "The owner, the owner's authorized agent, or the owner's registered agent"
          ],
          "delivery": "By personal delivery or by certified mail.",
          "quoteIds": [
            "ar-q1",
            "ar-q2",
            "ar-q3",
            "ar-q4"
          ]
        },
        {
          "id": "ar-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "No lien may be claimed unless the owner, the owner's authorized agent, or the owner's registered agent has received at least one copy of the notice, which any potential lien claimant may give and which need not have been given by the particular lien claimant. This does not apply where the residential contractor supplies a performance and payment bond or the transaction is a direct sale to the property owner"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ar-q1",
            "ar-q5",
            "ar-q6",
            "ar-q4"
          ]
        },
        {
          "id": "ar-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before 75 days have elapsed from the time that the labor was supplied or the materials furnished"
          },
          "consequence": "Without this notice in writing, the statute gives a subcontractor, service provider, material supplier, or laborer no lien upon commercial real estate.",
          "recipients": [
            "The owner, the owner's authorized agent, or the owner's registered agent",
            "The contractor"
          ],
          "delivery": null,
          "quoteIds": [
            "ar-q7",
            "ar-q8",
            "ar-q9"
          ]
        },
        {
          "id": "ar-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ar-q9",
            "ar-q7"
          ]
        },
        {
          "id": "ar-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Ten days' notice before the filing of the lien"
          },
          "consequence": null,
          "recipients": [
            "The owner of the building or improvement"
          ],
          "delivery": null,
          "quoteIds": [
            "ar-q10"
          ]
        },
        {
          "id": "ar-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ar-q11"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the things specified in the subchapter have been furnished or the work or labor done or performed"
            }
          ]
        },
        {
          "id": "ar-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "No lien continues to exist for more than 15 months after it is filed unless, within that time, an action is instituted and a lis pendens is filed.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ar-q12",
            "ar-q13",
            "ar-q14",
            "ar-q15"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means residential real estate containing four or fewer units. Commercial real estate is nonresidential real estate and residential real estate containing five or more units.",
        "quoteIds": [
          "ar-q9",
          "ar-q16",
          "ar-q17",
          "ar-q18"
        ]
      },
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the things specified in the subchapter have been furnished or the work or labor done or performed",
          "input": "Things furnished, or work or labor done or performed, on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the lien is filed",
          "input": "Lien filed on",
          "hint": "Leave empty if no lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ar-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "AZ",
      "name": "Arizona",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Ariz. Rev. Stat. §§ 33-981 to 33-1008",
      "statuteUrl": "https://www.azleg.gov/ars/33/00993.htm",
      "summary": "Arizona gives 120 days after completion to record a lien, or 60 days after a notice of completion is recorded, and six months after recording to bring an action to enforce it and record a notice of pendency of action. Claimants other than wage laborers serve a preliminary twenty day notice within 20 days after first furnishing to the jobsite.",
      "effectiveOrAmended": "Section 33-992.01 was amended by Laws 2024, ch. 89 (H.B. 2110), approved April 8, 2024.",
      "quotes": [
        {
          "id": "az-q1",
          "text": "Except for a person performing actual labor for wages, every person who furnishes labor, professional services, materials, machinery, fixtures or tools for which a lien otherwise may be claimed under this article shall, as a necessary prerequisite to the validity of any claim of lien, serve the owner or reputed owner, the original contractor or reputed contractor, the construction lender, if any, or reputed construction lender, if any, and the person with whom the claimant has contracted for the purchase of those items with a written preliminary twenty day notice as prescribed by this section.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(B)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q2",
          "text": "shall be given not later than twenty days after the claimant has first furnished labor, professional services, materials, machinery, fixtures or tools to the jobsite",
          "citation": "Ariz. Rev. Stat. § 33-992.01(C)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q3",
          "text": "The person, however, is entitled to claim a lien only for such labor, professional services, materials, machinery, fixtures or tools furnished within twenty days before the service of the notice and at any time thereafter.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(E)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q4",
          "text": "The notice or notices required by this section may be given by mailing the notice by first class mail sent with a certificate of mailing, registered or certified mail, postage prepaid in all cases, addressed to the person to whom notice is to be given at the person's residence or business address. Service is complete at the time of the deposit of notice in the mail.",
          "citation": "Ariz. Rev. Stat. § 33-992.01(F)",
          "url": "https://www.azleg.gov/ars/33/00992-01.htm",
          "sourceId": "az-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q5",
          "text": "An Act amending section 33-992.01, Arizona Revised Statutes; relating to mechanics' and materialmen's liens.",
          "citation": "Laws 2024, ch. 89 (H.B. 2110)",
          "url": "https://www.azleg.gov/legtext/56leg/2R/laws/0089.htm",
          "sourceId": "az-1",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q6",
          "text": "within one hundred twenty days after completion of a building, structure or improvement, or any alteration or repair of such building, structure or improvement, or if a notice of completion has been recorded, within sixty days after recordation of such notice",
          "citation": "Ariz. Rev. Stat. § 33-993(A)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q7",
          "text": "such person shall have one hundred twenty days from completion as defined in section 33-993 to impress and secure the lien provided for in this article.",
          "citation": "Ariz. Rev. Stat. § 33-993(I)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q8",
          "text": "within a reasonable time thereafter serve the remaining copy upon the owner of the building, structure or improvement, if he can be found within the county.",
          "citation": "Ariz. Rev. Stat. § 33-993(A)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q9",
          "text": "A lien granted under the provisions of this article shall not continue for a longer period than six months after it is recorded, unless action is brought within that period to enforce the lien and a notice of pendency of action is recorded pursuant to section 12-1191 in the office of the county recorder in the county where the property is located.",
          "citation": "Ariz. Rev. Stat. § 33-998(A)",
          "url": "https://www.azleg.gov/ars/33/00998.htm",
          "sourceId": "az-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q10",
          "text": "No lien provided for in this article shall be allowed or recorded by the person claiming a lien against the dwelling of a person who became an owner-occupant prior to the construction, alteration, repair or improvement, except by a person having executed in writing a contract directly with the owner-occupant.",
          "citation": "Ariz. Rev. Stat. § 33-1002(B)",
          "url": "https://www.azleg.gov/ars/33/01002.htm",
          "sourceId": "az-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q11",
          "text": "B. For purposes of this section, if a work of improvement consists of the construction for residential occupancy of more than one separate building without regard to whether the buildings are constructed pursuant to separate contracts or a single contract, each building is a separate work and the time within which to perfect a lien by recording the notice of lien pursuant to subsection A of this section commences to run on the completion of each separate building. For purposes of this subsection, \"separate building\" means one structure of a work of improvement and any garages or other appurtenant buildings in a multibuilding residential project or residential subdivision.",
          "citation": "Ariz. Rev. Stat. § 33-993(B)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q12",
          "text": "C. For the purposes of subsection A of this section, \"completion\" means the earliest of the following events: 1. Thirty days after final inspection and written final acceptance by the governmental body which issued the building permit for the building, structure or improvement. 2. Cessation of labor for a period of sixty consecutive days, except when such cessation of labor is due to a strike, shortage of materials or act of God.",
          "citation": "Ariz. Rev. Stat. § 33-993(C)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q13",
          "text": "D. If no building permit is issued or if the governmental body that issued the building permit for the building, structure or improvement does not issue final inspections and written final acceptances, then \"completion\" for the purposes of subsection A of this section means the last date on which any labor, materials, fixtures or tools were furnished to the property.",
          "citation": "Ariz. Rev. Stat. § 33-993(D)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "az-q14",
          "text": "I. If a notice of completion has been recorded, the person recording the notice, within fifteen days of recording, shall mail by certified or registered mail postage prepaid a copy of the notice of completion and a written statement of the date of recording and the county recorder's record location information to the original contractor and all persons from whom the owner has previously received a preliminary twenty day notice. In the event the owner or its agent fails to mail a copy of the notice of completion and a written statement of the date of recording and the county recorder's record location information within fifteen days of recording to any person from whom the owner has received a preliminary twenty day notice, such person shall have one hundred twenty days from completion as defined in section 33-993 to impress and secure the lien provided for in this article.",
          "citation": "Ariz. Rev. Stat. § 33-993(I)",
          "url": "https://www.azleg.gov/ars/33/00993.htm",
          "sourceId": "az-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q15",
          "text": "the time in which an act is required to be done shall be computed by excluding the first day and including the last day, unless the last day is a holiday, and then it is also excluded.",
          "citation": "A.R.S. § 1-243(A)",
          "url": "https://www.azleg.gov/ars/1/00243.htm",
          "sourceId": "az-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q16",
          "text": "When anything of a secular nature, other than a work of necessity or charity, is provided or agreed to be done upon a day named or within a time named, and the day or the last day thereof falls on a holiday, it may be performed on the next ensuing business day with effect as though performed on the appointed day.",
          "citation": "A.R.S. § 1-303",
          "url": "https://www.azleg.gov/ars/1/00303.htm",
          "sourceId": "az-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q17",
          "text": "1. Sunday of each week.",
          "citation": "A.R.S. § 1-301(A)(1)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q18",
          "text": "A. The following days shall be holidays:",
          "citation": "A.R.S. § 1-301(A)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q19",
          "text": "1. Sunday of each week. 2. January 1, \"New Year's Day\". 3. Third Monday in January, \"Martin Luther King, Jr./Civil Rights Day\". 4. Third Monday in February, \"Lincoln/Washington Presidents' Day\". 5. Second Sunday in May, \"Mothers' Day\". 6. Last Monday in May, \"Memorial Day\". 7. June 2, \"Native American Day\". 8. Third Sunday in June, \"Fathers' Day\". 9. July 4, \"Independence Day\". 10. First Sunday in August, \"American Family Day\". 11. August 14, \"National Navajo Code Talkers Day\". 12. First Monday in September, \"Labor Day\". 13. September 17, \"Constitution Commemoration Day\". 14. Second Monday in October, \"Columbus Day\". 15. November 11, \"Veterans' Day\". 16. Fourth Thursday in November, \"Thanksgiving Day\". 17. December 25, \"Christmas Day\".",
          "citation": "A.R.S. § 1-301(A)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "az-q20",
          "text": "B. When any of the holidays enumerated in subsection A of this section falls on a Sunday, the following Monday shall be observed as a holiday, with the exception of the holidays enumerated in subsection A, paragraphs 1, 5, 7, 8, 10, 11 and 13 of this section.",
          "citation": "A.R.S. § 1-301(B)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "az-q21",
          "text": "C. When any of the holidays enumerated in subsection A, paragraphs 2, 9, 15 and 17 of this section falls on a Saturday, the preceding Friday shall be observed as a holiday.",
          "citation": "A.R.S. § 1-301(C)",
          "url": "https://www.azleg.gov/ars/1/00301.htm",
          "sourceId": "az-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "az-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "Serving the notice is a necessary prerequisite to the validity of any claim of lien. A late notice supports a lien only for items furnished within twenty days before it is served and after.",
          "recipients": [
            "The owner or reputed owner",
            "The original contractor or reputed contractor",
            "The construction lender, if any, or reputed construction lender, if any",
            "The person with whom the claimant has contracted for the purchase of those items"
          ],
          "delivery": "May be given by first class mail sent with a certificate of mailing, or registered or certified mail, postage prepaid; service is complete when the notice is deposited in the mail.",
          "quoteIds": [
            "az-q1",
            "az-q2",
            "az-q3",
            "az-q4",
            "az-q5"
          ]
        },
        {
          "id": "az-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q1"
          ]
        },
        {
          "id": "az-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q6"
          ]
        },
        {
          "id": "az-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a notice of completion has been recorded",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q6",
            "az-q7"
          ]
        },
        {
          "id": "az-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Within a reasonable time after the claim is recorded, if the owner can be located within the county."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q8"
          ]
        },
        {
          "id": "az-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien does not continue longer than six months after it is recorded unless an action to enforce it is brought within that time and a notice of pendency of action is recorded.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "az-q9"
          ]
        }
      ],
      "residential": [
        {
          "text": "No lien may be allowed or recorded against the dwelling of a person who became an owner-occupant before the work, except by a person who executed a written contract directly with the owner-occupant.",
          "quoteIds": [
            "az-q10"
          ]
        },
        {
          "text": "Where a work of improvement consists of the construction of more than one separate building for residential occupancy, under one contract or several, each building is a separate work, and the time to record a lien runs from the completion of each building.",
          "quoteIds": [
            "az-q11"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "For the lien period, completion means the earlier of 30 days after final inspection and written final acceptance by the government body that issued the building permit, and cessation of labor for 60 consecutive days, except when caused by a strike, shortage of materials or act of God.",
          "quoteIds": [
            "az-q12"
          ]
        },
        {
          "text": "Where no building permit is issued, or the government body that issued it does not issue final inspections and written final acceptances, completion for the lien period means the last date on which any labor, materials, fixtures or tools were furnished to the property.",
          "quoteIds": [
            "az-q13"
          ]
        },
        {
          "text": "A person who records a notice of completion must mail a copy, with the recording details, by certified or registered mail within 15 days of recording to the original contractor and to everyone from whom the owner received a preliminary twenty day notice. A person who gave that notice and is not mailed a copy within 15 days has 120 days from completion to secure the lien.",
          "quoteIds": [
            "az-q14"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "az-q15"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "az-q16",
            "az-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr./Civil Rights Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln/Washington Presidents' Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "az-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "az-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "az-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "az-q18",
          "az-q19",
          "az-q20",
          "az-q21"
        ]
      },
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "az-0",
        "az-1",
        "az-2",
        "az-3",
        "az-4",
        "az-5",
        "az-6",
        "az-7"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "CA",
      "name": "California",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Cal. Civ. Code §§ 8000 to 9566",
      "statuteUrl": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
      "summary": "In California a claim of lien is recorded before the earlier of 90 days after completion of the work of improvement and, if the owner records a notice of completion or cessation, 60 days after that recording for a direct contractor or 30 days after it for any other claimant. Every claimant except a laborer gives a preliminary notice within 20 days after first furnishing work; a direct contractor gives it only to the construction lender, if any.",
      "effectiveOrAmended": "Civil Code sections 8180 to 8466 were added by Stats. 2010, ch. 697 (SB 189), operative July 1, 2012.",
      "quotes": [
        {
          "id": "ca-q1",
          "text": "A preliminary notice shall be given not later than 20 days after the claimant has first furnished work on the work of improvement.",
          "citation": "Cal. Civ. Code § 8204(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
          "sourceId": "ca-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q2",
          "text": "The claimant shall, however, be entitled to record a lien, give a stop payment notice, and assert a claim against a payment bond only for work performed within 20 days prior to the service of the preliminary notice, and at any time thereafter.",
          "citation": "Cal. Civ. Code § 8204(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8204",
          "sourceId": "ca-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q3",
          "text": "Compliance with this section is a necessary prerequisite to the validity of a lien claim or stop payment notice under this title.",
          "citation": "Cal. Civ. Code § 8200(c)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q4",
          "text": "notice by mail under this part shall be given by registered or certified mail, express mail, or overnight delivery by an express service carrier.",
          "citation": "Cal. Civ. Code § 8110",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8110",
          "sourceId": "ca-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q5",
          "text": "A claimant with a direct contractual relationship with an owner or reputed owner is required to give preliminary notice only to the construction lender or reputed construction lender, if any.",
          "citation": "Cal. Civ. Code § 8200(e)(2)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q6",
          "text": "A laborer is not required to give preliminary notice.",
          "citation": "Cal. Civ. Code § 8200(e)(1)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8200",
          "sourceId": "ca-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q7",
          "text": "A direct contractor may not enforce a lien unless the contractor records a claim of lien after the contractor completes the direct contract, and before the earlier of the following times: (a) Ninety days after completion of the work of improvement. (b) Sixty days after the owner records a notice of completion or cessation.",
          "citation": "Cal. Civ. Code § 8412",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8412",
          "sourceId": "ca-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q8",
          "text": "If the owner fails to give notice to a person as required by subdivision (a), the notice is ineffective to shorten the time within which that person may record a claim of lien under Sections 8412 and 8414.",
          "citation": "Cal. Civ. Code § 8190(c)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q9",
          "text": "A claimant other than a direct contractor may not enforce a lien unless the claimant records a claim of lien within the following times: (a) After the claimant ceases to provide work. (b) Before the earlier of the following times: (1) Ninety days after completion of the work of improvement. (2) Thirty days after the owner records a notice of completion or cessation.",
          "citation": "Cal. Civ. Code § 8414",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8414",
          "sourceId": "ca-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q10",
          "text": "The claimant shall commence an action to enforce a lien within 90 days after recordation of the claim of lien. If the claimant does not commence an action to enforce the lien within that time, the claim of lien expires and is unenforceable.",
          "citation": "Cal. Civ. Code § 8460",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8460",
          "sourceId": "ca-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q11",
          "text": "(3) Cessation of labor for a continuous period of 60 days. (4) Recordation of a notice of cessation after cessation of labor for a continuous period of 30 days.",
          "citation": "Cal. Civ. Code § 8180(a)(3)-(4)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8180",
          "sourceId": "ca-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q12",
          "text": "An owner may record a notice of completion on or within 15 days after the date of completion of a work of improvement.",
          "citation": "Cal. Civ. Code § 8182(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8182",
          "sourceId": "ca-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q13",
          "text": "An owner that records a notice of completion or cessation shall, within 10 days of the date the notice of completion or cessation is filed for record, give a copy of the notice to all of the following persons: (1) A direct contractor. (2) A claimant that has given the owner preliminary notice.",
          "citation": "Cal. Civ. Code § 8190(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q14",
          "text": "A person that occupies the real property as a personal residence, if the dwelling contains four or fewer residential units.",
          "citation": "Cal. Civ. Code § 8190(d)(1)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8190",
          "sourceId": "ca-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q15",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day, and including the last, unless the last day is a holiday, and then it is also excluded.",
          "citation": "Cal. Code Civ. Proc. § 12",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12",
          "sourceId": "ca-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q16",
          "text": "For purposes of this part, “day” means a calendar day.",
          "citation": "Cal. Civ. Code § 8058",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CIV&sectionNum=8058",
          "sourceId": "ca-10",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q17",
          "text": "If the last day for the performance of any act provided or required by law to be performed within a specified period of time is a holiday, then that period is hereby extended to and including the next day that is not a holiday. For purposes of this section, “holiday” means all day on Saturdays, all holidays specified in Section 135 and, to the extent provided in Section 12b, all days that by terms of Section 12b are required to be considered as holidays.",
          "citation": "Cal. Code Civ. Proc. § 12a(a)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
          "sourceId": "ca-11",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q18",
          "text": "applies to Sections 659, 659a, and 921, and to all other provisions of law providing or requiring an act to be performed on a particular day or within a specified period of time, whether expressed in this or any other code or statute, ordinance, rule, or regulation.",
          "citation": "Cal. Code Civ. Proc. § 12a(b)",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12a",
          "sourceId": "ca-11",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q19",
          "text": "Every full day designated as a holiday by Section 6700 of the Government Code, including that Thursday of November declared by the President to be Thanksgiving Day, is a judicial holiday, except",
          "citation": "Cal. Code Civ. Proc. § 135",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
          "sourceId": "ca-12",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q20",
          "text": "Every Saturday and the day after Thanksgiving Day are judicial holidays.",
          "citation": "Cal. Code Civ. Proc. § 135",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=135",
          "sourceId": "ca-12",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ca-q21",
          "text": "If any city, county, state, or public office, other than a branch office, is closed for the whole of any day, insofar as the business of that office is concerned, that day shall be considered as a holiday for the purposes of computing time under Sections 12 and 12a.",
          "citation": "Cal. Code Civ. Proc. § 12b",
          "url": "https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=CCP&sectionNum=12b",
          "sourceId": "ca-13",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ca-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "Giving the notice is a necessary prerequisite to the validity of a lien claim. A claimant that gives it late may record a lien only for work performed within 20 days before the notice was served and after.",
          "recipients": null,
          "delivery": "Notice by mail is given by registered or certified mail, express mail, or overnight delivery by an express service carrier.",
          "quoteIds": [
            "ca-q1",
            "ca-q2",
            "ca-q3",
            "ca-q4"
          ]
        },
        {
          "id": "ca-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The construction lender or reputed construction lender, if any"
          ],
          "delivery": null,
          "quoteIds": [
            "ca-q5",
            "ca-q1"
          ]
        },
        {
          "id": "ca-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q6"
          ]
        },
        {
          "id": "ca-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "A direct contractor may not enforce a lien unless it records the claim of lien after it completes the direct contract and before the earlier of the two times the statute sets.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q7",
            "ca-q8"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of completion or cessation is recorded"
            }
          ]
        },
        {
          "id": "ca-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 30
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "A claimant other than a direct contractor may not enforce a lien unless it records the claim of lien after it ceases to provide work and before the earlier of the two times the statute sets.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q9",
            "ca-q8"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of completion or cessation is recorded"
            }
          ]
        },
        {
          "id": "ca-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If no action is commenced within that time, the claim of lien expires and is unenforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ca-q10"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Completion of the work of improvement includes cessation of labor for a continuous period of 60 days, and the recording of a notice of cessation after labor has ceased for a continuous period of 30 days.",
          "quoteIds": [
            "ca-q11"
          ]
        },
        {
          "text": "An owner may record a notice of completion on or within 15 days after the date of completion.",
          "quoteIds": [
            "ca-q12"
          ]
        },
        {
          "text": "An owner that records a notice of completion or cessation must give a copy within 10 days to the direct contractor and to each claimant that gave the owner preliminary notice. Without that copy, the notice does not shorten that person's time to record a claim of lien. The copy duty does not apply to some owners, including one that occupies the property as a personal residence in a dwelling of four or fewer units.",
          "quoteIds": [
            "ca-q13",
            "ca-q8",
            "ca-q14"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ca-q15",
            "ca-q16"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ca-q17",
            "ca-q18"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr. Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Third Monday in February",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Farmworkers Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 3,
            "day": 31,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Last Monday in May",
            "quoteId": "ca-q19",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "July 4",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "First Monday in September",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Native American Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 5,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ca-q19",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": "CCP § 135 says the Thursday of November declared by the President; modeled as the fourth Thursday."
          },
          {
            "name": "Day after Thanksgiving",
            "quoteId": "ca-q20",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": false,
            "modelNote": "Follows the Thanksgiving model."
          },
          {
            "name": "December 25",
            "quoteId": "ca-q19",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ca-q19",
          "ca-q20"
        ],
        "closure": {
          "clause": "on which a city, county, state, or public office, other than a branch office, is closed for the whole of the day",
          "place": "the office",
          "quoteIds": [
            "ca-q17",
            "ca-q21"
          ]
        }
      },
      "eventWording": [
        {
          "event": "notice-of-completion",
          "clause": "a notice of completion or cessation is recorded",
          "input": "Notice of completion or cessation recorded on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "ca-0",
        "ca-1",
        "ca-2",
        "ca-3",
        "ca-4",
        "ca-5",
        "ca-6",
        "ca-7",
        "ca-8",
        "ca-9",
        "ca-10",
        "ca-11",
        "ca-12",
        "ca-13"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "CO",
      "name": "Colorado",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "C.R.S. §§ 38-22-101 to 38-22-133",
      "statuteUrl": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
      "summary": "Colorado gives lien claimants four months after the day on which the last labor is performed or the last laborers or materials are furnished by the claimant to file the lien statement for record, and two months after completion of the building, structure, or other improvement for labor by the day or piece without furnishing laborers or materials, after serving a notice of intent at least ten days before filing. The lien does not hold the property longer than six months after the last work or labor is performed, or laborers or materials are furnished, or after completion, unless an action to enforce it is commenced and a notice of the action is filed for record within that time.",
      "effectiveOrAmended": "Sections 38-22-109 and 38-22-110 were last amended by L. 2000, pp. 209 and 210, effective August 2, 2000. The text is the Colorado Revised Statutes 2024.",
      "quotes": [
        {
          "id": "co-q1",
          "text": "In order to preserve any lien for work performed or laborers or materials furnished, there must be a notice of intent to file a lien statement served upon the owner or reputed owner of the property or the owner's agent and the principal or prime contractor or his or her agent at least ten days before the time of filing the lien statement with the county clerk and recorder.",
          "citation": "C.R.S. § 38-22-109(3)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q2",
          "text": "Such notice of intent shall be served by personal service or by registered or certified mail, return receipt requested, addressed to the last-known address of such persons, and an affidavit of such service or mailing at least ten days before filing of the lien statement with the county clerk and recorder shall be filed for record with said statement and shall constitute proof of such service.",
          "citation": "C.R.S. § 38-22-109(3)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q3",
          "text": "(5) Except as provided in subsections (10) and (11) of this section, the lien statements of all other lien claimants must be filed for record at any time before the expiration of four months after the day on which the last labor is performed or the last laborers or materials are furnished by such lien claimant.",
          "citation": "C.R.S. § 38-22-109(5)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q4",
          "text": "All such lien statements claimed for labor and work by the day or piece, but without furnishing laborers or materials therefor, must be filed for record after the last labor for which the lien claimed has been performed and at any time before the expiration of two months next after the completion of the building, structure, or other improvement.",
          "citation": "C.R.S. § 38-22-109(4)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q5",
          "text": "(10) Within the applicable time period provided in subsections (4) and (5) of this section and subject to the provisions of section 38-22-125, any lien claimant granted a lien pursuant to section 38-22-101 may file with the county clerk and recorder of the county in which the real property is situated a notice stating the legal description or address or such other description as will identify the real property; the name of the person with whom he has contracted; and the claimant's name, address, and telephone number.",
          "citation": "C.R.S. § 38-22-109(10)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q6",
          "text": "The filing of said notice shall serve as notice that said person may thereafter file a lien statement and shall extend the time for filing of the mechanic's lien statement to four months after completion of the structure or other improvement or six months after the date of filing of said notice, whichever occurs first.",
          "citation": "C.R.S. § 38-22-109(10)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q7",
          "text": "No lien claimed by virtue of this article, as against the owner of the property or as against one primarily liable for the debt upon",
          "citation": "C.R.S. § 38-22-110",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q8",
          "text": "which the lien is based or as against anyone who is neither the owner of the property nor one primarily liable for such debt, shall hold the property longer than six months after the last work or labor is performed, or laborers or materials are furnished, or after the completion of the building, structure, or other improvement, or the completion of the alteration, addition to, or repair thereof, as prescribed in section 38-22-109, unless an action has been commenced within that time to enforce the same, and unless also a notice stating that such action has been commenced is filed for record within that time in the office of the county clerk and recorder of the county in which said property is situate.",
          "citation": "C.R.S. § 38-22-110",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q9",
          "text": "For the purposes of this section, abandonment of all labor, work, services, and furnishing of laborers or materials under any unfinished contract or upon any unfinished building, improvement, or structure, or the alteration, addition to, or repair thereof, shall be deemed equivalent to a completion thereof.",
          "citation": "C.R.S. § 38-22-109(7)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        },
        {
          "id": "co-q10",
          "text": "For the purposes of this section, \"abandonment\" means discontinuance of all labor, work, services, and furnishing of laborers or materials for a three-month period.",
          "citation": "C.R.S. § 38-22-109(7)",
          "url": "https://web.archive.org/web/20260926092447id_/https://content.leg.colorado.gov/sites/default/files/images/olls/crs2024-title-38.pdf",
          "sourceId": "co-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-26"
        }
      ],
      "rules": [
        {
          "id": "co-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "co-q1"
          ]
        },
        {
          "id": "co-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At least ten days before the time of filing the lien statement with the county clerk and recorder"
          },
          "consequence": "The notice is required in order to preserve any lien for work performed or laborers or materials furnished.",
          "recipients": [
            "The owner or reputed owner of the property or the owner's agent",
            "The principal or prime contractor or his or her agent"
          ],
          "delivery": "By personal service or by registered or certified mail, return receipt requested, addressed to the last-known address; an affidavit of the service or mailing is filed for record with the lien statement.",
          "quoteIds": [
            "co-q1",
            "co-q2"
          ]
        },
        {
          "id": "co-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "co-q3"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the day on which the last labor is performed or the last laborers or materials are furnished by the lien claimant"
            }
          ]
        },
        {
          "id": "co-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For labor and work by the day or piece, without furnishing laborers or materials",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "co-q4"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the completion of the building, structure, or other improvement"
            }
          ]
        },
        {
          "id": "co-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where the claimant files a notice under subsection (10) within the time in subsections (4) and (5)",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Four months after completion of the structure or other improvement or six months after the date of filing of the notice, whichever occurs first"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "co-q5",
            "co-q6"
          ]
        },
        {
          "id": "co-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Six months after the last work or labor is performed, or laborers or materials are furnished, or after the completion of the building, structure, or other improvement, or the completion of the alteration, addition to, or repair thereof, as section 38-22-109 prescribes"
          },
          "consequence": "The lien does not hold the property longer than that unless an action to enforce it has been commenced, and a notice that the action has been commenced is filed for record, within that time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "co-q7",
            "co-q8"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "For these time limits, abandonment of all labor, work, services, and furnishing of laborers or materials on an unfinished contract or improvement counts as completion, and abandonment means their discontinuance for a three-month period.",
          "quoteIds": [
            "co-q9",
            "co-q10"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the day on which the last labor is performed or the last laborers or materials are furnished by the lien claimant",
          "input": "Last labor performed, or last laborers or materials furnished, on",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "the completion of the building, structure, or other improvement",
          "input": "Building, structure, or other improvement completed on",
          "hint": "Abandonment, meaning discontinuance of all labor and furnishing for a three-month period, counts as completion."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "co-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "CT",
      "name": "Connecticut",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Conn. Gen. Stat. §§ 49-33 to 49-40a",
      "statuteUrl": "https://www.cga.ct.gov/current/pub/chap_847.htm",
      "summary": "Connecticut gives a person performing services or furnishing materials 90 days after ceasing to do so to lodge a certificate of lien with the town clerk and 30 days after lodging it to serve a copy on the owner; a person other than the original contractor, except a subcontractor whose written contract is assented to in writing by the other party to the original contract, also gives written notice of intent to claim a lien within 90 days after ceasing. The lien does not continue in force beyond one year unless a foreclosure action is commenced and a notice of lis pendens is recorded within one year from the date the lien was recorded or within 60 days of a final disposition of an application under section 49-35a, whichever is later.",
      "effectiveOrAmended": "Sections 49-34 and 49-35 were last amended by P.A. 03-224, effective July 2, 2003, and section 49-39 by P.A. 16-194. The 2026 Supplement, revised to January 1, 2026, amends none of these sections.",
      "quotes": [
        {
          "id": "ct-q1",
          "text": "No person other than the original contractor for the construction, raising, removal or repairing of the building, or the development of any lot, or the site development or subdivision of any plot of land or a subcontractor whose contract with the original contractor is in writing and has been assented to in writing by the other party to the original contract, is entitled to claim any such mechanic's lien, unless, after commencing, and not later than ninety days after ceasing, to furnish materials or render services for such construction, raising, removal or repairing, such person gives written notice to the owner of the building, lot or plot of land and to the original contractor that he or she has furnished or commenced to furnish materials, or rendered or commenced to render services, and intends to claim a lien therefor on the building, lot or plot of land;",
          "citation": "Conn. Gen. Stat. § 49-35(a)",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q2",
          "text": "provided an original contractor shall not be entitled to such notice, unless, not later than fifteen days after commencing the construction, raising, removal or repairing of the building, or the development of any lot, or the site development or subdivision of any plot of land, such original contractor lodges with the town clerk of the town in which the building, lot or plot of land is situated an affidavit in writing, which shall be recorded by the town clerk with deeds of land, (1) stating the name under which such original contractor conducts business, (2) stating the original contractor's business address, and (3) describing the building, lot or plot of land.",
          "citation": "Conn. Gen. Stat. § 49-35(a)",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q3",
          "text": "The notice shall be served upon the owner or original contractor, if such owner or original contractor resides in the same town in which the building is being erected, raised, removed or repaired or the lot is being improved, or the plot of land is being improved or subdivided, by any indifferent person, state marshal or other proper officer, by leaving with such owner or original contractor or at such owner's or the original contractor's usual place of abode a true and attested copy thereof.",
          "citation": "Conn. Gen. Stat. § 49-35(a)",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q4",
          "text": "If the owner or original contractor does not reside in such town, but has a known agent therein, the notice may be so served upon the agent, otherwise it may be served by any indifferent person, state marshal or other proper officer, by mailing a true and attested copy of the notice by registered or certified mail to the owner or original contractor at the place where such owner or the original contractor resides.",
          "citation": "Conn. Gen. Stat. § 49-35(a)",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q5",
          "text": "If such copy is returned unclaimed, notice to such owner or original contractor shall be given by publication in accordance with the provisions of section 1-2.",
          "citation": "Conn. Gen. Stat. § 49-35(a)",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q6",
          "text": "A mechanic's lien is not valid unless the person performing the services or furnishing the materials (1) within ninety days after he has ceased to do so, lodges with the town clerk of the town in which the building, lot or plot of land is situated a certificate in writing, which shall be recorded by the town clerk with deeds of land, (A) describing the premises, the amount claimed as a lien thereon, the name or names of the person against whom the lien is being filed and the date of the commencement of the performance of services or furnishing of materials, (B) stating that the amount claimed is justly due, as nearly as the same can be ascertained, and (C) subscribed and sworn to by the claimant, and (2) not later than thirty days after lodging the certificate, serves a true and attested copy of the certificate upon the owner of the building, lot or plot of land in the same manner as is provided for the service of the notice in section 49-35.",
          "citation": "Conn. Gen. Stat. § 49-34",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q7",
          "text": "A mechanic's lien shall not continue in force for a longer period than one year after the lien has been perfected, unless the party claiming the lien commences an action to foreclose it, by complaint, cross-complaint or counterclaim, and records a notice of lis pendens in evidence thereof on the land records of the town in which the lien is recorded within one year from the date the lien was recorded or within sixty days of any final disposition of an application made pursuant to section 49-35a, including any appeal taken with respect thereto in accordance with section 49-35c, whichever is later.",
          "citation": "Conn. Gen. Stat. § 49-39",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q8",
          "text": "Each such lien, after the expiration of the one-year period or sixty-day period, as the case may be, without action commenced and notice thereof filed as aforesaid, shall be invalid and discharged as a matter of law.",
          "citation": "Conn. Gen. Stat. § 49-39",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ct-q9",
          "text": "With respect to any such lien which was validated in accordance with the provisions of section 49-37a, the one-year period or sixty-day period, as the case may be, shall toll from the date of the validation.",
          "citation": "Conn. Gen. Stat. § 49-39",
          "url": "https://www.cga.ct.gov/current/pub/chap_847.htm",
          "sourceId": "ct-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ct-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Except for a subcontractor whose contract with the original contractor is in writing and has been assented to in writing by the other party to the original contract",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Unless the notice is given within this time, the statute allows no such person to claim the mechanic's lien.",
          "recipients": [
            "The owner of the building, lot or plot of land",
            "The original contractor, where the original contractor lodged the affidavit with the town clerk not later than fifteen days after commencing"
          ],
          "delivery": "Served by an indifferent person, state marshal or other proper officer, by leaving a true and attested copy with the owner or original contractor, or at the usual place of abode, if that person resides in the town; otherwise on a known agent in the town, or by registered or certified mail; by publication if the mailed copy is returned unclaimed.",
          "quoteIds": [
            "ct-q1",
            "ct-q2",
            "ct-q3",
            "ct-q4",
            "ct-q5"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person ceases to furnish materials or render services"
            }
          ]
        },
        {
          "id": "ct-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ct-q1"
          ]
        },
        {
          "id": "ct-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "A mechanic's lien is not valid unless the certificate is lodged within this time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ct-q6"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person performing the services or furnishing the materials has ceased to do so"
            }
          ]
        },
        {
          "id": "ct-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "A mechanic's lien is not valid unless the copy is served within this time.",
          "recipients": [
            "The owner of the building, lot or plot of land"
          ],
          "delivery": "A true and attested copy of the certificate, served in the same manner as the section 49-35 notice.",
          "quoteIds": [
            "ct-q6"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the certificate of lien is lodged with the town clerk"
            }
          ]
        },
        {
          "id": "ct-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "After the one-year or sixty-day period, without an action commenced and the notice of lis pendens recorded, the lien is invalid and discharged as a matter of law.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ct-q7",
            "ct-q8",
            "ct-q9"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is recorded"
            }
          ],
          "mayChangeIf": "an application made pursuant to section 49-35a reaches final disposition, or the lien is validated under section 49-37a"
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the person performing the services or furnishing the materials has ceased to do so",
          "input": "Ceased performing services or furnishing materials on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the certificate of lien is lodged with the town clerk",
          "input": "Certificate of lien lodged with the town clerk on",
          "hint": "Leave empty if no certificate has been lodged. The town clerk records the certificate; the deadline to sue counts from the date the lien was recorded."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ct-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "DC",
      "name": "District of Columbia",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "D.C. Code §§ 40-301.01 to 40-303.20",
      "statuteUrl": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
      "summary": "In the District of Columbia a contractor, and a subcontractor, materialman or laborer directly employed by the original contractor, records a notice of intent during the construction or within 90 days after the earlier of the completion or termination of the project, and files suit to enforce the lien within 180 days after the notice of intent is recorded. A copy of the recorded notice goes to the owner by certified mail within 5 business days after its recordation.",
      "effectiveOrAmended": "Section 40-301.02 was last amended by D.C. Law 23-269 (April 5, 2021); section 40-303.13 by D.C. Law 16-31 (October 20, 2005).",
      "quotes": [
        {
          "id": "dc-q1",
          "text": "(a)(1) A contractor desiring to enforce the lien shall record in the land records a notice of intent that identifies the property subject to the lien and states the amount due or to become due to the contractor.",
          "citation": "D.C. Code § 40-301.02(a)(1)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
          "sourceId": "dc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q2",
          "text": "Any person directly employed by a contractor described by § 40-301.01 (any such contractor also referred to herein as original contractor), whether the person is a subcontractor, materialman, or laborer, to furnish work or materials for the completion of the project, shall be entitled to the same rights and subject to the same obligations as the original contractor under this chapter, subject to the conditions and limitations set forth in this chapter.",
          "citation": "D.C. Code § 40-303.01",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.01",
          "sourceId": "dc-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q3",
          "text": "(b) If the owner, in good faith, has paid the original contractor in full for the project of the original contract (and the amount of the payment is not disputed by the original contractor), the parties employed by the original contractor shall not be entitled to a lien on the owner’s real property to recover any amounts due and owing for their work or materials provided for the erection, construction, improvement, repair of, or addition to the real property; provided, that if a subcontractor, materialman, or supplier notifies the owner in writing of amounts due to the subcontractor, materialman, or supplier (“notice amount”) while the owner has a balance due and owing or to become due and owing to the original contractor that is not less than the notice amount, the notice of the notice amount shall be prima facie evidence that any payment thereafter by the owner to the original contractor was not made in good faith.",
          "citation": "D.C. Code § 40-303.02(b)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.02",
          "sourceId": "dc-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q4",
          "text": "The notice of intent shall be recorded during the construction or within 90 days after the earlier of the completion or termination of the project.",
          "citation": "D.C. Code § 40-301.02(a)(1)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
          "sourceId": "dc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q5",
          "text": "If the notice of intent is not recorded in the land records during the construction or within 90 days after the earlier of the completion or termination of the project, the contractor’s lien shall terminate upon the expiration of the 90-day period.",
          "citation": "D.C. Code § 40-301.02(a)(1)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
          "sourceId": "dc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q6",
          "text": "(2) Any contractor who records timely a notice of intent in accordance with subsection (a)(1) of this section, shall send to the owner, by certified mail to the current address (or if not available in the local public records, the last known address) of the owner, a copy of the notice of intent within 5 business days after the date of its recordation in the land records.",
          "citation": "D.C. Code § 40-301.02(a)(2)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
          "sourceId": "dc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q7",
          "text": "If the certified mail is returned to the contractor unclaimed or undelivered, the contractor shall post a copy of the recorded notice of intent at or on the affected real property in a location generally visible from some entry point to the real property.",
          "citation": "D.C. Code § 40-301.02(a)(2)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-301.02",
          "sourceId": "dc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q8",
          "text": "The said subcontractor or other person employed by the contractor as aforesaid, besides filing a notice with the Recorder of Deeds of the District of Columbia as aforesaid, shall serve the same upon the owner of the property upon which the lien is claimed, by leaving a copy thereof with said owner or his agent, if said owner or agent be a resident of the District, or if neither can be found, by posting the same on the premises; and on his failure to do so, or until he shall do so, the said owner may make payments to his contractor according to the terms of his contract, and to the extent of such payments the lien of the principal contractor shall be discharged and the amount for which the property shall be chargeable in favor of the parties so employed by him reduced.",
          "citation": "D.C. Code § 40-303.03",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.03",
          "sourceId": "dc-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q9",
          "text": "(a)(1) Any person with a lien and who has recorded a valid notice of intent shall only enforce the lien by: (A) Filing suit under § 40-303.08 to enforce the lien at anytime within 180 days after the date that the notice of intent is recorded in the land records; and (B) Recording, within 10 days of filing suit, a notice of pendency of action in accordance with § 42-1207(b) in the land records.",
          "citation": "D.C. Code § 40-303.13(a)(1)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.13",
          "sourceId": "dc-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "dc-q10",
          "text": "(2) Failure to file suit within the 180-day period or to file timely a notice of pendency of action shall terminate the lien.",
          "citation": "D.C. Code § 40-303.13(a)(2)",
          "url": "https://code.dccouncil.gov/us/dc/council/code/sections/40-303.13",
          "sourceId": "dc-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "dc-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "dc-q1",
            "dc-q2",
            "dc-q3"
          ]
        },
        {
          "id": "dc-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "During the construction or within 90 days after the earlier of the completion or termination of the project"
          },
          "consequence": "If the notice of intent is not recorded within that time, the contractor's lien terminates when the 90-day period ends.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "dc-q1",
            "dc-q4",
            "dc-q5"
          ]
        },
        {
          "id": "dc-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a subcontractor, materialman or laborer directly employed by the original contractor",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "During the construction or within 90 days after the earlier of the completion or termination of the project"
          },
          "consequence": "If the notice of intent is not recorded within that time, the lien terminates when the 90-day period ends.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "dc-q1",
            "dc-q4",
            "dc-q5",
            "dc-q2"
          ]
        },
        {
          "id": "dc-service-0",
          "stage": "service",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within 5 business days after the notice of intent is recorded in the land records"
          },
          "consequence": null,
          "recipients": [
            "The owner, at the owner's current address, or the last known address if the current one is not available in the local public records"
          ],
          "delivery": "By certified mail. If the certified mail is returned unclaimed or undelivered, a copy of the recorded notice of intent is posted at or on the property in a location generally visible from some entry point to the property.",
          "quoteIds": [
            "dc-q6",
            "dc-q7"
          ]
        },
        {
          "id": "dc-service-1",
          "stage": "service",
          "roles": [
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a subcontractor, materialman or laborer directly employed by the original contractor",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within 5 business days after the notice of intent is recorded in the land records"
          },
          "consequence": null,
          "recipients": [
            "The owner, at the owner's current address, or the last known address if the current one is not available in the local public records"
          ],
          "delivery": "By certified mail. If the certified mail is returned unclaimed or undelivered, a copy of the recorded notice of intent is posted at or on the property in a location generally visible from some entry point to the property.",
          "quoteIds": [
            "dc-q6",
            "dc-q7",
            "dc-q2"
          ]
        },
        {
          "id": "dc-service-2",
          "stage": "service",
          "roles": [
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a subcontractor or other person employed by the contractor",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Served on the owner, with no period stated; until it is served, the owner may pay the contractor under the contract"
          },
          "consequence": "Until the notice is served, the owner may make payments to the contractor under the contract, and the amount the property is chargeable for in favor of the persons employed by the contractor is reduced to the extent of those payments.",
          "recipients": [
            "The owner of the property, or the owner's agent, if a resident of the District"
          ],
          "delivery": "By leaving a copy with the owner or the agent or, if neither can be found, by posting it on the premises.",
          "quoteIds": [
            "dc-q8"
          ]
        },
        {
          "id": "dc-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": "Failure to file suit within the 180-day period, or to record the notice of pendency of action within 10 days of filing suit, terminates the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "dc-q9",
            "dc-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of intent is recorded"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the notice of intent is recorded",
          "input": "Notice of intent recorded on",
          "hint": "Leave empty if no notice of intent has been recorded."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "dc-0",
        "dc-1",
        "dc-2",
        "dc-3",
        "dc-4"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "DE",
      "name": "Delaware",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "25 Del. C. §§ 2701 to 2737",
      "statuteUrl": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
      "summary": "Delaware gives a contractor that contracted directly with the owner and furnished both labor and material, or construction management services in connection with them, 180 days after the structure is completed to file a statement of claim, and every other claimant 120 days after it completes its labor or last delivers materials; each is also timely within that period after certain other dates the statute lists. Under subchapter II, the statement of claim is filed in the Superior Court and may also serve as the complaint.",
      "effectiveOrAmended": "Sections 2707, 2711, 2712, 2732 and 2735 of Title 25 were last amended by 84 Del. Laws, c. 42.",
      "quotes": [
        {
          "id": "de-q1",
          "text": "(a) Every person entitled to the benefits conferred by this chapter and desiring to avail said person’s own self of the lien provided for in this chapter, shall, within the time specified in this chapter, file a statement of claim, which may also serve as a complaint when so denominated, in the office of the Prothonotary of the Superior Court in and for the county wherein such structure is situated.",
          "citation": "25 Del. C. § 2712(a)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q2",
          "text": "(a) (1) A contractor who: a. Has made that contractor’s contract directly with the owner or reputed owner of any structure; and b. Has furnished both labor and material in and for such structure, or has provided construction management services in connection with the furnishing of such labor and material, in order to avail contractor’s own self of the benefits of this subchapter, shall file that contractor’s statement of claim within 180 days after the completion of such structure.",
          "citation": "25 Del. C. § 2711(a)(1)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q3",
          "text": "(2) For purposes of this subsection, and without limitation, a statement of claim shall be deemed timely if it is filed within 180 days of any of the following: a. The date of purported completion of all the work called for by the contract as provided by the contract if such date has been agreed to in the contract itself; b. The date when the statute of limitations commences to run in relation to the particular phase or segment of work performed pursuant to the contract, to which phase or segment of work the statement of claim relates, where such date for such phase or segment has been specifically provided for in the contract itself; c. The date when the statute of limitations commences to run in relation to the contract itself where such date has been specifically provided for in the contract itself; d. The date when payment of 90% of the contract price, including the value of any work done pursuant to contract modifications or change orders, has been received by the contractor;",
          "citation": "25 Del. C. § 2711(a)(2)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q4",
          "text": "e. The date when the contractor submits that contractor’s own final invoice to the owner or reputed owner of such structure; f. With respect to a structure for which a certificate of occupancy must be issued, the date when such certificate is issued; g. The date when the structure has been accepted, as provided in the contract, by the owner or reputed owner; h. The date when the engineer or architect retained by the owner or reputed owner, or such other representative designated by the owner or reputed owner for this purpose, issues a certificate of completion; or i. The date when permanent financing for the structure is completed.",
          "citation": "25 Del. C. § 2711(a)(2)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q5",
          "text": "(b) All other persons embraced within this chapter and entitled to avail themselves of the liens herein provided shall file a statement of their respective claims within 120 days from the date from the completion of the labor performed or from the last delivery of materials furnished by them respectively.",
          "citation": "25 Del. C. § 2711(b)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q6",
          "text": "For purposes of this subsection, and without limitation, a statement of claim on behalf of such person shall be deemed timely if it is filed within 120 days of either of the following: (1) The date final payment, including all retainage, is due to such person; or (2) The date final payment is made to the contractor: a. Who has contracted directly with the owner or reputed owner of any structure for the erection, alteration or repair of same; and b. With whom such person has a contract, express or implied, for the furnishing of labor or materials, or both, in connection with such erection, alteration or repair.",
          "citation": "25 Del. C. § 2711(b)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q7",
          "text": "Any person having performed any labor to any amount less than $100 in or for the erection, alteration or repair of any structure or bridge, in pursuance of any contract, expressed or implied, with the owner or reputed owner of such structure or bridge or with any contractor who has contracted for the erection, alteration or repair of any structure or bridge, or any part thereof, may obtain a lien upon such structure or bridge and upon the ground upon which the same may be situated or erected in the manner provided in this subchapter.",
          "citation": "25 Del. C. § 2731",
          "url": "https://delcode.delaware.gov/title25/c027/sc03/index.html",
          "sourceId": "de-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q8",
          "text": "No person having done or performed any labor in or about the erection, alteration or repair of any structure or bridge shall be allowed to file any statement of that person’s claim before a justice of the peace until after the expiration of 20 days from the time of the last labor done or performed by that person, but, in order to avail said person’s own self of the benefits of this subchapter, the person shall file that person’s claim within 10 days after the expiration of the 20 days aforesaid.",
          "citation": "25 Del. C. § 2732",
          "url": "https://delcode.delaware.gov/title25/c027/sc03/index.html",
          "sourceId": "de-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q9",
          "text": "(a) The proceedings to recover the amount of any claim shall be by writ of scire facias.",
          "citation": "25 Del. C. § 2714(a)",
          "url": "https://delcode.delaware.gov/title25/c027/sc02/index.html",
          "sourceId": "de-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q10",
          "text": "The transcript and judgment may be entered in the Superior Court of the county in which the structure is situated and, when so entered, if within 2 days from the date of the judgment, shall become a lien on such structure or bridge and upon the ground upon which the same is erected and shall relate back to the day when the labor was commenced and shall take priority accordingly.",
          "citation": "25 Del. C. § 2735",
          "url": "https://delcode.delaware.gov/title25/c027/sc03/index.html",
          "sourceId": "de-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q11",
          "text": "No lien shall be obtained under this chapter upon the lands, structure, or both, of any owner which is used solely as a residence of said owner when the owner has made either full or final payment to the contractor, in good faith, with whom the owner contracted for the construction, erection, building, improvement, alteration or repair thereof.",
          "citation": "25 Del. C. § 2707",
          "url": "https://delcode.delaware.gov/title25/c027/sc01/index.html",
          "sourceId": "de-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "de-q12",
          "text": "If the owner has not made full payment in good faith to such contractor, the lien may be obtained in accordance with this chapter, but it shall be a lien only to the extent of the balance of the payment due such contractor, which balance or portion shall be payable pro rata among the claimants who perfect liens.",
          "citation": "25 Del. C. § 2707",
          "url": "https://delcode.delaware.gov/title25/c027/sc01/index.html",
          "sourceId": "de-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "de-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q1"
          ]
        },
        {
          "id": "de-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a contractor that made its contract directly with the owner or reputed owner and furnished both labor and material for the structure, or provided construction management services in connection with them",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q2",
            "de-q3",
            "de-q4"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the structure is completed"
            }
          ],
          "mayChangeIf": "one of the dates listed in 25 Del. C. § 2711(a)(2) falls after completion"
        },
        {
          "id": "de-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For all other persons, apart from the contractor described in 25 Del. C. § 2711(a)",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q5",
            "de-q6"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant's labor was completed or its last materials were delivered"
            }
          ],
          "mayChangeIf": "final payment, including all retainage, falls due to the claimant, or final payment is made to the contractor with whom the claimant contracted, on a later date"
        },
        {
          "id": "de-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For labor of less than $100, where the claim is filed with a justice of the peace under subchapter III",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Only after 20 days from the claimant's last labor have expired, and within 10 days after that"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q7",
            "de-q8"
          ]
        },
        {
          "id": "de-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "The statement of claim, filed within the time set for it, may also serve as the complaint. The proceedings to recover the amount of the claim are by writ of scire facias"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q1",
            "de-q9"
          ]
        },
        {
          "id": "de-enforcement-2",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a claim for labor of less than $100 filed with a justice of the peace under subchapter III",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The transcript and judgment become a lien on the structure when entered in the Superior Court within 2 days from the date of the judgment"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "de-q10"
          ]
        }
      ],
      "residential": [
        {
          "text": "No lien may be obtained on the land or structure of an owner, used solely as the owner's residence, when the owner has made full or final payment in good faith to the contractor with whom the owner contracted. If the owner has not paid that contractor in full in good faith, the lien reaches only the balance of the payment due, shared pro rata among the claimants who perfect liens.",
          "quoteIds": [
            "de-q11",
            "de-q12"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": null,
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "de-0",
        "de-1",
        "de-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "FL",
      "name": "Florida",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Fla. Stat. ch. 713, part I",
      "statuteUrl": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
      "summary": "Florida sets 90 days after a lienor's final furnishing to record a claim of lien and one year after recording to start an action, with shorter periods after a termination of the original contract or an owner's notice of contest of lien. Lienors not in privity with the owner, other than laborers, serve a notice to owner not later than 45 days after they begin to furnish, and in any event before the owner disburses the final payment.",
      "effectiveOrAmended": "The 2025 Florida Statutes. Section 713.06 was last amended by ch. 2003-177, sections 713.08 and 713.015 by ch. 2007-221, and sections 713.13, 713.18, 713.21 and 713.22 by ch. 2023-226.",
      "quotes": [
        {
          "id": "fl-q1",
          "text": "The notice must be served before commencing, or not later than 45 days after commencing, to furnish his or her labor, services, or materials, but, in any event, before the date of the owner’s disbursement of the final payment after the contractor has furnished the affidavit under subparagraph (3)(d)1.",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q2",
          "text": "the failure to serve the notice, or to timely serve it, is a complete defense to enforcement of a lien by any person.",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q3",
          "text": "All lienors under this section, except laborers, as a prerequisite to perfecting a lien under this chapter and recording a claim of lien, must serve a notice on the owner",
          "citation": "Fla. Stat. § 713.06(2)(a)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q4",
          "text": "The claim of lien may be recorded at any time during the progress of the work or thereafter but not later than 90 days after the final furnishing of the labor or services or materials by the lienor.",
          "citation": "Fla. Stat. § 713.08(5)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q5",
          "text": "However, if the original contract is terminated under s. 713.07(4), a claim for a lien attaching prior to such termination may not be recorded after 90 days following the date of such termination or 90 days after the final furnishing of labor, services, or materials by the lienor, whichever occurs first.",
          "citation": "Fla. Stat. § 713.08(5)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q6",
          "text": "Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial to any person entitled to rely on the service.",
          "citation": "Fla. Stat. § 713.08(4)(c)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q7",
          "text": "A lien provided by this part does not continue for a longer period than 1 year after the claim of lien has been recorded or 1 year after the recording of an amended claim of lien that shows a later date of final furnishing of labor, services, or materials, unless within that time an action to enforce the lien is commenced in a court of competent jurisdiction.",
          "citation": "Fla. Stat. § 713.22(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q8",
          "text": "The lien of any lienor upon whom such notice is served and who fails to institute a suit to enforce his or her lien within 60 days after service of such notice is extinguished automatically.",
          "citation": "Fla. Stat. § 713.22(2)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q9",
          "text": "Any direct contract greater than $2,500 between an owner and a contractor, related to improvements to real property consisting of single or multiple family dwellings up to and including four units, must contain the following notice provision printed in no less than 12-point, capitalized, boldfaced type",
          "citation": "Fla. Stat. § 713.015(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q10",
          "text": "If the improvement described in the notice of commencement is not actually commenced within 90 days after the recording thereof, such notice is void and of no further effect.",
          "citation": "Fla. Stat. § 713.13(2)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q11",
          "text": "In computing any time period under this part, if the last day of the time period is a Saturday, Sunday, or holiday specified in s. 110.117(1), or any day observed as a holiday by the clerk’s office or designated as a holiday by the chief judge of the circuit, the time period is extended to the end of the next business day.",
          "citation": "Fla. Stat. § 713.011(1)",
          "url": "https://web.archive.org/web/20260517183304id_/https://leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0700-0799/0713/0713.html",
          "sourceId": "fl-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "fl-q12",
          "text": "The following holidays shall be paid holidays observed by all state branches and agencies:",
          "citation": "Fla. Stat. § 110.117(1)",
          "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
          "sourceId": "fl-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "fl-q13",
          "text": "(a) New Year’s Day. (b) Birthday of Martin Luther King, Jr., third Monday in January. (c) Memorial Day. (d) Independence Day. (e) Labor Day. (f) Veterans’ Day, November 11. (g) Thanksgiving Day. (h) Friday after Thanksgiving. (i) Christmas Day.",
          "citation": "Fla. Stat. § 110.117(1)",
          "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
          "sourceId": "fl-1",
          "retrievedAt": "2026-10-03",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "fl-q14",
          "text": "If any of these holidays falls on Saturday, the preceding Friday shall be observed as a holiday. If any of these holidays falls on Sunday, the following Monday shall be observed as a holiday.",
          "citation": "Fla. Stat. § 110.117(1)",
          "url": "https://web.archive.org/web/20251118111452id_/https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0100-0199/0110/Sections/0110.117.html",
          "sourceId": "fl-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        }
      ],
      "rules": [
        {
          "id": "fl-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 45
            }
          },
          "notComputed": null,
          "consequence": "Failing to serve the notice, or to serve it on time, is a complete defense to enforcement of a lien by any person.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q1",
            "fl-q2",
            "fl-q3"
          ]
        },
        {
          "id": "fl-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "In every case, as an outer limit",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before the owner disburses the final payment after the contractor has furnished its final payment affidavit."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q1"
          ]
        },
        {
          "id": "fl-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q3"
          ]
        },
        {
          "id": "fl-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q4"
          ]
        },
        {
          "id": "fl-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If the original contract is terminated under section 713.07(4)",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The earlier of 90 days after the termination and 90 days after the lienor's final furnishing."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q5"
          ]
        },
        {
          "id": "fl-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "Failing to serve the claim of lien before recording or within 15 days after recording makes it voidable to the extent the failure or delay is shown to have been prejudicial to a person with a right to rely on the service.",
          "recipients": null,
          "delivery": "In the manner provided in section 713.18.",
          "quoteIds": [
            "fl-q6"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is recorded"
            }
          ]
        },
        {
          "id": "fl-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q7"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien, or an amended claim of lien that shows a later date of final furnishing of labor, services, or materials, is recorded"
            }
          ]
        },
        {
          "id": "fl-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After the owner serves a notice of contest of lien",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days after service of the owner's notice of contest of lien."
          },
          "consequence": "The lien of a lienor that does not sue within that time is extinguished automatically.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "fl-q8"
          ]
        }
      ],
      "residential": [
        {
          "text": "A direct contract greater than $2,500 between an owner and a contractor for improvements to a single or multiple family dwelling of up to four units must contain the statute's notice, printed in at least 12-point, capitalized, boldfaced type.",
          "quoteIds": [
            "fl-q9"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "If the improvement described in a notice of commencement is not actually commenced within 90 days after the notice is recorded, the notice is void and of no further effect.",
          "quoteIds": [
            "fl-q10"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": null,
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "fl-q11"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Birthday of Martin Luther King, Jr.",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "fl-q12",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": null
          },
          {
            "name": "Friday after Thanksgiving",
            "quoteId": "fl-q12",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": false,
            "modelNote": "The day after Thanksgiving Day, which is modeled as the fourth Thursday of November. It is the fifth Friday of November in a year whose November 1 is a Friday, such as 2030."
          },
          {
            "name": "Christmas Day",
            "quoteId": "fl-q12",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": false,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "fl-q12",
          "fl-q13",
          "fl-q14"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien is recorded",
          "input": "Claim of lien recorded on",
          "hint": "Leave empty if no claim of lien has been recorded. If an amended claim of lien that shows a later date of final furnishing was recorded, the date the amended claim was recorded. The 15-day service date and the deadline to sue then both count from that date."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "fl-0",
        "fl-1"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "GA",
      "name": "Georgia",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "O.C.G.A. §§ 44-14-360 to 44-14-368",
      "statuteUrl": "https://www.lexisnexis.com/hottopics/gacode/",
      "summary": "Georgia gives a claimant 90 days after the last labor, services or materials to file a claim of lien, two business days after filing to send the owner a copy, and 365 days after filing to commence a lien action. Where a notice of commencement is filed, a claimant without privity of contract with the contractor sends a notice to contractor within 30 days after the notice of commencement is filed or 30 days after the claimant's first delivery of labor, services or materials to the property, whichever is later.",
      "effectiveOrAmended": "Official Code of Georgia Annotated, current through the 2026 Special Session. Section 44-14-361.1 was last amended by Ga. L. 2021, p. 674 (HB 480); section 44-14-361.5 by Ga. L. 2014, p. 866 (SB 340); section 44-14-367 by Ga. L. 2008, p. 1063 (SB 374), which also enacted section 44-14-368.",
      "quotes": [
        {
          "id": "ga-q1",
          "text": "(a) To make good the liens specified in paragraphs (1), (2), and (6) through (9) of subsection (a) of Code Section 44-14-361, any person having a right to a lien who does not have privity of contract with the contractor and is providing labor, services, or materials for the improvement of property shall, within 30 days from the filing of the notice of commencement or 30 days following the first delivery of labor, services, or materials to the property, whichever is later, give a written notice to contractor as set out in subsection (c) of this Code section to the owner or the agent of the owner and to the contractor for a project on which there has been filed with the clerk of the superior court a notice of commencement setting forth therein the information required in subsection (b) of this Code section.",
          "citation": "O.C.G.A. § 44-14-361.5(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q2",
          "text": "(c) A notice to contractor shall be sent by registered or certified mail or statutory overnight delivery to the owner or the agent of the owner and to the contractor at the addresses set forth in the notice of commencement setting forth:",
          "citation": "O.C.G.A. § 44-14-361.5(c)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q3",
          "text": "(d) The failure to file a notice of commencement shall render the provisions of this Code section inapplicable.",
          "citation": "O.C.G.A. § 44-14-361.5(d)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q4",
          "text": "(10) “Subcontractor” means, but is not limited to, subcontractors having privity of contract with the contractor.",
          "citation": "O.C.G.A. § 44-14-360(10)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q5",
          "text": "(a) Prior to filing a claim of lien, a person having a lien under paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361 may at such person’s option file a preliminary notice of lien rights.",
          "citation": "O.C.G.A. § 44-14-361.3(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q6",
          "text": "(d) A person having a lien under paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361 may enforce the lien without filing a preliminary notice of lien.",
          "citation": "O.C.G.A. § 44-14-361.3(d)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q7",
          "text": "(1) “Contractor” means a contractor having privity of contract with the owner of the real estate.",
          "citation": "O.C.G.A. § 44-14-360(1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q8",
          "text": "(2) The filing for record of his or her claim of lien within 90 days after the completion of the work, the furnishing of the architectural services, or the furnishing or performing of such surveying, engineering services, or interior design services or within 90 days after the material or machinery is furnished in the office of the clerk of the superior court of the county where the property is located.",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q9",
          "text": "for satisfaction of a claim which became due on (specify the date the claim was due, which is the same as the last date the labor, services, or materials were supplied to the premises)",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q10",
          "text": "(a) To make good the liens specified in paragraphs (1) through (8) and (10) of subsection (a) of Code Section 44-14-361, they must be created and declared in accordance with the following provisions, and on failure of any of them the lien shall not be effective or enforceable:",
          "citation": "O.C.G.A. § 44-14-361.1(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q11",
          "text": "No later than two business days after the date the claim of lien is filed of record, the lien claimant shall send a true and accurate copy of the claim of lien by registered or certified mail or statutory overnight delivery to the owner of the property or, if the owner’s address cannot be found, the contractor, as the agent of the owner; provided, however, that if the property owner is an entity on file with the Secretary of State’s Corporations Division, sending a copy of the claim of lien to the entity’s address or the registered agent’s address shall satisfy this requirement. In all cases in which a notice of commencement is filed with the clerk of the superior court pursuant to subsection (b) of Code Section 44-14-361.5, a lien claimant shall also send a copy of the claim of lien by registered or certified mail or statutory overnight delivery to the contractor at the address shown on the notice of commencement;",
          "citation": "O.C.G.A. § 44-14-361.1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q12",
          "text": "(.1) “Business day” means any day that is not a Saturday, Sunday, or legal holiday.",
          "citation": "O.C.G.A. § 44-14-360(.1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q13",
          "text": "(3) The commencement of a lien action for the recovery of the amount of the party’s claim within 365 days from the date of filing for record of his or her claim of lien. In addition, within 30 days after commencing such lien action, the party claiming the lien shall file a notice with the clerk of the superior court of the county wherein the subject lien was filed.",
          "citation": "O.C.G.A. § 44-14-361.1(a)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q14",
          "text": "Failure of a lien claimant to commence a lien action to collect the amount of his or her claim within 365 days from the date of filing the lien, or failure of the lien claimant to file the statutory notice of commencement of lien action in the county where the property is located, renders the claim of lien unenforceable.",
          "citation": "O.C.G.A. § 44-14-367",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q15",
          "text": "(a) An owner or an owner’s agent or attorney, or the contractor or contractor’s agent or attorney, may elect to shorten the time prescribed in which to commence a lien action to enforce any claim of lien by recording in the superior court clerk’s office a notice in substantially the following form, in boldface capital letters in at least 12 point font, along with proof of delivery upon the lien claimant:",
          "citation": "O.C.G.A. § 44-14-368(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q16",
          "text": "THE TIME WITHIN WHICH YOU MAY COMMENCE A LIEN ACTION TO ENFORCE YOUR LIEN IS LIMITED TO 60 DAYS FROM RECEIPT OF THIS NOTICE.",
          "citation": "O.C.G.A. § 44-14-368(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q17",
          "text": "(b) Not later than 15 days after the contractor physically commences work on the property, a notice of commencement shall be filed by the owner, the agent of the owner, or by the contractor with the clerk of the superior court in the county in which the project is located.",
          "citation": "O.C.G.A. § 44-14-361.5(b)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q18",
          "text": "(3) Computation of time. Except as otherwise provided by time period computations specifically applying to other laws, when a period of time measured in days, weeks, months, years, or other measurements of time except hours is prescribed for the exercise of any privilege or the discharge of any duty, the first day shall not be counted but the last day shall be counted; and, if the last day falls on Saturday or Sunday, the party having such privilege or duty shall have through the following Monday to exercise the privilege or to discharge the duty.",
          "citation": "O.C.G.A. § 1-3-1(d)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q19",
          "text": "When the last day prescribed for such action falls on a public and legal holiday as set forth in Code Section 1-4-1, the party having the privilege or duty shall have through the next business day to exercise the privilege or to discharge the duty.",
          "citation": "O.C.G.A. § 1-3-1(d)(3)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q20",
          "text": "(a) The State of Georgia shall recognize and observe as public and legal holidays:",
          "citation": "O.C.G.A. § 1-4-1(a)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q21",
          "text": "(1) All days which have been designated as of January 1, 2022, as public and legal holidays by the federal government; and",
          "citation": "O.C.G.A. § 1-4-1(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ga-q22",
          "text": "(2) All other days designated and proclaimed by the Governor as public and legal holidays or as days of fasting and prayer or other religious observance.",
          "citation": "O.C.G.A. § 1-4-1(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/gacode/",
          "sourceId": "ga-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ga-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "Where a notice of commencement has been filed; for a claimant without privity of contract with the contractor",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "laterOf": [
                "first-furnishing",
                "notice-of-commencement"
              ]
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner or the owner's agent",
            "The contractor"
          ],
          "delivery": "Registered or certified mail or statutory overnight delivery, to the addresses in the notice of commencement.",
          "quoteIds": [
            "ga-q1",
            "ga-q2",
            "ga-q3",
            "ga-q4"
          ],
          "eventWording": [
            {
              "event": "notice-of-commencement",
              "clause": "a notice of commencement is filed"
            }
          ]
        },
        {
          "id": "ga-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q5",
            "ga-q6",
            "ga-q1",
            "ga-q7",
            "ga-q4"
          ]
        },
        {
          "id": "ga-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If the claim of lien is not filed for record within this time, the lien is not effective or enforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q8",
            "ga-q9",
            "ga-q10"
          ]
        },
        {
          "id": "ga-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "business-days",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner of the property or, if the owner's address cannot be located, the contractor as the owner's agent",
            "The contractor at the address in the notice of commencement, where one is filed"
          ],
          "delivery": "Registered or certified mail or statutory overnight delivery.",
          "quoteIds": [
            "ga-q11",
            "ga-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ]
        },
        {
          "id": "ga-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 365
            }
          },
          "notComputed": null,
          "consequence": "Failing to commence the lien action within 365 days after filing, or to file the notice of commencement of lien action, renders the claim of lien unenforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q13",
            "ga-q14"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ]
        },
        {
          "id": "ga-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After the owner or the contractor records a notice of contest of lien",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days from receipt of the notice of contest of lien."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ga-q15",
            "ga-q16"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "A notice of commencement is filed with the clerk of the superior court by the owner, the owner's agent or the contractor not later than 15 days after the contractor physically commences work on the property.",
          "quoteIds": [
            "ga-q17"
          ]
        },
        {
          "text": "If no notice of commencement is filed, the section requiring a notice to contractor does not apply.",
          "quoteIds": [
            "ga-q3"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ga-q18"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ga-q18",
            "ga-q19"
          ]
        },
        "businessDays": {
          "quoteIds": [
            "ga-q12"
          ]
        },
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ga-q20",
          "ga-q21",
          "ga-q22"
        ]
      },
      "eventWording": [
        {
          "event": "notice-of-commencement",
          "clause": "a notice of commencement is filed",
          "input": "Notice of commencement filed on",
          "hint": "Leave empty if none has been filed."
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is filed",
          "input": "Claim of lien filed on",
          "hint": "Leave empty if no claim of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "ga-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "HI",
      "name": "Hawaii",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Haw. Rev. Stat. ch. 507, pt. II",
      "statuteUrl": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
      "summary": "In Hawaii a lien claimant applies to the circuit court and files the Application and Notice not later than 45 days after the date of completion: the day a published notice of completion is complete and its affidavit of publication is filed, or one year after actual completion or abandonment if no valid notice is published and filed within that year. The lien attaches only when the court so orders, and it expires three months after the Order Directing Lien to Attach is entered unless proceedings to enforce it are commenced within that time.",
      "effectiveOrAmended": "Section 507-43 was last amended by L 2019, c 111, § 32.",
      "quotes": [
        {
          "id": "hi-q1",
          "text": "Any person or association of persons furnishing labor or material in the improvement of real property shall have a lien upon the improvement as well as upon the interest of the owner of the improvement in the real property upon which the same is situated, or for the benefit of which the same was constructed, for the price agreed to be paid (if the price does not exceed the value of the labor and materials), or if the price exceeds the value thereof or if no price is agreed upon by the contracting parties, for the fair and reasonable value of all labor and materials covered by their contract, express or implied.",
          "citation": "Haw. Rev. Stat. § 507-42",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0042.htm",
          "sourceId": "hi-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q2",
          "text": "Any person claiming a lien shall apply therefor to the circuit court of the circuit where the property is situated.",
          "citation": "Haw. Rev. Stat. § 507-43(a)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q3",
          "text": "The Application and Notice shall be filed not later than forty-five days after the date of completion of the improvement against which it is filed.",
          "citation": "Haw. Rev. Stat. § 507-43(b)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q4",
          "text": "The term \"date of completion\" as used in this section means the time when the owner or the general contractor for the improvement completes the publication of a notice that the improvement has been completed or has been abandoned and an affidavit of the publication, together with a copy of the notice has been filed in the office of the clerk of the circuit court where the property involved is situated; provided that notice of completion shall not be effective for any purpose unless prior to the notice there has been substantial completion of the improvement or the improvement has been actually abandoned; and provided further that the notice shall not be published by the contractor until after the contractor has first made written demand upon the owner to publish the notice and the owner has failed to publish the notice within five days from the date of the demand.",
          "citation": "Haw. Rev. Stat. § 507-43(f)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q5",
          "text": "If a valid notice of completion is not published and filed within one year after the actual completion or abandonment of the improvement the \"date of completion\" shall be deemed to be one year after actual completion or abandonment.",
          "citation": "Haw. Rev. Stat. § 507-43(g)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q6",
          "text": "Where title to the property involved, or any portion thereof, is registered in the land court and the lien is not claimed solely against the lessees' interest in one or more leasehold time share interests as described in section 501-20, it shall be incumbent upon the lienor to file a certified copy of the Order Directing Lien To Attach in the office of the assistant registrar of the land court within seven days after the entry thereof in order to preserve the lienor's rights against subsequent encumbrancers and purchasers of the property.",
          "citation": "Haw. Rev. Stat. § 507-43(b)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q7",
          "text": "The lien shall expire three months after the entry of the Order Directing Lien to Attach unless proceedings are commenced within that time to collect the amount due thereon by enforcing the same.",
          "citation": "Haw. Rev. Stat. § 507-43(e)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q8",
          "text": "The lien shall not attach to the property until the court finds probable cause exists and so orders.",
          "citation": "Haw. Rev. Stat. § 507-43(a)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q9",
          "text": "The notice required herein shall be published twice, seven days apart, in a newspaper of general circulation, printed and published in the county in which the property involved is situated, and the publishing newspaper shall promptly file the affidavit of publication above mentioned in the office of the clerk.",
          "citation": "Haw. Rev. Stat. § 507-43(f)",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol12_Ch0501-0588/HRS0507/HRS_0507-0043.htm",
          "sourceId": "hi-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q10",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day and including the last, unless the last day is a Sunday or holiday and then it is also excluded.",
          "citation": "Haw. Rev. Stat. § 1-29",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0001/HRS_0001-0029.htm",
          "sourceId": "hi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "hi-q11",
          "text": "The following days of each year are set apart and established as state holidays: The first day in January, New Year's Day; The third Monday in January, Dr. Martin Luther King, Jr., Day; The third Monday in February, Presidents' Day; The twenty-sixth day in March, Prince Jonah Kuhio Kalanianaole Day; The Friday preceding Easter Sunday, Good Friday; The last Monday in May, Memorial Day; The eleventh day in June, King Kamehameha I Day; The fourth day in July, Independence Day; The third Friday in August, Statehood Day; The first Monday in September, Labor Day; The eleventh day in November, Veterans' Day; The fourth Thursday in November, Thanksgiving Day; The twenty-fifth day in December, Christmas Day; All election days, except primary and special election days, in the county wherein the election is held; Any day designated by proclamation by the President of the United States or by the governor as a holiday.",
          "citation": "Haw. Rev. Stat. § 8-1",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0008/HRS_0008-0001.htm",
          "sourceId": "hi-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q12",
          "text": "If any of the State's legal holidays fall on Sunday, the following Monday shall be observed as a holiday. If the day falls on Saturday, the preceding Friday shall be observed as a holiday.",
          "citation": "Haw. Rev. Stat. § 8-2",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0008/HRS_0008-0002.htm",
          "sourceId": "hi-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "hi-q13",
          "text": "When so provided by the rules of court, the last day also shall be excluded if it is a Saturday.",
          "citation": "Haw. Rev. Stat. § 1-29",
          "url": "https://data.capitol.hawaii.gov/hrscurrent/Vol01_Ch0001-0042F/HRS0001/HRS_0001-0029.htm",
          "sourceId": "hi-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "hi-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "hi-q1",
            "hi-q2"
          ]
        },
        {
          "id": "hi-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "Where a notice that the improvement has been completed or abandoned is published and its affidavit of publication is filed",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 45
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "hi-q2",
            "hi-q3",
            "hi-q4"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "publication of a notice that the improvement has been completed or abandoned is complete and the affidavit of publication is filed"
            }
          ]
        },
        {
          "id": "hi-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a valid notice of completion is not published and filed within one year after the actual completion or abandonment of the improvement",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "45 days after the date one year after the actual completion or abandonment of the improvement"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "hi-q3",
            "hi-q5"
          ]
        },
        {
          "id": "hi-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where title to the property is registered in the land court and the lien is not claimed solely against the lessees' interest in one or more leasehold time share interests",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "A certified copy of the Order Directing Lien To Attach filed in the office of the assistant registrar of the land court within seven days after the order is entered"
          },
          "consequence": "The copy is filed to preserve the lien against later encumbrancers and purchasers of the property.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "hi-q6"
          ]
        },
        {
          "id": "hi-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Proceedings to enforce the lien commenced within three months after the entry of the Order Directing Lien to Attach"
          },
          "consequence": "The lien expires three months after the entry of the Order Directing Lien to Attach unless proceedings to enforce it are commenced within that time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "hi-q7",
            "hi-q8"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "The date of completion is when the owner or the general contractor completes publication of a notice that the improvement has been completed or abandoned and the affidavit of publication, with a copy of the notice, is filed with the clerk of the circuit court. The notice has no effect unless the improvement was first substantially completed or actually abandoned, and a contractor may publish it only after the owner fails to publish it within five days of the contractor's written demand. It is published twice, seven days apart, in a newspaper of general circulation in the county.",
          "quoteIds": [
            "hi-q4",
            "hi-q9"
          ]
        },
        {
          "text": "If a valid notice of completion is not published and filed within one year after the actual completion or abandonment of the improvement, the date of completion is one year after actual completion or abandonment.",
          "quoteIds": [
            "hi-q5"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "hi-q10"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "hi-q10"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr., Day",
            "quoteId": "hi-q11",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "hi-q11",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Prince Jonah Kuhio Kalanianaole Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 3,
            "day": 26,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "hi-q11",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "King Kamehameha I Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 6,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Statehood Day",
            "quoteId": "hi-q11",
            "kind": "nth-weekday",
            "month": 8,
            "weekday": 5,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "hi-q11",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "hi-q11",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "hi-q11",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "hi-q11",
          "hi-q12"
        ],
        "conditionalMove": {
          "day": "saturday",
          "condition": "when so provided by the rules of court",
          "unknown": "whether the rules of court so provide",
          "quoteIds": [
            "hi-q13"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "Haw. Rev. Stat. § 8-1 sets it as the Friday preceding Easter Sunday, whose date changes each year"
          },
          {
            "name": "election days other than primary and special election days",
            "reason": "Haw. Rev. Stat. § 8-1 names them for the county wherein the election is held, without stating their dates"
          }
        ]
      },
      "eventWording": [
        {
          "event": "notice-of-completion",
          "clause": "publication of a notice that the improvement has been completed or abandoned is complete and the affidavit of publication is filed",
          "input": "Notice of completion published and affidavit filed on",
          "hint": "Leave empty if no notice of completion has been published and filed."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "hi-0",
        "hi-1",
        "hi-2",
        "hi-3",
        "hi-4"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "IA",
      "name": "Iowa",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Iowa Code ch. 572",
      "statuteUrl": "https://www.legis.iowa.gov/docs/code/572.9.pdf",
      "summary": "Iowa sets the time to post a mechanic’s lien to the mechanics’ notice and lien registry at two years and ninety days after the last of the material was furnished or the last of the labor was performed, and a lien posted after ninety days also needs written notice to the owner and is enforced against the property only to the extent of the balance due to the general contractor or owner-builder when that notice is served. An action to enforce the lien is brought within two years from the expiration of those ninety days, and on residential construction a subcontractor posts a preliminary notice to the registry.",
      "effectiveOrAmended": "Iowa Code 2026. Sections 572.9 and 572.14 were last amended by 2012 Acts, chs. 1105 and 1138, section 572.10 by 2013 Acts, ch. 90, section 572.11 by 2013 Acts, ch. 99, section 572.13A by 2017 Acts, ch. 33, section 572.13B by 2014 Acts, ch. 1092, and section 572.27 by 2007 Acts, ch. 83.",
      "quotes": [
        {
          "id": "ia-q1",
          "text": "1. A subcontractor shall post a preliminary notice to the mechanics’ notice and lien registry internet site.",
          "citation": "Iowa Code § 572.13B(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q2",
          "text": "A preliminary notice posted before the balance due is paid to the general contractor or the owner-builder is effective as to all labor, service, equipment, and material furnished to the property by the subcontractor.",
          "citation": "Iowa Code § 572.13B(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q3",
          "text": "4. A subcontractor who fails to post a preliminary notice pursuant to this section shall not be entitled to a lien and remedy provided under this chapter.",
          "citation": "Iowa Code § 572.13B(4)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q4",
          "text": "3. a. A mechanic’s lien perfected under this chapter is enforceable only to the extent of the balance due the general contractor or the owner-builder at the time of the posting of the preliminary notice specified in subsection 1, and, except for residential construction property owned by an owner-builder, also is enforceable only to the extent of the balance due the general contractor at the time the owner actually receives the notice provided pursuant to subsection 2 or paragraph “b”.",
          "citation": "Iowa Code § 572.13B(3)(a)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q5",
          "text": "2. At the time a preliminary notice is posted to the mechanics’ notice and lien registry internet site, the administrator shall send notification to the owner, including the owner notice described in section 572.13, subsection 1, and shall post the mailing of the notice on the mechanics’ notice and lien registry internet site as prescribed by the administrator pursuant to rule.",
          "citation": "Iowa Code § 572.13B(2)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q6",
          "text": "5. This section applies only to residential construction properties.",
          "citation": "Iowa Code § 572.13B(5)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13B.pdf",
          "sourceId": "ia-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q7",
          "text": "11. “Subcontractor” includes every person furnishing material or performing labor upon any building, erection, or other improvement, except those having contracts directly with the owner. “Subcontractor” shall include those persons having contracts directly with an owner-builder.",
          "citation": "Iowa Code § 572.1(11)",
          "url": "https://www.legis.iowa.gov/docs/code/572.1.pdf",
          "sourceId": "ia-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q8",
          "text": "1. The notification requirements in this section apply only to commercial construction.",
          "citation": "Iowa Code § 572.33(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.33.pdf",
          "sourceId": "ia-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q9",
          "text": "2. A person furnishing labor or materials to a subcontractor shall not be entitled to a lien under this chapter unless the person furnishing labor or materials does all of the following: a. Notifies the general contractor or owner-builder in writing with a one-time notice containing the name, mailing address, and telephone number of the person furnishing the labor or materials, and the name of the subcontractor to whom the labor or materials were furnished, within thirty days of first furnishing labor or materials for which a lien claim may be made.",
          "citation": "Iowa Code § 572.33(2)",
          "url": "https://www.legis.iowa.gov/docs/code/572.33.pdf",
          "sourceId": "ia-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q10",
          "text": "b. Supports the lien claim with a certified statement that the general contractor or owner-builder was notified in writing with a one-time notice containing the name, mailing address, and telephone number of the person furnishing the labor or materials, and the name of the subcontractor to whom the labor or materials were furnished, within thirty days after the labor or materials were first furnished, pursuant to paragraph “a”.",
          "citation": "Iowa Code § 572.33(2)(b)",
          "url": "https://www.legis.iowa.gov/docs/code/572.33.pdf",
          "sourceId": "ia-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q11",
          "text": "1. Either a general contractor, or an owner-builder who has contracted or will contract with a subcontractor to provide labor or furnish material for the property, shall post a notice of commencement of work to the mechanics’ notice and lien registry internet site no later than ten days after the commencement of work on the property.",
          "citation": "Iowa Code § 572.13A(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
          "sourceId": "ia-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q12",
          "text": "4. A general contractor who fails to provide notice pursuant to this section is not entitled to a lien and remedy provided by this chapter.",
          "citation": "Iowa Code § 572.13A(4)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
          "sourceId": "ia-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q13",
          "text": "5. This section applies only to residential construction properties.",
          "citation": "Iowa Code § 572.13A(5)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
          "sourceId": "ia-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q14",
          "text": "4. This section applies only to residential construction properties.",
          "citation": "Iowa Code § 572.13(4)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13.pdf",
          "sourceId": "ia-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q15",
          "text": "Except as provided in section 572.13B, payment to the general contractor or owner-builder of any part or all of the contract price of the building or improvement within ninety days after the date on which the last of the materials was furnished or the last of the labor was performed by a subcontractor, does not relieve the owner from liability to the subcontractor for the full value of any material furnished or labor performed upon the building, land, or improvement if the subcontractor posts a lien within ninety days after the date on which the last of the materials was furnished or the last of the labor was performed.",
          "citation": "Iowa Code § 572.14",
          "url": "https://www.legis.iowa.gov/docs/code/572.14.pdf",
          "sourceId": "ia-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q16",
          "text": "The statement of account required by section 572.8 shall be posted by a general contractor or subcontractor within two years and ninety days after the date on which the last of the material was furnished or the last of the labor was performed.",
          "citation": "Iowa Code § 572.9",
          "url": "https://www.legis.iowa.gov/docs/code/572.9.pdf",
          "sourceId": "ia-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q17",
          "text": "A general contractor or a subcontractor may perfect a mechanic’s lien pursuant to section 572.8 beyond ninety days after the date on which the last of the material was furnished or the last of the labor was performed by posting a lien to the mechanics’ notice and lien registry internet site and giving written notice thereof to the owner.",
          "citation": "Iowa Code § 572.10",
          "url": "https://www.legis.iowa.gov/docs/code/572.10.pdf",
          "sourceId": "ia-7",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q18",
          "text": "Liens perfected under section 572.10 shall be enforced against the property or upon the bond, if given, by the owner or by the owner-builder’s buyer, only to the extent of the balance due from the owner to the general contractor or from the owner-builder’s buyer to the owner-builder at the time of the service of such notice; but if the bond was given by the general contractor or owner-builder, or person contracting with the subcontractor posting the claim for a lien, such bond shall be enforced to the full extent of the amount found due the subcontractor.",
          "citation": "Iowa Code § 572.11",
          "url": "https://www.legis.iowa.gov/docs/code/572.11.pdf",
          "sourceId": "ia-8",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q19",
          "text": "Any action to enforce a mechanic’s lien shall be brought within two years from the expiration of ninety days after the date on which the last of the material was furnished or the last of the labor was performed.",
          "citation": "Iowa Code § 572.27",
          "url": "https://www.legis.iowa.gov/docs/code/572.27.pdf",
          "sourceId": "ia-9",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q20",
          "text": "1. Upon the written demand of the owner served on the claimant requiring the claimant to commence action to enforce the lien, such action shall be commenced within thirty days thereafter, or the lien and all benefits derived therefrom shall be forfeited.",
          "citation": "Iowa Code § 572.28(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.28.pdf",
          "sourceId": "ia-10",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q21",
          "text": "10. “Residential construction” means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.",
          "citation": "Iowa Code § 572.1(10)",
          "url": "https://www.legis.iowa.gov/docs/code/572.1.pdf",
          "sourceId": "ia-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q22",
          "text": "3. A general contractor who fails to provide notice pursuant to this section is not entitled to a lien and remedy provided by this chapter.",
          "citation": "Iowa Code § 572.13(3)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13.pdf",
          "sourceId": "ia-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q23",
          "text": "A notice of commencement of work is effective only as to any labor, service, equipment, or material furnished to the property subsequent to the posting of the notice of commencement of work.",
          "citation": "Iowa Code § 572.13A(1)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
          "sourceId": "ia-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q24",
          "text": "A notice of commencement of work must be posted to the mechanics’ notice and lien registry internet site before preliminary notices pursuant to section 572.13B may be posted.",
          "citation": "Iowa Code § 572.13A(2)",
          "url": "https://www.legis.iowa.gov/docs/code/572.13A.pdf",
          "sourceId": "ia-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q25",
          "text": "In computing time, the first day shall be excluded and the last included, unless the last falls on Sunday, in which case the time prescribed shall be extended so as to include the whole of the following Monday.",
          "citation": "Iowa Code § 4.1(34)",
          "url": "https://www.legis.iowa.gov/docs/code/4.1.pdf",
          "sourceId": "ia-11",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q26",
          "text": "However, when by the provisions of a statute or rule prescribed under authority of a statute, the last day for the commencement of an action or proceedings, the filing of a pleading or motion in a pending action or proceedings, or the perfecting or filing of an appeal from the decision or award of a court, board, commission, or official falls on a Saturday, a Sunday, a day on which the office of the clerk of the district court is closed in whole or in part pursuant to the authority of the supreme court,",
          "citation": "Iowa Code § 4.1(34)",
          "url": "https://www.legis.iowa.gov/docs/code/4.1.pdf",
          "sourceId": "ia-11",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ia-q27",
          "text": "the first day of January, the third Monday in January, the twelfth day of February, the third Monday in February, the last Monday in May, the fourth day of July, the first Monday in September, the eleventh day of November, the fourth Thursday in November, the twenty-fifth day of December, and the following Monday when any of the foregoing named legal holidays fall on a Sunday, and any day appointed or recommended by the governor of Iowa or the president of the United States as a day of fasting or thanksgiving, the time shall be extended to include the next day which the office of the clerk of the court or the office of the board, commission, or official is open to receive the filing of a commencement of an action, pleading or a motion in a pending action or proceeding, or the perfecting or filing of an appeal.",
          "citation": "Iowa Code § 4.1(34)",
          "url": "https://www.legis.iowa.gov/docs/code/4.1.pdf",
          "sourceId": "ia-11",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ia-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Posted before the balance due is paid to the general contractor or the owner-builder, to be effective as to all labor, service, equipment, and material furnished"
          },
          "consequence": "A subcontractor who fails to post a preliminary notice has no lien and remedy under this chapter. A lien is enforceable only to the extent of the balance due the general contractor or owner-builder when the notice is posted and, except for residential construction property owned by an owner-builder, also only to the extent of the balance due the general contractor when the owner actually receives the notice.",
          "recipients": null,
          "delivery": "Posted to the mechanics’ notice and lien registry internet site. The administrator then sends notification to the owner.",
          "quoteIds": [
            "ia-q1",
            "ia-q2",
            "ia-q3",
            "ia-q4",
            "ia-q5",
            "ia-q6",
            "ia-q7"
          ]
        },
        {
          "id": "ia-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where section 572.33 applies, for a person furnishing labor or materials to a subcontractor",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "A person furnishing labor or materials to a subcontractor has no lien under this chapter unless it gives this notice and supports the lien claim with a certified statement that it did.",
          "recipients": [
            "The general contractor or owner-builder"
          ],
          "delivery": null,
          "quoteIds": [
            "ia-q8",
            "ia-q9",
            "ia-q10"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "first furnishing labor or materials for which a lien claim may be made"
            }
          ]
        },
        {
          "id": "ia-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "No later than ten days after the commencement of work on the property"
          },
          "consequence": "A general contractor who fails to provide notice under this section has no lien and remedy under this chapter.",
          "recipients": null,
          "delivery": "A notice of commencement of work, posted to the mechanics’ notice and lien registry internet site.",
          "quoteIds": [
            "ia-q11",
            "ia-q12",
            "ia-q13"
          ]
        },
        {
          "id": "ia-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ia-q13",
            "ia-q14",
            "ia-q6"
          ]
        },
        {
          "id": "ia-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the owner to stay liable to the subcontractor for the full value despite payment to the general contractor or owner-builder, except as provided in section 572.13B",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Payment to the general contractor or owner-builder within that time does not relieve the owner from liability to the subcontractor for the full value of material furnished or labor performed.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ia-q15"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last of the materials was furnished or the last of the labor was performed"
            }
          ]
        },
        {
          "id": "ia-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within two years and ninety days after the date on which the last of the material was furnished or the last of the labor was performed"
          },
          "consequence": "A lien posted more than ninety days after that date is perfected only by also giving written notice to the owner, and is enforced against the property only to the extent of the balance due from the owner to the general contractor, or from the owner-builder’s buyer to the owner-builder, when the notice is served.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ia-q16",
            "ia-q17",
            "ia-q18"
          ]
        },
        {
          "id": "ia-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within two years from the expiration of ninety days after the date on which the last of the material was furnished or the last of the labor was performed"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ia-q19"
          ]
        },
        {
          "id": "ia-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Upon the written demand of the owner served on the claimant requiring the claimant to commence action to enforce the lien",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within thirty days after the demand is served"
          },
          "consequence": "Otherwise the lien and all benefits derived from it are forfeited.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ia-q20"
          ]
        }
      ],
      "residential": [
        {
          "text": "On residential construction, a general contractor who has contracted or will contract with a subcontractor gives the owner a written owner notice in boldface type, and a general contractor who fails to give it has no lien and remedy under the chapter.",
          "quoteIds": [
            "ia-q22",
            "ia-q14"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "On residential construction, a notice of commencement of work is effective only as to labor, service, equipment or material furnished after it is posted, and it must be posted before preliminary notices may be posted.",
          "quoteIds": [
            "ia-q23",
            "ia-q24"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "In these rules, residential means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes.",
        "quoteIds": [
          "ia-q21"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ia-q25"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": false,
          "appliesTo": "all",
          "quoteIds": [
            "ia-q25"
          ]
        },
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [],
        "closure": {
          "clause": "for the commencement of an action or proceedings that falls on a Saturday, a Sunday, a legal holiday the section names, or a day on which the office of the clerk of the district court is closed in whole or in part",
          "place": "the office of the clerk of the court",
          "quoteIds": [
            "ia-q26",
            "ia-q27"
          ]
        }
      },
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ia-0",
        "ia-1",
        "ia-2",
        "ia-3",
        "ia-4",
        "ia-5",
        "ia-6",
        "ia-7",
        "ia-8",
        "ia-9",
        "ia-10",
        "ia-11"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "ID",
      "name": "Idaho",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Idaho Code tit. 45, ch. 5",
      "statuteUrl": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
      "summary": "Idaho gives every claimant 90 days after the completion of the labor or services, or the furnishing of materials, to file a claim of lien with the county recorder, and a copy is served on the owner or reputed owner no later than five business days after filing. The lien binds the property for no longer than six months after the claim is filed unless proceedings to enforce it are commenced in a proper court within that time, or a payment on account or an extension of credit is endorsed on the record of the lien, in which case the six months run from the date of the payment or the expiration of the extension.",
      "effectiveOrAmended": "Section 45-507 was last amended by 2022, ch. 66; section 45-510 by 2015, ch. 339.",
      "quotes": [
        {
          "id": "id-q1",
          "text": "(1) Any person claiming a lien pursuant to the provisions of this chapter must file a claim for record with the county recorder for the county in which such property or some part thereof is situated.",
          "citation": "Idaho Code § 45-507(1)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q2",
          "text": "The claim shall be filed within ninety (90) days after the completion of the labor or services, or furnishing of materials.",
          "citation": "Idaho Code § 45-507(2)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q3",
          "text": "(5) A true and correct copy of the claim of lien shall be served on the owner or reputed owner of the property either by an officer authorized by law to serve process delivering a copy thereof to the owner or reputed owner personally or by mailing a copy thereof by certified mail to the owner or reputed owner at his last known address.",
          "citation": "Idaho Code § 45-507(5)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q4",
          "text": "Such delivery or mailing shall be made no later than five (5) business days following the filing of said claim of lien.",
          "citation": "Idaho Code § 45-507(5)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q5",
          "text": "(1) No lien provided for in this chapter binds any building, mining claim, improvement or structure for a longer period than six (6) months after the claim has been filed, unless proceedings be commenced in a proper court within that time to enforce such lien; or unless a payment on account is made, or extension of credit given with expiration date thereof, and such payment or credit and expiration date, is endorsed on the record of the lien, then six (6) months after the date of such payment or expiration of extension.",
          "citation": "Idaho Code § 45-510(1)",
          "url": "https://web.archive.org/web/20251219143937id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-510/",
          "sourceId": "id-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-19"
        },
        {
          "id": "id-q6",
          "text": "(3) The claim shall contain:",
          "citation": "Idaho Code § 45-507(3)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q7",
          "text": "(e) For work or materials subject to the provisions of section 45-525, Idaho Code, the required proof of disclosure and acknowledgment of receipt.",
          "citation": "Idaho Code § 45-507(3)(e)",
          "url": "https://web.archive.org/web/20260515045715id_/https://legislature.idaho.gov/statutesrules/idstat/Title45/T45CH5/SECT45-507/",
          "sourceId": "id-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-15"
        },
        {
          "id": "id-q8",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day, and including the last unless the last is a holiday and then it is also excluded.",
          "citation": "Idaho Code § 73-109",
          "url": "https://web.archive.org/web/20251224185027id_/https://legislature.idaho.gov/statutesrules/idstat/Title73/T73CH1/SECT73-109/",
          "sourceId": "id-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-24"
        },
        {
          "id": "id-q9",
          "text": "Holidays, within the meaning of these compiled laws, are: Every Sunday; January 1 (New Year’s Day); Third Monday in January (Martin Luther King, Jr.-Idaho Human Rights Day); Third Monday in February (Washington’s Birthday); Last Monday in May (Memorial Day); July 4 (Independence Day); First Monday in September (Labor Day); Second Monday in October (Columbus Day); November 11 (Veterans Day); Fourth Thursday in November (Thanksgiving Day); December 25 (Christmas); Every day appointed by the President of the United States, or by the governor of this state, for a public fast, thanksgiving, or holiday.",
          "citation": "Idaho Code § 73-108",
          "url": "https://web.archive.org/web/20251112164259id_/https://legislature.idaho.gov/statutesrules/idstat/Title73/T73CH1/SECT73-108/",
          "sourceId": "id-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-12"
        },
        {
          "id": "id-q10",
          "text": "Any legal holiday that falls on Saturday, the preceding Friday shall be a holiday and any legal holiday enumerated herein other than Sunday that falls on Sunday, the following Monday shall be a holiday.",
          "citation": "Idaho Code § 73-108",
          "url": "https://web.archive.org/web/20251112164259id_/https://legislature.idaho.gov/statutesrules/idstat/Title73/T73CH1/SECT73-108/",
          "sourceId": "id-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-12"
        }
      ],
      "rules": [
        {
          "id": "id-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "id-q1"
          ]
        },
        {
          "id": "id-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "id-q2",
            "id-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the labor or services were completed or the materials were furnished"
            }
          ]
        },
        {
          "id": "id-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "No later than five (5) business days following the filing of the claim of lien"
          },
          "consequence": null,
          "recipients": [
            "The owner or reputed owner of the property"
          ],
          "delivery": "Delivered personally by an officer authorized by law to serve process, or mailed by certified mail to the owner or reputed owner at the last known address.",
          "quoteIds": [
            "id-q3",
            "id-q4"
          ]
        },
        {
          "id": "id-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien does not bind the property for longer than that unless proceedings to enforce it are commenced in a proper court within that time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "id-q5"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim is filed"
            }
          ],
          "mayChangeIf": "a payment on account is made, or an extension of credit is given, and it is endorsed on the record of the lien"
        }
      ],
      "residential": [
        {
          "text": "For work or materials subject to Idaho Code § 45-525 (a general contractor's disclosures for residential real property), the claim of lien contains the required proof of disclosure and acknowledgment of receipt.",
          "quoteIds": [
            "id-q6",
            "id-q7"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "id-q8"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "id-q8",
            "id-q9"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "id-q9",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.-Idaho Human Rights Day",
            "quoteId": "id-q9",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington's Birthday",
            "quoteId": "id-q9",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "id-q9",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "id-q9",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "id-q9",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "id-q9",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "id-q9",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "id-q9",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas",
            "quoteId": "id-q9",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "id-q9",
          "id-q10"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the claim is filed",
          "input": "Claim of lien filed on",
          "hint": "Leave empty if no claim of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "id-0",
        "id-1",
        "id-2",
        "id-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "IL",
      "name": "Illinois",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "770 ILCS 60 (Mechanics Lien Act)",
      "statuteUrl": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
      "summary": "In Illinois a direct contractor files a claim for lien or brings an action within 4 months after completion, or after extra or additional work is completed or extra or additional materials are finally delivered, to enforce the lien against other creditors, encumbrancers and purchasers, and files within 2 years after the contract or any extra work is completed, or any extra materials are furnished, as to the owner. Subcontractors, sub-subcontractors, suppliers and laborers serve a notice within 90 days after completing their own contract and file within the time limits set for the contractor.",
      "effectiveOrAmended": "Sections 5, 21 and 24 were amended by P.A. 103-827, effective January 1, 2025; section 7 by P.A. 96-654, effective January 1, 2010; section 34 by P.A. 100-1061, effective January 1, 2019.",
      "quotes": [
        {
          "id": "il-q1",
          "text": "shall within 90 days after the completion thereof, or, if extra or additional work or material is delivered thereafter, within 90 days after the date of completion of such extra or additional work or final delivery of such extra or additional material, cause a written notice of his or her claim and the amount due or to become due thereunder, to be provided to the owner of record or the owner of record's agent or architect, or the superintendent having charge of the building or improvement and to the lending agency, if known",
          "citation": "770 ILCS 60/24(a)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q2",
          "text": "Notice shall be considered served at the time the written notice is placed with the delivery service or in the mail.",
          "citation": "770 ILCS 60/24(a)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q3",
          "text": "It shall be the duty of each subcontractor who has furnished, or is furnishing, labor, services, material, fixtures, apparatus or machinery, or forms or form work for an existing owner-occupied single family residence, in order to preserve the subcontractor's lien",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q4",
          "text": "to notify the occupant either personally or by certified mail, return receipt requested, addressed to the occupant or the occupant's agent of the residence within 60 days from the subcontractor's first furnishing labor",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q5",
          "text": "any notice given after 60 days by the subcontractor shall preserve the subcontractor's lien, but only to the extent that the owner has not been prejudiced by payments made prior to receipt of the notice",
          "citation": "770 ILCS 60/21(c)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q6",
          "text": "(a) No contractor shall be allowed to enforce such lien against or to the prejudice of any other creditor or incumbrancer or purchaser, unless within 4 months after completion, or if extra or additional work is done or labor, services, material, fixtures, apparatus or machinery, forms or form work is delivered therefor within 4 months after the completion of such extra or additional work or the final delivery of such extra or additional labor, services, material, fixtures, apparatus or machinery, forms or form work, he or she shall either bring an action to enforce his or her lien therefor or shall file in the office of the recorder of the county in which the building, erection or other improvement to be charged with the lien is situated, a claim for lien",
          "citation": "770 ILCS 60/7(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q7",
          "text": "as to the owner may be filed at any time after the contract is made and within 2 years after the completion of the contract, or the completion of any extra work or the furnishing of any extra labor, services, material, fixtures, apparatus or machinery, forms or form work thereunder",
          "citation": "770 ILCS 60/7(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q8",
          "text": "then such person may file a claim for lien or file a complaint and enforce such lien within the same limits as to time and in such other manner as hereinbefore provided for the contractor in Section 7 and Sections 9 to 20 inclusive, of this Act",
          "citation": "770 ILCS 60/28",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q9",
          "text": "A contractor for improvements of an owner-occupied single-family residence must give the owner written notice within 10 days after recording a lien against any property of the owner.",
          "citation": "770 ILCS 60/7(d)",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q10",
          "text": "If timely notice is not given and, as a result, the owner has suffered damages before notice is given, the lien is extinguished to the extent of the damages.",
          "citation": "770 ILCS 60/7(d)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q11",
          "text": "Such suit shall be commenced or counterclaim filed within two years after the completion of the contract, or completion of the extra or additional work, or furnishing of extra or additional material thereunder.",
          "citation": "770 ILCS 60/9",
          "url": "https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q12",
          "text": "Upon written demand of the owner, lienor, a recorder under Section 3-5010.8 of the Counties Code, or any person interested in the real estate, or their agent or attorney, served on the person claiming the lien, or his agent or attorney, requiring suit to be commenced to enforce the lien or answer to be filed in a pending suit, suit shall be commenced or answer filed within 30 days thereafter, or the lien shall be forfeited.",
          "citation": "770 ILCS 60/34(a)",
          "url": "https://web.archive.org/web/20260409150323id_/https://www.ilga.gov/Legislation/ILCS/Articles?ActID=2254&ChapterID=63",
          "sourceId": "il-1",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-04-09"
        },
        {
          "id": "il-q13",
          "text": "The time within which any act provided by law is to be done shall be computed by excluding the first day and including the last,",
          "citation": "5 ILCS 70/1.11",
          "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
          "sourceId": "il-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-02"
        },
        {
          "id": "il-q14",
          "text": "unless the last day is Saturday or Sunday or is a holiday as defined or fixed in any statute now or hereafter in force in this State, and then it shall also be excluded. If the day succeeding such Saturday, Sunday or holiday is also a holiday or a Saturday or Sunday then such succeeding day shall also be excluded.",
          "citation": "5 ILCS 70/1.11",
          "url": "https://web.archive.org/web/20250502043732id_/https://www.ilga.gov/legislation/ilcs/documents/000500700K1.11.htm",
          "sourceId": "il-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-02"
        },
        {
          "id": "il-q15",
          "text": "The following days shall be legal holidays in the State of Illinois upon which day a bank may, but is not required to, remain closed:",
          "citation": "205 ILCS 630/17(a)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        },
        {
          "id": "il-q16",
          "text": "the first day of January (New Year's Day); the third Monday in January (observance of Martin Luther King, Jr.'s birthday); the twelfth day in February (Abraham Lincoln's birthday); the third Monday in February (Presidents Day); the first Monday in March (observance of Casimir Pulaski's birthday); the Friday preceding Easter Sunday (Good Friday); the last Monday of May (Memorial Day); the nineteenth day of June (Juneteenth National Freedom Day); the fourth day of July (Independence Day); the first Monday in September (Labor Day); the second Monday in October (Columbus Day); the eleventh day of November (Veterans' Day); the fourth Thursday in November (Thanksgiving Day); the twenty-fifth day in December (Christmas Day);",
          "citation": "205 ILCS 630/17(a)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-10-03",
          "capturedAt": "2025-03-11"
        },
        {
          "id": "il-q17",
          "text": "the days upon which the general elections for members of the House of Representatives are held, and any day proclaimed by the Governor of this State as a legal holiday.",
          "citation": "205 ILCS 630/17(a)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        },
        {
          "id": "il-q18",
          "text": "When any such holidays, except Juneteenth National Freedom Day, fall on Sunday, the Monday next following shall be held and considered such holiday.",
          "citation": "205 ILCS 630/17(d)",
          "url": "https://web.archive.org/web/20250311173233id_/https://www.ilga.gov/legislation/ilcs/documents/020506300K17.htm",
          "sourceId": "il-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-03-11"
        }
      ],
      "rules": [
        {
          "id": "il-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 90 days after the claimant's own contract is completed, or after completion of extra or additional work or final delivery of extra or additional material."
          },
          "consequence": null,
          "recipients": null,
          "delivery": "The notice is served when it is placed with the delivery service or in the mail.",
          "quoteIds": [
            "il-q1",
            "il-q2"
          ]
        },
        {
          "id": "il-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For work on an existing owner-occupied single family residence",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "A notice given after 60 days preserves the lien only to the extent the owner has not been prejudiced by payments made before receiving it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q3",
            "il-q4",
            "il-q5"
          ]
        },
        {
          "id": "il-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Against or to the prejudice of any other creditor or incumbrancer or purchaser",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": "A contractor that neither files the claim for lien nor brings an action within this time may not enforce the lien against or to the prejudice of any other creditor, encumbrancer or purchaser.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "completion, or the completion of extra or additional work or the final delivery of extra or additional labor, services, material, fixtures, apparatus or machinery, forms or form work, occurs"
            }
          ]
        },
        {
          "id": "il-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "As to the owner",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q7"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the contract, or any extra work, is completed, or any extra labor, services, material, fixtures, apparatus or machinery, forms or form work is furnished under it"
            }
          ]
        },
        {
          "id": "il-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q8"
          ]
        },
        {
          "id": "il-service-0",
          "stage": "service",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For improvements of an owner-occupied single-family residence",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 10
            }
          },
          "notComputed": null,
          "consequence": "If timely notice is not given and the owner suffers damages as a result before notice is given, the lien is extinguished to the extent of the damages.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "il-q9",
            "il-q10"
          ]
        },
        {
          "id": "il-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q11"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the contract, or the extra or additional work, is completed, or extra or additional material is furnished under it"
            }
          ]
        },
        {
          "id": "il-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After a written demand of the owner, lienor, a recorder under Section 3-5010.8 of the Counties Code, or any person interested in the real estate, or their agent or attorney, requiring suit to be commenced or answer to be filed in a pending suit",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Suit commenced, or answer filed in a pending suit, within 30 days after the demand is served."
          },
          "consequence": "If suit is not commenced or an answer filed within that time, the lien is forfeited.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q12"
          ]
        },
        {
          "id": "il-enforcement-2",
          "stage": "enforcement",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "il-q8",
            "il-q11"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "il-q13"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "il-q14"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s birthday",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Abraham Lincoln's birthday",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Casimir Pulaski's birthday",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 3,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "il-q15",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth National Freedom Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "il-q15",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "il-q15",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "il-q15",
          "il-q16",
          "il-q17",
          "il-q18"
        ],
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "205 ILCS 630/17(a) sets it as the Friday preceding Easter Sunday, whose date changes each year"
          },
          {
            "name": "the days upon which the general elections for members of the House of Representatives are held",
            "reason": "205 ILCS 630/17(a) names them without stating their dates"
          }
        ]
      },
      "eventWording": [
        {
          "event": "completion",
          "clause": "completion occurs, or extra or additional work is completed, or extra or additional labor or material is finally delivered or furnished",
          "input": "Completion, or completion of extra or additional work, on",
          "hint": "If extra or additional work, labor or material was furnished under the contract, the date that work was completed or that labor or material was last delivered or furnished."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "il-0",
        "il-1",
        "il-2",
        "il-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "IN",
      "name": "Indiana",
      "status": "verified",
      "releaseBatch": 2,
      "statute": "Ind. Code ch. 32-28-3",
      "statuteUrl": "https://iga.in.gov/laws/2026/ic/titles/32",
      "summary": "Indiana gives 90 days after performing labor or furnishing materials or machinery to file a sworn statement and notice of intention to hold a lien in the county recorder's office, or 60 days for work related to a Class 2 structure, and one year after that notice is recorded to file a complaint to enforce the lien. A person that sells or furnishes material, labor or machinery on credit to someone other than the owner gives the owner written notice within 30 days after the first delivery or labor for the alteration or repair of an owner occupied single or double family dwelling, or within 60 days for the original construction of one for the owner's occupancy.",
      "effectiveOrAmended": "IC 32-28-3-1 was last amended by P.L.81-2020, IC 32-28-3-3 by P.L.146-2008, IC 32-28-3-6 by P.L.45-2016 and IC 32-28-3-10 by P.L.196-2019.",
      "quotes": [
        {
          "id": "in-q1",
          "text": "(h) A person, firm, partnership, limited liability company, or corporation that sells or furnishes on credit any material, labor, or machinery for the alteration or repair of an owner occupied single or double family dwelling or the appurtenances or additions to the dwelling to:",
          "citation": "Ind. Code § 32-28-3-1(h)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q2",
          "text": "(1) a contractor, subcontractor, mechanic; or",
          "citation": "Ind. Code § 32-28-3-1(h)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q3",
          "text": "(2) anyone other than the occupying owner or the owner's legal representative;",
          "citation": "Ind. Code § 32-28-3-1(h)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q4",
          "text": "must furnish to the occupying owner of the parcel of land where the material, labor, or machinery is delivered a written notice of the delivery or work and of the existence of lien rights not later than thirty (30) days after the date of first delivery or labor performed.",
          "citation": "Ind. Code § 32-28-3-1(h)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q5",
          "text": "The furnishing of the notice is a condition precedent to the right of acquiring a lien upon the lot or parcel of land or the improvement on the lot or parcel of land.",
          "citation": "Ind. Code § 32-28-3-1(h)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q6",
          "text": "(i) A person, firm, partnership, limited liability company, or corporation that sells or furnishes on credit material, labor, or machinery for the original construction of a single or double family dwelling for the intended occupancy of the owner upon whose real estate the construction takes place to a contractor, subcontractor, mechanic, or anyone other than the owner or the owner's legal representatives must:",
          "citation": "Ind. Code § 32-28-3-1(i)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q7",
          "text": "(1) furnish the owner of the real estate:",
          "citation": "Ind. Code § 32-28-3-1(i)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q8",
          "text": "(A) as named in the latest entry in the transfer books described in IC 6-1.1-5-4 of the county auditor; or",
          "citation": "Ind. Code § 32-28-3-1(i)(1)(A)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q9",
          "text": "(B) if IC 6-1.1-5-9 applies, as named in the transfer books of the township assessor (if any) or the county assessor;",
          "citation": "Ind. Code § 32-28-3-1(i)(1)(B)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q10",
          "text": "with a written notice of the delivery or labor and the existence of lien rights not later than sixty (60) days after the date of the first delivery or labor performed; and",
          "citation": "Ind. Code § 32-28-3-1(i)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q11",
          "text": "(2) file a copy of the written notice in the recorder's office of the county not later than sixty (60) days after the date of the first delivery or labor performed.",
          "citation": "Ind. Code § 32-28-3-1(i)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q12",
          "text": "The furnishing and filing of the notice is a condition precedent to the right of acquiring a lien upon the real estate or upon the improvement constructed on the real estate.",
          "citation": "Ind. Code § 32-28-3-1(i)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q13",
          "text": "(a) Except as provided in subsection (b), a person who wishes to acquire a lien upon property, whether the claim is due or not, must file in duplicate a sworn statement and notice of the person's intention to hold a lien upon the property for the amount of the claim:",
          "citation": "Ind. Code § 32-28-3-3(a)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q14",
          "text": "(1) in the recorder's office of the county; and",
          "citation": "Ind. Code § 32-28-3-3(a)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q15",
          "text": "(2) not later than ninety (90) days after performing labor or furnishing materials or machinery described in section 1 of this chapter.",
          "citation": "Ind. Code § 32-28-3-3(a)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q16",
          "text": "(b) This subsection applies to a person that performs labor or furnishes materials or machinery described in section 1 of this chapter related to a Class 2 structure (as defined in IC 22-12-1-5) or an improvement on the same real estate auxiliary to a Class 2 structure (as defined in IC 22-12-1-5). A person who wishes to acquire a lien upon property, whether the claim is due or not, must file in duplicate a sworn statement and notice of the person's intention to hold a lien upon the property for the amount of the claim:",
          "citation": "Ind. Code § 32-28-3-3(b)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q17",
          "text": "(1) in the recorder's office of the county; and",
          "citation": "Ind. Code § 32-28-3-3(b)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q18",
          "text": "(2) not later than sixty (60) days after performing labor or furnishing materials or machinery described in section 1 of this chapter.",
          "citation": "Ind. Code § 32-28-3-3(b)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q19",
          "text": "(a) A person may enforce a lien by filing a complaint in the circuit or superior court of the county where the real estate or property that is the subject of the lien is situated. The complaint must be filed not later than one (1) year after:",
          "citation": "Ind. Code § 32-28-3-6(a)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q20",
          "text": "(1) the date the statement and notice of intention to hold a lien was recorded under section 3 of this chapter; or",
          "citation": "Ind. Code § 32-28-3-6(a)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q21",
          "text": "(2) subject to subsection (c), the expiration of the credit, if a credit is given.",
          "citation": "Ind. Code § 32-28-3-6(a)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q22",
          "text": "(b) Except as provided in subsection (c), if a lien is not enforced within the time set forth in subsection (a), the lien is void.",
          "citation": "Ind. Code § 32-28-3-6(b)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q23",
          "text": "(c) A credit does not extend the time for filing an action to enforce the lien under subsection (a)(2) unless:",
          "citation": "Ind. Code § 32-28-3-6(c)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q24",
          "text": "(1) the terms of the credit are in writing;",
          "citation": "Ind. Code § 32-28-3-6(c)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q25",
          "text": "(2) the credit was executed by:",
          "citation": "Ind. Code § 32-28-3-6(c)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q26",
          "text": "(A) the lienholder; and",
          "citation": "Ind. Code § 32-28-3-6(c)(2)(A)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q27",
          "text": "(B) all owners of record; and",
          "citation": "Ind. Code § 32-28-3-6(c)(2)(B)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q28",
          "text": "(3) the credit was recorded:",
          "citation": "Ind. Code § 32-28-3-6(c)(3)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q29",
          "text": "(A) in the same manner as the original statement and notice of intention to hold a lien; and",
          "citation": "Ind. Code § 32-28-3-6(c)(3)(A)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q30",
          "text": "(B) not later than one (1) year after the date the statement and notice of intention to hold a lien was recorded.",
          "citation": "Ind. Code § 32-28-3-6(c)(3)(B)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q31",
          "text": "(a) A lien is void if both of the following occur:",
          "citation": "Ind. Code § 32-28-3-10(a)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q32",
          "text": "(1) The owner of property subject to a mechanic's lien or any person or corporation having an interest in the property, including a mortgagee or a lienholder, provides written notice to the owner or holder of the lien to file an action to foreclose the lien.",
          "citation": "Ind. Code § 32-28-3-10(a)(1)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q33",
          "text": "(2) The owner or holder of the lien fails to file an action to foreclose the lien in the county where the property is located not later than thirty (30) days after receiving the notice.",
          "citation": "Ind. Code § 32-28-3-10(a)(2)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q34",
          "text": "However, this section does not prevent the claim from being collected as other claims are collected by law.",
          "citation": "Ind. Code § 32-28-3-10(a)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "in-q35",
          "text": "(j) A lien for material or labor in original construction does not attach to real estate purchased by an innocent purchaser for value without notice of a single or double family dwelling for occupancy by the purchaser unless notice of intention to hold the lien is recorded under section 3 of this chapter before recording the deed by which the purchaser takes title.",
          "citation": "Ind. Code § 32-28-3-1(j)",
          "url": "https://iga.in.gov/laws/2026/ic/titles/32",
          "sourceId": "in-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "in-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the alteration or repair of an owner occupied single or double family dwelling or its appurtenances or additions, where the material, labor or machinery is sold or furnished on credit to a contractor, subcontractor or mechanic, or to anyone other than the occupying owner or the owner's legal representative",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Furnishing the notice is a condition precedent to the right of acquiring a lien upon the lot or parcel of land or the improvement on it.",
          "recipients": [
            "The occupying owner of the parcel of land where the material, labor or machinery is delivered"
          ],
          "delivery": null,
          "quoteIds": [
            "in-q1",
            "in-q2",
            "in-q3",
            "in-q4",
            "in-q5"
          ]
        },
        {
          "id": "in-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the original construction of a single or double family dwelling for the intended occupancy of the owner on whose real estate it is built, where the material, labor or machinery is sold or furnished on credit to a contractor, subcontractor, mechanic or anyone other than the owner or the owner's legal representatives",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "Furnishing and filing the notice is a condition precedent to the right of acquiring a lien upon the real estate or upon the improvement constructed on it.",
          "recipients": [
            "The owner of the real estate, as named in the latest entry in the county auditor's transfer books or, where IC 6-1.1-5-9 applies, in the transfer books of the township assessor (if any) or the county assessor"
          ],
          "delivery": "A copy of the written notice is also filed in the recorder's office of the county within the same 60 days.",
          "quoteIds": [
            "in-q6",
            "in-q7",
            "in-q8",
            "in-q9",
            "in-q10",
            "in-q11",
            "in-q12"
          ]
        },
        {
          "id": "in-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "in-q13",
            "in-q14",
            "in-q15"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant performed labor or furnished materials or machinery"
            }
          ]
        },
        {
          "id": "in-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For labor, materials or machinery related to a Class 2 structure (as defined in IC 22-12-1-5), or to an improvement on the same real estate auxiliary to a Class 2 structure",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "in-q16",
            "in-q17",
            "in-q18"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant performed labor or furnished materials or machinery"
            }
          ]
        },
        {
          "id": "in-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "If the lien is not enforced within that time, it is void, except as subsection (c) provides for a credit.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "in-q19",
            "in-q20",
            "in-q21",
            "in-q22"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the statement and notice of intention to hold a lien is recorded"
            }
          ],
          "mayChangeIf": "a credit is given and recorded as IC 32-28-3-6(c) requires"
        },
        {
          "id": "in-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a credit is given whose terms are in writing, that was executed by the lienholder and all owners of record, and that was recorded in the same manner as the original statement and notice of intention to hold a lien not later than one year after that statement and notice was recorded",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Not later than one (1) year after the expiration of the credit"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "in-q19",
            "in-q21",
            "in-q23",
            "in-q24",
            "in-q25",
            "in-q26",
            "in-q27",
            "in-q28",
            "in-q29",
            "in-q30"
          ]
        },
        {
          "id": "in-enforcement-2",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After the owner of the property, or any person or corporation having an interest in it, including a mortgagee or a lienholder, gives the owner or holder of the lien written notice to file an action to foreclose the lien",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "An action to foreclose the lien filed in the county where the property is located not later than thirty (30) days after the lienholder receives the notice"
          },
          "consequence": "If the action is not filed within that time, the lien is void, although the claim may still be collected as other claims are collected by law.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "in-q31",
            "in-q32",
            "in-q33",
            "in-q34"
          ]
        }
      ],
      "residential": [
        {
          "text": "A lien for material or labor in original construction does not attach to real estate bought by an innocent purchaser for value, without notice, of a single or double family dwelling for the purchaser's occupancy, unless the notice of intention to hold the lien is recorded before the deed by which the purchaser takes title.",
          "quoteIds": [
            "in-q35"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the statement and notice of intention to hold a lien is recorded",
          "input": "Notice of intention to hold a lien recorded on",
          "hint": "Leave empty if no statement and notice of intention to hold a lien has been recorded."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "in-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "KS",
      "name": "Kansas",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "K.S.A. 60-1101 to 60-1111",
      "statuteUrl": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
      "summary": "Kansas gives a person claiming under a contract with the owner four months after the date material, equipment or supplies were last furnished or labor last performed to file a lien statement with the clerk of the district court, and a supplier, subcontractor or other person under an agreement with the contractor, a subcontractor or an owner contractor three months. An action to foreclose the lien is brought within one year from filing the lien statement, or within one year from the maturity of a promissory note attached to the lien statement in place of an itemized statement.",
      "effectiveOrAmended": "K.S.A. 60-1102 and 60-1103 were last amended by L. 2005, ch. 101. K.S.A. 60-1103a was enacted by L. 1986, ch. 217, and 60-1103b was last amended by L. 2005, chs. 101 and 186. K.S.A. 60-1105 dates from L. 1963, ch. 303.",
      "quotes": [
        {
          "id": "ks-q1",
          "text": "(b) A lien for the furnishing of labor, equipment, materials or supplies for the improvement of residential property may be claimed pursuant to K.S.A. 60-1103 and amendments thereto only if the claimant has: (1) Mailed to any one of the owners of the property a warning statement conforming with this section; or (2) in the claimant's possession a copy of a statement signed and dated by any one owner of the property stating that the general contractor or the claimant had given the warning statement conforming with this section to one such owner of the property.",
          "citation": "K.S.A. 60-1103a(b)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html",
          "sourceId": "ks-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q2",
          "text": "(a) As used in this section, \"improvement of residential property\" means: (1) Improvement of a preexisting structure in which the owner resides at the time the claimant first furnishes labor, equipment, material or supplies and which is not used or intended for use as a residence for more than two families or for commercial purposes or improvement or construction of any addition, garage, fence, swimming pool, outbuilding or other improvement appurtenant to such a structure; or (2) any construction upon real property which is (A) owned or acquired by an individual at the time the claimant first furnishes labor, equipment, material or supplies; (B) intended to become and does become the principal personal residence of that individual upon completion; and (C) not used or intended for use as a residence for more than two families or for commercial purposes.",
          "citation": "K.S.A. 60-1103a(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html",
          "sourceId": "ks-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q3",
          "text": "(d) The warning statement provided for by this section shall not be required if the claimant's total claim does not exceed $250.",
          "citation": "K.S.A. 60-1103a(d)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003a.html",
          "sourceId": "ks-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q4",
          "text": "(b) A lien for the furnishing of labor, equipment, materials or supplies for the construction of new residential property may be claimed pursuant to K.S.A. 60-1101 or 60-1103 and amendments thereto after the passage of title to such new residential property to a good faith purchaser for value only if the claimant has filed a notice of intent to perform prior to the recording of the deed effecting passage of title to such new residential property.",
          "citation": "K.S.A. 60-1103b(b)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html",
          "sourceId": "ks-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q5",
          "text": "Such notice shall be filed in the office of the clerk of the district court of the county where the property is located.",
          "citation": "K.S.A. 60-1103b(b)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html",
          "sourceId": "ks-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q6",
          "text": "(a) As used in this section, \"new residential property\" means a new structure which is constructed for use as a residence and which is not used or intended for use as a residence for more than two families or for commercial purposes.",
          "citation": "K.S.A. 60-1103b(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html",
          "sourceId": "ks-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q7",
          "text": "(f) Notwithstanding the requirements of subsections (d) and (e), a notice of intent to perform shall be of no further force or effect after the expiration of 18 months from the date of filing the same, unless within such time the claimant has filed a lien pursuant to K.S.A. 60-1101 and 60-1103, and amendments thereto.",
          "citation": "K.S.A. 60-1103b(f)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003b.html",
          "sourceId": "ks-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q8",
          "text": "(a) Filing. Any person claiming a lien on real property, under the provisions of K.S.A. 60-1101, and amendments thereto, shall file with the clerk of the district court of the county in which property is located, within four months after the date material, equipment or supplies, used or consumed was last furnished or last labor performed under the contract a verified statement showing: (1) The name of the owner, (2) the name and address sufficient for service of process of the claimant, (3) a description of the real property, (4) a reasonably itemized statement and the amount of the claim, but if the amount of the claim is evidenced by a written instrument, or if a promissory note has been given for the same, a copy thereof may be attached to the claim in lieu of the itemized statement.",
          "citation": "K.S.A. 60-1102(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
          "sourceId": "ks-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q9",
          "text": "(c) Notwithstanding subsection (a), a lien for the furnishing of labor, equipment, materials or supplies on property other than residential property may be claimed pursuant to this section within five months only if the claimant has filed a notice of extension within four months since last furnishing labor, equipment, materials or supplies to the job site.",
          "citation": "K.S.A. 60-1102(c)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
          "sourceId": "ks-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q10",
          "text": "Such notice shall be filed in the office of the district court of the county where such property is located and shall be mailed by certified and regular mail to the owner.",
          "citation": "K.S.A. 60-1102(c)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
          "sourceId": "ks-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q11",
          "text": "(a) Procedure. Any supplier, subcontractor or other person furnishing labor, equipment, material or supplies, used or consumed at the site of the property subject to the lien, under an agreement with the contractor, subcontractor or owner contractor may obtain a lien for the amount due in the same manner and to the same extent as the original contractor except that: (1) The lien statement must state the name of the contractor and be filed within three months after the date supplies, material or equipment was last furnished or labor performed by the claimant; (2) if a warning statement is required to be given pursuant to K.S.A. 60-1103a, and amendments thereto, there shall be attached to the lien statement the affidavit of the supplier or subcontractor that such warning statement was properly given; and (3) a notice of intent to perform, if required pursuant to K.S.A. 60-1103b, and amendments thereto, must have been filed as provided by that section.",
          "citation": "K.S.A. 60-1103(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
          "sourceId": "ks-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q12",
          "text": "(e) Notwithstanding subsection (a)(1), a lien for the furnishing of labor, equipment, materials or supplies on property other than residential property may be claimed pursuant to this section, and amendments thereto, within five months only if the claimant has filed a notice of extension within three months since last furnishing labor, equipment, materials or supplies to the job site.",
          "citation": "K.S.A. 60-1103(e)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
          "sourceId": "ks-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q13",
          "text": "Such notice shall be filed in the office of the clerk of the district court of the county where such property is located and shall be mailed by certified and regular mail to the general contractor or construction manager and a copy to the owner by regular mail, if known.",
          "citation": "K.S.A. 60-1103(e)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
          "sourceId": "ks-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q14",
          "text": "The claimant shall (1) cause a copy of the lien statement to be served personally upon any one owner, any holder of a recorded equitable interest and any party obligated to pay the lien in the manner provided by K.S.A. 60-304, and amendments thereto, for the service of summons within the state, or by K.S.A. 60-308, and amendments thereto, for service outside of the state, (2) mail a copy of the lien statement to any one owner of the property, any holder of a recorded equitable interest and to any party obligated to pay the same by restricted mail or (3) if the address of any one owner or such party is unknown and cannot be ascertained with reasonable diligence, post a copy of the lien statement in a conspicuous place on the premises.",
          "citation": "K.S.A. 60-1103(c)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
          "sourceId": "ks-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q15",
          "text": "(a) Limitations. An action to foreclose a lien under this article shall be brought within one year from the time of filing the lien statement, but if a promissory note has been attached to the lien statement in lieu of an itemized statement, the action shall be commenced within one year from the maturity of said note.",
          "citation": "K.S.A. 60-1105(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0005.html",
          "sourceId": "ks-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q16",
          "text": "(d) As used in this section and K.S.A. 60-1103, and amendments thereto, \"residential property\" means a structure which is constructed for use as a residence and which is not used or intended for use as a residence for more than two families.",
          "citation": "K.S.A. 60-1102(d)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0002.html",
          "sourceId": "ks-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q17",
          "text": "No action to foreclose any lien may proceed or be entered against residential real property in this state unless the holder of a recorded equitable interest was served with notice in accordance with the provisions of this subsection.",
          "citation": "K.S.A. 60-1103(c)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_011_0003.html",
          "sourceId": "ks-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q18",
          "text": "(a) Computing time. The following provisions apply in computing any time period specified in this chapter, in any local rule or court order or in any statute or administrative rule or regulation that does not specify a method of computing time.",
          "citation": "K.S.A. 60-206(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_002_0006.html",
          "sourceId": "ks-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q19",
          "text": "(1) Period stated in days or a longer unit. When the period is stated in days or a longer unit of time: (A) Exclude the day of the event that triggers the period; (B) count every day, including intermediate Saturdays, Sundays and legal holidays; and (C) include the last day of the period, but if the last day is a Saturday, Sunday or legal holiday, the period continues to run until the end of the next day that is not a Saturday, Sunday or legal holiday.",
          "citation": "K.S.A. 60-206(a)(1)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_002_0006.html",
          "sourceId": "ks-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q20",
          "text": "(a) On and after January 1, 2006, the following days are declared to be legal public holidays and are to be observed as such: New Year's Day, January 1; Martin Luther King, Jr. Day, the third Monday in January; President's Day, the third Monday in February; Memorial Day, the last Monday in May; Independence Day, July 4; Labor Day, the first Monday in September; Columbus Day, the second Monday in October; Veterans' Day, the eleventh day in November; Thanksgiving Day, the fourth Thursday in November; Christmas Day, December 25.",
          "citation": "K.S.A. 35-107(a)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch35/035_001_0007.html",
          "sourceId": "ks-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q21",
          "text": "\"Legal holiday\" means any day declared a holiday by the president of the United States, the congress of the United States or the legislature of this state, or any day observed as a holiday by order of the Kansas supreme court.",
          "citation": "K.S.A. 60-206(a)(6)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_002_0006.html",
          "sourceId": "ks-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ks-q22",
          "text": "(3) Inaccessibility of the clerk's office. Unless the court orders otherwise, if the clerk's office is inaccessible: (A) On the last day for filing under subsection (a)(1), then the time for filing is extended to the first accessible day that is not a Saturday, Sunday or legal holiday; or (B) during the last hour for filing under subsection (a)(2), then the time for filing is extended to the same time on the first accessible day that is not a Saturday, Sunday or legal holiday.",
          "citation": "K.S.A. 60-206(a)(3)",
          "url": "https://ksrevisor.gov/statutes/chapters/ch60/060_002_0006.html",
          "sourceId": "ks-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ks-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the improvement of residential property as K.S.A. 60-1103a defines it, where the claimant’s total claim exceeds $250",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Mailed before the lien is claimed under K.S.A. 60-1103"
          },
          "consequence": "A lien may be claimed only if the claimant has mailed the warning statement, or holds a statement signed and dated by an owner that the general contractor or the claimant gave it.",
          "recipients": [
            "Any one of the owners of the property"
          ],
          "delivery": "Mailed.",
          "quoteIds": [
            "ks-q1",
            "ks-q2",
            "ks-q3"
          ]
        },
        {
          "id": "ks-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the construction of new residential property, for a lien claimed after title passes to a good faith purchaser for value",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Filed before the recording of the deed effecting passage of title to the new residential property"
          },
          "consequence": "The notice of intent to perform has no further force or effect 18 months after it is filed, unless the claimant has filed a lien within that time.",
          "recipients": null,
          "delivery": "Filed in the office of the clerk of the district court of the county where the property is located.",
          "quoteIds": [
            "ks-q4",
            "ks-q5",
            "ks-q6",
            "ks-q7"
          ]
        },
        {
          "id": "ks-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ks-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "material, equipment or supplies, used or consumed was last furnished or last labor performed under the contract"
            }
          ]
        },
        {
          "id": "ks-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "commercial",
          "branch": "other",
          "branchNote": "If the claimant has filed a notice of extension within four months since last furnishing labor, equipment, materials or supplies to the job site",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within five months"
          },
          "consequence": null,
          "recipients": null,
          "delivery": "The notice of extension is filed in the office of the district court and mailed by certified and regular mail to the owner.",
          "quoteIds": [
            "ks-q9",
            "ks-q10"
          ]
        },
        {
          "id": "ks-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ks-q11"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "supplies, material or equipment was last furnished or labor performed by the claimant"
            }
          ]
        },
        {
          "id": "ks-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "other",
          "branchNote": "If the claimant has filed a notice of extension within three months since last furnishing labor, equipment, materials or supplies to the job site",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within five months"
          },
          "consequence": null,
          "recipients": null,
          "delivery": "The notice of extension is filed with the clerk of the district court, mailed by certified and regular mail to the general contractor or construction manager, and a copy mailed to the owner by regular mail, if known.",
          "quoteIds": [
            "ks-q12",
            "ks-q13"
          ]
        },
        {
          "id": "ks-service-0",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "When the lien is filed, with no number of days stated"
          },
          "consequence": null,
          "recipients": [
            "Any one owner",
            "Any holder of a recorded equitable interest",
            "Any party obligated to pay the lien"
          ],
          "delivery": "Served personally as a summons is served, or mailed by restricted mail, or, if the address of any one owner or such party cannot be ascertained with reasonable diligence, posted in a conspicuous place on the premises.",
          "quoteIds": [
            "ks-q14"
          ]
        },
        {
          "id": "ks-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ks-q15"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien statement is filed"
            }
          ],
          "mayChangeIf": "a promissory note has been attached to the lien statement in lieu of an itemized statement"
        }
      ],
      "residential": [
        {
          "text": "No action to foreclose any lien may proceed against residential real property unless the holder of a recorded equitable interest was served with notice as K.S.A. 60-1103(c) provides.",
          "quoteIds": [
            "ks-q17"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means a structure constructed for use as a residence and not used or intended for use as a residence for more than two families.",
        "quoteIds": [
          "ks-q16"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ks-q18",
            "ks-q19"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ks-q19"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ks-q20",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr. Day",
            "quoteId": "ks-q20",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "President's Day",
            "quoteId": "ks-q20",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "ks-q20",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "ks-q20",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "ks-q20",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "ks-q20",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "ks-q20",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ks-q20",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "ks-q20",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ks-q21",
          "ks-q20"
        ],
        "closure": {
          "clause": "for filing on which the clerk’s office is inaccessible, unless the court orders otherwise",
          "place": "the clerk’s office",
          "placeIs": "inaccessible",
          "quoteIds": [
            "ks-q22"
          ]
        }
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien statement is filed",
          "input": "Lien statement filed on",
          "hint": "Leave empty if no lien statement has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ks-0",
        "ks-1",
        "ks-2",
        "ks-3",
        "ks-4",
        "ks-5",
        "ks-6"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "LA",
      "name": "Louisiana",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "La. R.S. 9:4801 to 9:4855",
      "statuteUrl": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
      "summary": "Louisiana gives a person granted a privilege or a claim and privilege sixty days after the filing of a notice of termination of the work, or after the substantial completion or abandonment of the work if no notice of termination is filed, to file a statement of the claim or privilege, except where a notice of contract is properly and timely filed or a residential notice of nonpayment is given. The claim or privilege is extinguished if no action is instituted within one year after the statement is filed.",
      "effectiveOrAmended": "R.S. 9:4822 and 9:4823 were amended by Acts 2019, No. 325. Code of Civil Procedure article 5059 was amended by Acts 2025, No. 250, and R.S. 1:55 by Acts 2025, No. 305.",
      "quotes": [
        {
          "id": "la-q1",
          "text": "A. Except as otherwise provided in Subsections B, C, and D of this Section, a person granted a privilege under R.S. 9:4801 or a claim and privilege under R.S. 9:4802 shall file a statement of his claim or privilege no later than sixty days after: (1) The filing of a notice of termination of the work. (2) The substantial completion or abandonment of the work, if a notice of termination is not filed.",
          "citation": "La. R.S. 9:4822(A)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q2",
          "text": "A. A privilege provided by R.S. 9:4801, a claim against the owner and the privilege securing it provided by R.S. 9:4802, or a claim against the contractor provided by R.S. 9:4802 is extinguished if any of the following occurs: (1) The claimant or holder of the privilege does not preserve it as required by R.S. 9:4822. (2) The claimant or holder of the privilege does not institute an action against the owner for the enforcement of the claim or privilege within one year after filing the statement of claim or privilege to preserve it. (3) The obligation that it secures is extinguished.",
          "citation": "La. R.S. 9:4823(A)",
          "url": "https://web.archive.org/web/20241016005844id_/https://legis.la.gov/Legis/Law.aspx?p=y&d=108063",
          "sourceId": "la-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2024-10-16"
        },
        {
          "id": "la-q3",
          "text": "D. If before expiration of the period provided in Subsection A of this Section and at least ten days before filing his statement of claim or privilege a person granted a privilege under R.S. 9:4801(3) or (4), or a claim and privilege under R.S. 9:4802, in connection with a residential work for which a timely notice of contract was not filed gives notice of nonpayment to the owner, setting forth the amount and nature of the obligation giving rise to the claim and privilege, then the period in which the person is permitted to file his statement of claim or privilege shall expire seventy days after: (1) The filing of a notice of termination of the work. (2) The substantial completion or abandonment of the work, if a notice of termination is not filed.",
          "citation": "La. R.S. 9:4822(D)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q4",
          "text": "B. If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811, a person to whom a claim and privilege is granted by R.S. 9:4802 shall file a statement of his claim or privilege and deliver to the owner, if his address is given in the notice of contract, a copy of the statement of claim or privilege, no later than: (1) Thirty days after the filing of a notice of termination of the work. (2) Six months after the substantial completion or abandonment of the work, if a notice of termination is not filed.",
          "citation": "La. R.S. 9:4822(B)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q5",
          "text": "C. A general contractor to whom a privilege is granted by R.S. 9:4801, and whose privilege has been preserved in the manner provided by R.S. 9:4811, shall file a statement of his privilege no later than: (1) Sixty days after the filing of a notice of termination of the work. (2) Seven months after the substantial completion or abandonment of the work, if a notice of termination is not filed.",
          "citation": "La. R.S. 9:4822(C)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q6",
          "text": "(3) Shall certify the occurrence of one or more of the following: (a) The work has been substantially completed. (b) The work has been abandoned by the owner. (c) The general contractor is in default under the terms of the contract. (d) The contract with the general contractor has terminated.",
          "citation": "La. R.S. 9:4822(E)(3)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q7",
          "text": "F. If the work has been substantially completed or has been abandoned by the owner, the owner shall file a notice of termination of the work no later than ten days after receipt of a request for its filing from the general contractor.",
          "citation": "La. R.S. 9:4822(F)",
          "url": "https://web.archive.org/web/20251213223250id_/https://legis.la.gov/legis/law.aspx?d=108062",
          "sourceId": "la-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-13"
        },
        {
          "id": "la-q8",
          "text": "A. In computing a period of time allowed or prescribed by law or by order of court, the date of the act, event, or default from which the period begins to run is not included.",
          "citation": "La. Code Civ. Proc. art. 5059(A)",
          "url": "https://web.archive.org/web/20260624164838id_/https://legis.la.gov/Legis/Law.aspx?d=112147",
          "sourceId": "la-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-24"
        },
        {
          "id": "la-q9",
          "text": "The last day of the period is included, unless it is a legal holiday, in which event the period runs until the end of the next day that is not a legal holiday.",
          "citation": "La. Code Civ. Proc. art. 5059(A)",
          "url": "https://web.archive.org/web/20260624164838id_/https://legis.la.gov/Legis/Law.aspx?d=112147",
          "sourceId": "la-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-24"
        },
        {
          "id": "la-q10",
          "text": "(3) Only the enumerated holidays in Paragraph (1) of this Subsection, days of closure under Paragraph (2) of this Subsection, Mardi Gras only in those parishes in which the governing authority of the parish declares a holiday under authority of Paragraph (A)(3) of this Section, and all Saturdays and Sundays shall be considered as legal holidays for the purposes of Code of Civil Procedure Article 5059.",
          "citation": "La. R.S. 1:55(E)(3)",
          "url": "https://web.archive.org/web/20260615050952id_/https://legis.la.gov/Legis/Law.aspx?d=74097",
          "sourceId": "la-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-15"
        },
        {
          "id": "la-q11",
          "text": "(2) If an emergency situation develops which, in the judgment of the clerk of court, renders it hazardous or otherwise unsafe for employees of the office of the clerk to continue in the performance of their official duties or for the general public to conduct business with the clerk's office, the clerk, with prior approval from the clerk's chief judge or other person authorized to exercise his authority, may order the closing of his office for the duration of the hazardous or unsafe condition.",
          "citation": "La. R.S. 1:55(E)(2)",
          "url": "https://web.archive.org/web/20260615050952id_/https://legis.la.gov/Legis/Law.aspx?d=74097",
          "sourceId": "la-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-15"
        }
      ],
      "rules": [
        {
          "id": "la-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q1",
            "la-q2"
          ]
        },
        {
          "id": "la-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "In connection with a residential work for which a timely notice of contract was not filed",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before the period of Subsection A expires and at least ten days before filing the statement of claim or privilege"
          },
          "consequence": "If the notice of nonpayment is given, the period to file the statement of claim or privilege expires seventy days after the filing of a notice of termination of the work, or after the substantial completion or abandonment of the work if a notice of termination is not filed.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "la-q3"
          ]
        },
        {
          "id": "la-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q1"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the work is substantially completed or abandoned, if a notice of termination is not filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q4"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the work is substantially completed or abandoned, if a notice of termination is not filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a general contractor whose privilege has been preserved in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 7
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q5"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the work is substantially completed or abandoned, if a notice of termination is not filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If, before the period of Subsection A expires and at least ten days before filing the statement of claim or privilege, notice of nonpayment is given to the owner in connection with a residential work for which a timely notice of contract was not filed",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 70
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q3"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the work is substantially completed or abandoned, if a notice of termination is not filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a notice of termination of the work is filed",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q1"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of termination of the work is filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-5",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q4"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of termination of the work is filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-6",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a general contractor whose privilege has been preserved in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q5"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of termination of the work is filed"
            }
          ]
        },
        {
          "id": "la-lien-filing-7",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If, before the period of Subsection A expires and at least ten days before filing the statement of claim or privilege, notice of nonpayment is given to the owner in connection with a residential work for which a timely notice of contract was not filed",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 70
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q3"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of termination of the work is filed"
            }
          ]
        },
        {
          "id": "la-service-0",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner, if his address is given in the notice of contract"
          ],
          "delivery": null,
          "quoteIds": [
            "la-q4"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the work is substantially completed or abandoned, if a notice of termination is not filed"
            }
          ]
        },
        {
          "id": "la-service-1",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner, if his address is given in the notice of contract"
          ],
          "delivery": null,
          "quoteIds": [
            "la-q4"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a notice of termination of the work is filed"
            }
          ]
        },
        {
          "id": "la-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the claim or privilege is extinguished.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "la-q2"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the statement of claim or privilege is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "A notice of termination of the work certifies that the work has been substantially completed, that it has been abandoned by the owner, that the general contractor is in default under the terms of the contract, or that the contract with the general contractor has terminated.",
          "quoteIds": [
            "la-q6"
          ]
        },
        {
          "text": "If the work has been substantially completed or abandoned by the owner, the owner files a notice of termination of the work no later than ten days after receiving a request from the general contractor.",
          "quoteIds": [
            "la-q7"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "la-q8"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "la-q9",
            "la-q10"
          ]
        },
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "la-q10"
        ],
        "closure": {
          "clause": "on which the clerk of court’s office is closed for a hazardous or unsafe condition under R.S. 1:55(E)(2), a day that statute treats as a legal holiday",
          "place": "the clerk of court’s office",
          "quoteIds": [
            "la-q10",
            "la-q11"
          ]
        }
      },
      "eventWording": [
        {
          "event": "completion",
          "clause": "the work is substantially completed or abandoned",
          "input": "Work substantially completed or abandoned on",
          "hint": null
        },
        {
          "event": "notice-of-completion",
          "clause": "a notice of termination of the work is filed",
          "input": "Notice of termination of the work filed on",
          "hint": "Leave empty if no notice of termination of the work has been filed."
        },
        {
          "event": "lien-recorded",
          "clause": "the statement of claim or privilege is filed",
          "input": "Statement of claim or privilege filed on",
          "hint": "Leave empty if no statement of claim or privilege has been filed."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "la-0",
        "la-1",
        "la-2",
        "la-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MA",
      "name": "Massachusetts",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Mass. Gen. Laws ch. 254",
      "statuteUrl": "https://web.archive.org/web/20260305204026id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2",
      "summary": "In Massachusetts a contractor with a written contract with the owner, or with a person acting for, on behalf of, or with the consent of the owner, and a subcontractor or supplier with a written contract with a contractor or subcontractor, files or records a notice of contract no later than the earliest of 60 days after a notice of substantial completion is filed or recorded, 90 days after a notice of termination is filed or recorded, and 90 days after the contractor, or anyone claiming by, through or under the contractor, last performed or furnished labor or materials. A statement of the amount due follows no later than the earliest of 90, 120 and 120 days after the same three events, and a civil action to enforce the lien is commenced within 90 days after that statement is filed.",
      "effectiveOrAmended": null,
      "quotes": [
        {
          "id": "ma-q1",
          "text": "A person entering into a written contract with the owner of any interest in real property, or with any person acting for, on behalf of, or with the consent of such owner for the whole or part of the erection, alteration, repair or removal of a building, structure, or other improvement to real property, or for furnishing material or rental equipment, appliances, or tools therefor, shall have a lien upon such real property, land, building, structure or improvement owned by the party with whom or on behalf of whom the contract was entered into, as appears of record on the date when notice of said contract is filed or recorded in the registry of deeds for the county or district where such land lies, to secure the payment of all labor, including construction management and general contractor services, and material or rental equipment, appliances, or tools which shall be furnished by virtue of said contract.",
          "citation": "Mass. Gen. Laws ch. 254, § 2",
          "url": "https://web.archive.org/web/20260305204026id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2",
          "sourceId": "ma-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-05"
        },
        {
          "id": "ma-q2",
          "text": "Upon filing or recording a notice, as hereinbefore provided, and giving actual notice to the owner of such filing, the subcontractor shall have a lien upon such real property, land, building, structure or improvement owned by the party who entered into the original contract as appears of record at the time of such filing, to secure the payment of all labor and material and rental equipment, appliances or tools or professional services which he is to furnish or has furnished for the building or structure or other improvement, regardless of the amount stated in the notice of contract.",
          "citation": "Mass. Gen. Laws ch. 254, § 4",
          "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
          "sourceId": "ma-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-08"
        },
        {
          "id": "ma-q3",
          "text": "A person to whom a debt is due for personal labor performed in the erection, alteration, repair or removal of a building or structure upon land or improvement or alteration to real property, by virtue of an agreement with, or by consent of, the owner of such building or structure, or of a person having authority from or rightfully acting for such owner in procuring or furnishing such labor, shall, under the provisions of this chapter, other than section four, have a lien upon such building or structure and upon such interest in such real property, land, building, structure, or improvement owned by the party authorizing or consenting to said work, for not more than thirty days' work actually performed for the ninety days next prior to his filing a statement as provided in section eight.",
          "citation": "Mass. Gen. Laws ch. 254, § 1",
          "url": "https://web.archive.org/web/20251112194744id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section1",
          "sourceId": "ma-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-12"
        },
        {
          "id": "ma-q4",
          "text": "If the person claiming a lien under this section has no direct contractual relationship with the original contractor, except for liens for labor by persons defined in section one of this chapter, the amount of such lien shall not exceed the amount due or to become due under the subcontract between the original contractor and the subcontractor whose work includes the work of the person claiming the lien as of the date such person files his notice of contract, unless the person claiming such lien has, within thirty days of commencement of his performance, given written notice of identification by certified mail return receipt requested to the original contractor in substantially the following form:",
          "citation": "Mass. Gen. Laws ch. 254, § 4",
          "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
          "sourceId": "ma-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-08"
        },
        {
          "id": "ma-q5",
          "text": "Such person may file or record the notice of contract at any time after execution of the written contract whether or not the date for performance stated in such written contract has passed and whether or not the work under such written contract has been performed, but not later than the earliest of: (i) sixty days after filing or recording of the notice of substantial completion under section two A; or (ii) ninety days after filing or recording of the notice of termination under section two B; or (iii) ninety days after such person or any person by, through or under him last performed or furnished labor or materials or both labor and materials.",
          "citation": "Mass. Gen. Laws ch. 254, § 2",
          "url": "https://web.archive.org/web/20260305204026id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2",
          "sourceId": "ma-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-05"
        },
        {
          "id": "ma-q6",
          "text": "Whoever furnishes labor, including subcontractor construction management services, or who furnishes material, or both labor and material, or furnishes rental equipment, appliances or tools, or who performs professional services, under a written contract with a contractor, or with a subcontractor of such contractor, may file or record in the registry of deeds for the county or district where such land lies a notice of his contract substantially in the following form:",
          "citation": "Mass. Gen. Laws ch. 254, § 4",
          "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
          "sourceId": "ma-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-08"
        },
        {
          "id": "ma-q7",
          "text": "Such person may file or record the notice of contract at any time after execution of the written contract whether or not the date for performance stated in such written contract has passed and whether or not the work under such contract has been performed, but not later than the earliest of: (i) sixty days after filing or recording the notice of substantial completion under section two A; or (ii) ninety days after filing or recording of the notice of termination under section two B; or (iii) ninety days after the last day a person entitled to enforce a lien under section two or anyone claiming by, through or under him performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services.",
          "citation": "Mass. Gen. Laws ch. 254, § 4",
          "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
          "sourceId": "ma-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-08"
        },
        {
          "id": "ma-q8",
          "text": "Liens under sections two and four shall be dissolved unless the contractor, subcontractor, or some person claiming by, through or under them, shall, not later than the earliest of: (i) ninety days after the filing or recording of the notice of substantial completion under section two A; (ii) one hundred and twenty days after the filing or recording of the notice of termination under section two B; or (iii) one hundred and twenty days after the last day a person, entitled to enforce a lien under section two or anyone claiming by, through or under him, performed or furnished labor or material or both labor and materials or furnished rental equipment, appliances or tools, file or record in the registry of deeds in the county or district where the land lies a statement, giving a just and true account of the amount due or to become due him, with all just credits, a brief description of the property, and the names of the owners set forth in the notice of contract.",
          "citation": "Mass. Gen. Laws ch. 254, § 8",
          "url": "https://web.archive.org/web/20260512182550id_/https://malegislature.gov/laws/generallaws/partiii/titleiv/chapter254/section8",
          "sourceId": "ma-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-12"
        },
        {
          "id": "ma-q9",
          "text": "A lien under section one shall be dissolved unless a like statement, giving the names of the owner of record at the time the work was performed or at the time of filing the statement, is filed or recorded in the appropriate registry of deeds within the ninety days provided in said section.",
          "citation": "Mass. Gen. Laws ch. 254, § 8",
          "url": "https://web.archive.org/web/20260512182550id_/https://malegislature.gov/laws/generallaws/partiii/titleiv/chapter254/section8",
          "sourceId": "ma-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-12"
        },
        {
          "id": "ma-q10",
          "text": "Such notice may also be filed by a person or his assignee, agent, authorized representative or third party beneficiary to whom amounts are due or for whose benefit amounts are computed and due for or on the basis of the labor of that person performing labor under a written contract with a contractor, or with a subcontractor of such contractor and the person filing such notice shall not be required to itemize the amount of the contract, the amount of pending changes in the contract, the amount of outstanding claims or the amount paid in such notice.",
          "citation": "Mass. Gen. Laws ch. 254, § 4",
          "url": "https://web.archive.org/web/20260508214619id_/https://malegislature.gov/Laws/GeneralLaws/Partiii/Titleiv/Chapter254/Section4",
          "sourceId": "ma-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-08"
        },
        {
          "id": "ma-q11",
          "text": "The lien shall be dissolved unless a civil action to enforce it is commenced within ninety days after the filing of the statement required by section eight.",
          "citation": "Mass. Gen. Laws ch. 254, § 11",
          "url": "https://web.archive.org/web/20260519042043id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section11",
          "sourceId": "ma-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-19"
        },
        {
          "id": "ma-q12",
          "text": "An attested copy of the complaint, which shall contain a brief description of the property sufficient to identify it, and a statement of the amount due, shall be filed in the registry of deeds and recorded as provided in section nine within thirty days of the commencement of the action, or such lien shall be dissolved.",
          "citation": "Mass. Gen. Laws ch. 254, § 5",
          "url": "https://web.archive.org/web/20251211162603id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section5",
          "sourceId": "ma-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-11"
        },
        {
          "id": "ma-q13",
          "text": "''Substantial completion'', that work under the written contract is sufficiently complete so that it can be occupied or utilized for its intended use.",
          "citation": "Mass. Gen. Laws ch. 254, § 2A",
          "url": "https://web.archive.org/web/20260605003204id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2A",
          "sourceId": "ma-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-05"
        },
        {
          "id": "ma-q14",
          "text": "Upon or after substantial completion of any contract subject to the provisions of section two, the owner and contractor shall execute and file or record in the appropriate registry of deeds a notice of substantial completion in substantially the following form:",
          "citation": "Mass. Gen. Laws ch. 254, § 2A",
          "url": "https://web.archive.org/web/20260605003204id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2A",
          "sourceId": "ma-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-05"
        },
        {
          "id": "ma-q15",
          "text": "A copy of such notice, indicating the date of filing or recording, shall be mailed by certified mail return receipt requested by the owner to every person who has filed a notice of contract under section four and by the contractor to every person who has entered into a written contract directly with the contractor and every person who has given written notice of identification to the contractor claiming by, through, or under him as provided in section four.",
          "citation": "Mass. Gen. Laws ch. 254, § 2A",
          "url": "https://web.archive.org/web/20260605003204id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2A",
          "sourceId": "ma-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-05"
        },
        {
          "id": "ma-q16",
          "text": "If, prior to the filing or recording in the registry of deeds and delivery of the copies of the notice of substantial completion described in section two A, any contract subject to the provisions of section two shall have been terminated, the owner shall execute and file or record in the appropriate registry of deeds a notice of termination in substantially the following form:",
          "citation": "Mass. Gen. Laws ch. 254, § 2B",
          "url": "https://web.archive.org/web/20260311020010id_/https://malegislature.gov/Laws/GeneralLaws/PartIII/TitleIV/Chapter254/Section2B",
          "sourceId": "ma-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-11"
        },
        {
          "id": "ma-q17",
          "text": "Except as otherwise provided, when the day or the last day for the performance of any act, including the making of any payment or tender of payment, authorized or required by statute or by contract, falls on Sunday or a legal holiday, the act may, unless it is specifically authorized or required to be performed on Sunday or on a legal holiday, be performed on the next succeeding business day.",
          "citation": "Mass. Gen. Laws ch. 4, § 9",
          "url": "https://web.archive.org/web/20260115181129id_/https://malegislature.gov/Laws/GeneralLaws/PartI/TitleI/Chapter4/Section9",
          "sourceId": "ma-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-01-15"
        },
        {
          "id": "ma-q18",
          "text": "Eighteenth, \"Legal holiday'' shall include January first, June nineteenth, July fourth, November eleventh, and Christmas Day, or the day following when any of said days occurs on Sunday, and the third Monday in January, the third Monday in February, the third Monday in April, the last Monday in May, the first Monday in September, the second Monday in October, and Thanksgiving Day.",
          "citation": "Mass. Gen. Laws ch. 4, § 7, cl. Eighteenth",
          "url": "https://web.archive.org/web/20260923215455id_/https://malegislature.gov/Laws/GeneralLaws/PartI/TitleI/Chapter4/Section7",
          "sourceId": "ma-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-23"
        },
        {
          "id": "ma-q19",
          "text": "\"Legal holiday'' shall also include, with respect to Suffolk county only, Evacuation Day, on March seventeenth, and Bunker Hill Day, on June seventeenth, or the day following when said days occur on Sunday; provided, however, that all state and municipal agencies, authorities, quasi-public entities or other offices located in Suffolk county shall be open for business and appropriately staffed on Evacuation Day, on March seventeenth, and Bunker Hill Day, on June seventeenth, and that section forty-five of chapter one hundred and forty-nine shall not apply to Evacuation Day, on March seventeenth, and Bunker Hill Day, on June seventeenth, or the day following when said days occur on Sunday.",
          "citation": "Mass. Gen. Laws ch. 4, § 7, cl. Eighteenth",
          "url": "https://web.archive.org/web/20260923215455id_/https://malegislature.gov/Laws/GeneralLaws/PartI/TitleI/Chapter4/Section7",
          "sourceId": "ma-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-23"
        }
      ],
      "rules": [
        {
          "id": "ma-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "Section 4 provides an optional notice of identification. A claimant with no direct contractual relationship with the original contractor that has not given one by certified mail, return receipt requested, within thirty days of commencing its performance has a lien no greater than the amount due or to become due under the subcontract between the original contractor and the subcontractor whose work includes its work, as of the date it files its notice of contract. This limit does not apply to liens for labor by persons defined in section 1.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q1",
            "ma-q2",
            "ma-q3",
            "ma-q4"
          ]
        },
        {
          "id": "ma-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q1",
            "ma-q5"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "such person or any person by, through or under him last performed or furnished labor or materials or both labor and materials"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of substantial completion is filed or recorded"
            }
          ],
          "mayChangeIf": "a notice of termination is filed or recorded under section two B",
          "mayChangeDirection": "earlier"
        },
        {
          "id": "ma-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q6",
            "ma-q7",
            "ma-q2"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of substantial completion is filed or recorded"
            }
          ],
          "mayChangeIf": "a notice of termination is filed or recorded under section two B",
          "mayChangeDirection": "earlier"
        },
        {
          "id": "ma-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 120
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "If the statement is not filed or recorded within that time, the lien under section 2 or 4 is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or material or both labor and materials or furnished rental equipment, appliances or tools"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of substantial completion is filed or recorded"
            }
          ],
          "mayChangeIf": "a notice of termination is filed or recorded under section two B",
          "mayChangeDirection": "earlier"
        },
        {
          "id": "ma-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a lien under section 1 for personal labor performed by virtue of an agreement with, or by consent of, the owner or a person having authority from or rightfully acting for the owner",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "A statement filed or recorded within the ninety days provided in section 1, for not more than thirty days of work actually performed in the ninety days before it is filed"
          },
          "consequence": "If the statement is not filed or recorded within the ninety days provided in section 1, the lien under section 1 is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q3",
            "ma-q9"
          ]
        },
        {
          "id": "ma-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who furnishes labor under a written contract with a contractor, or with a subcontractor of such contractor, and files a notice of contract under section 4",
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q6",
            "ma-q7",
            "ma-q10"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of substantial completion is filed or recorded"
            }
          ],
          "mayChangeIf": "a notice of termination is filed or recorded under section two B",
          "mayChangeDirection": "earlier"
        },
        {
          "id": "ma-lien-filing-5",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who furnishes labor under a written contract with a contractor, or with a subcontractor of such contractor, and has a lien under section 4",
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 120
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": "If the statement is not filed or recorded within that time, the lien under section 4 is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q6",
            "ma-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or material or both labor and materials or furnished rental equipment, appliances or tools"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of substantial completion is filed or recorded"
            }
          ],
          "mayChangeIf": "a notice of termination is filed or recorded under section two B",
          "mayChangeDirection": "earlier"
        },
        {
          "id": "ma-service-0",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Actual notice to the owner of the filing or recording of the notice of contract, with no period stated"
          },
          "consequence": "The subcontractor has its lien upon filing or recording the notice of contract and giving the owner actual notice of that filing.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ma-q2"
          ]
        },
        {
          "id": "ma-service-1",
          "stage": "service",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who furnishes labor under a written contract with a contractor, or with a subcontractor of such contractor, and files a notice of contract under section 4",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Actual notice to the owner of the filing or recording of the notice of contract, with no period stated"
          },
          "consequence": "The person has its lien under section 4 upon filing or recording the notice of contract and giving the owner actual notice of that filing.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ma-q6",
            "ma-q2"
          ]
        },
        {
          "id": "ma-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If no civil action to enforce the lien is commenced within that time, the lien is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the statement required by section eight is filed"
            }
          ]
        },
        {
          "id": "ma-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Once a civil action to enforce the lien is commenced",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "An attested copy of the complaint filed in the registry of deeds within thirty days of the commencement of the action"
          },
          "consequence": "If the attested copy is not filed and recorded within that time, the lien is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ma-q12"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Upon or after substantial completion, meaning the work under the written contract is sufficiently complete to be occupied or used for its intended use, the owner and contractor file or record a notice of substantial completion in the registry of deeds. The owner mails a copy by certified mail to every person who filed a notice of contract under section 4, and the contractor to every person with a written contract directly with it and every person who gave it a notice of identification.",
          "quoteIds": [
            "ma-q13",
            "ma-q14",
            "ma-q15"
          ]
        },
        {
          "text": "If the contract is terminated before a notice of substantial completion is filed or recorded and its copies delivered, the owner files or records a notice of termination in the registry of deeds.",
          "quoteIds": [
            "ma-q16"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": null,
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "ma-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "January first",
            "quoteId": "ma-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Third Monday in January",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Third Monday in February",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Third Monday in April",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 4,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Last Monday in May",
            "quoteId": "ma-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "June nineteenth",
            "quoteId": "ma-q18",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "July fourth",
            "quoteId": "ma-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "First Monday in September",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Second Monday in October",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "November eleventh",
            "quoteId": "ma-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ma-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": false,
            "modelNote": "Clause Eighteenth names Thanksgiving Day without a date. It is modeled as the fourth Thursday in November."
          },
          {
            "name": "Christmas Day",
            "quoteId": "ma-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": false,
            "modelNote": "Clause Eighteenth names Christmas Day without a date. It is modeled as December 25."
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ma-q18",
          "ma-q19"
        ],
        "holidaysNotModeled": [
          {
            "name": "Evacuation Day",
            "reason": "Mass. Gen. Laws ch. 4, § 7, cl. Eighteenth makes them legal holidays with respect to Suffolk county only"
          },
          {
            "name": "Bunker Hill Day",
            "reason": "Mass. Gen. Laws ch. 4, § 7, cl. Eighteenth makes them legal holidays with respect to Suffolk county only"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services",
          "input": "Last day labor or materials were furnished to the project",
          "hint": "Sections 4 and 8 count from the last day a person who may enforce a lien under section 2, or anyone claiming by, through or under that person, performed or furnished labor or materials."
        },
        {
          "event": "notice-of-completion",
          "clause": "a notice of substantial completion is filed or recorded",
          "input": "Notice of substantial completion filed or recorded on",
          "hint": "Leave empty if no notice of substantial completion under section 2A has been filed or recorded."
        },
        {
          "event": "lien-recorded",
          "clause": "the statement required by section eight is filed",
          "input": "Section 8 statement filed on",
          "hint": "Leave empty if no statement under section 8 has been filed or recorded."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ma-0",
        "ma-1",
        "ma-2",
        "ma-3",
        "ma-4",
        "ma-5",
        "ma-6",
        "ma-7",
        "ma-8",
        "ma-9"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MD",
      "name": "Maryland",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Md. Code, Real Prop. §§ 9-101 to 9-114",
      "statuteUrl": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-105&enactments=false",
      "summary": "In Maryland a person claiming a lien files proceedings in the circuit court to establish it within 180 days after the work has been finished or the materials furnished, and the right to enforce an established lien expires one year after the petition to establish it was first filed. A subcontractor, meaning anyone with a contract with someone other than the owner or the owner’s agent, first gives the owner written notice of an intention to claim a lien within 120 days after doing the work or furnishing the materials.",
      "effectiveOrAmended": null,
      "quotes": [
        {
          "id": "md-q1",
          "text": "(a) (1) A subcontractor doing work or furnishing materials or both for or about a building other than a single family dwelling being erected on the owner’s land for his own residence is not entitled to a lien under this subtitle unless, within 120 days after doing the work or furnishing the materials, the subcontractor gives written notice of an intention to claim a lien substantially in the form specified in subsection (b) of this section.",
          "citation": "Md. Code, Real Prop. § 9-104(a)(1)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q2",
          "text": "(2) A subcontractor doing work or furnishing materials or both for or about a single family dwelling being erected on the owner’s land for his own residence is not entitled to a lien under this subtitle unless, within 120 days after doing work or furnishing materials for or about that single family dwelling, the subcontractor gives written notice of an intention to claim a lien in accordance with subsection (a)(1) of this section and the owner has not made full payment to the contractor prior to receiving the notice.",
          "citation": "Md. Code, Real Prop. § 9-104(a)(2)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q3",
          "text": "(g) “Subcontractor” means a person who has a contract with anyone except the owner or his agent.",
          "citation": "Md. Code, Real Prop. § 9-101(g)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-101&enactments=false",
          "sourceId": "md-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q4",
          "text": "(c) The notice is effective if given by registered or certified mail, return receipt requested, or personally delivered to the owner by the claimant or his agent.",
          "citation": "Md. Code, Real Prop. § 9-104(c)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q5",
          "text": "(d) If there is more than one owner, the subcontractor may comply with this section by giving the notice to any of the owners.",
          "citation": "Md. Code, Real Prop. § 9-104(d)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q6",
          "text": "(e) If notice cannot be given on account of absence or other causes, the subcontractor, or his agent, in the presence of a competent witness and within 120 days, may place the notice on the door or other front part of the building.",
          "citation": "Md. Code, Real Prop. § 9-104(e)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q7",
          "text": "(d) “Contractor” means a person who has a contract with an owner.",
          "citation": "Md. Code, Real Prop. § 9-101(d)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-101&enactments=false",
          "sourceId": "md-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q8",
          "text": "(a) In order to establish a lien under this subtitle, a person entitled to a lien shall file proceedings in the circuit court for the county where the land or any part of the land is located within 180 days after the work has been finished or the materials furnished.",
          "citation": "Md. Code, Real Prop. § 9-105(a)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-105&enactments=false",
          "sourceId": "md-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q9",
          "text": "The right to enforce any lien established under this subtitle expires at the end of one year from the day on which the petition to establish the lien was first filed.",
          "citation": "Md. Code, Real Prop. § 9-109",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-109&enactments=false",
          "sourceId": "md-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q10",
          "text": "If such petition is filed within the one-year period, the right to a lien or the lien, or any bond given to obtain a release of lien, shall remain in full force and effect until the conclusion of the enforcement proceedings and thereafter only in accordance with the decree entered in the case.",
          "citation": "Md. Code, Real Prop. § 9-109",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-109&enactments=false",
          "sourceId": "md-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q11",
          "text": "(3) Notwithstanding any other provision of this section to the contrary, the lien of the subcontractor against a single family dwelling being erected on the land of the owner for his own residence shall not exceed the amount by which the owner is indebted under the contract at the time the notice is given.",
          "citation": "Md. Code, Real Prop. § 9-104(f)(3)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-104&enactments=false",
          "sourceId": "md-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q12",
          "text": "(a) In computing a period of time described in a statute, the day of the act, event, or default after which the designated period of time begins to run may not be included.",
          "citation": "Md. Code, Gen. Prov. § 1-302(a)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-302&enactments=false",
          "sourceId": "md-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q13",
          "text": "(b) The last day of the period of time computed under subsection (a) of this section shall be included unless: (1) it is a Sunday or legal holiday, in which case the period runs until the end of the next day that is not a Sunday or legal holiday; or (2) the act to be done is the filing of a paper in court and the office of the clerk of the court is not open on the last day of the period of time, or is closed for a part of a day, in which case the period runs until the end of the next day that is not a Saturday, Sunday, legal holiday, or day on which the office is not open the entire day during ordinary business hours.",
          "citation": "Md. Code, Gen. Prov. § 1-302(b)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-302&enactments=false",
          "sourceId": "md-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q14",
          "text": "(a) In this Code and any regulation or directive adopted under it, “legal holiday” means: (1) January 1, for New Year’s Day; (2) (i) January 15, for Dr. Martin Luther King, Jr.’s birthday; or (ii) if the United States Congress designates another day for observance of Dr. Martin Luther King, Jr.’s birthday, the day designated by the United States Congress; (3) February 12, for Lincoln’s birthday; (4) the third Monday in February, for Washington’s birthday; (5) March 25, for Maryland Day; (6) Good Friday; (7) (i) May 30, for Memorial Day; or (ii) if the United States Congress designates another day for observance of Memorial Day, the day designated by the United States Congress; (8) June 19, for Juneteenth National Independence Day;",
          "citation": "Md. Code, Gen. Prov. § 1-111(a)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-111&enactments=false",
          "sourceId": "md-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q15",
          "text": "(9) July 4, for Independence Day; (10) the first Monday in September, for Labor Day; (11) September 12, for Defenders’ Day; (12) (i) October 12, for Columbus Day; or (ii) if the United States Congress designates another day for observance of Columbus Day, the day designated by the United States Congress; (13) November 11, for Veterans’ Day; (14) the fourth Thursday in November, for Thanksgiving Day; (15) the Friday after Thanksgiving Day, for American Indian Heritage Day; (16) December 25, for Christmas Day; (17) each statewide general election day in the State; and (18) each other day that the President of the United States or the Governor designates for general cessation of business.",
          "citation": "Md. Code, Gen. Prov. § 1-111(a)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-111&enactments=false",
          "sourceId": "md-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "md-q16",
          "text": "(b) Except as otherwise expressly provided in the Code, a legal holiday shall be observed on: (1) the date specified in subsection (a) of this section; or (2) if that date falls on a Sunday, on the next Monday after that date.",
          "citation": "Md. Code, Gen. Prov. § 1-111(b)",
          "url": "https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=ggp&section=1-111&enactments=false",
          "sourceId": "md-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "md-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "A subcontractor has no lien under this subtitle unless it gives this notice within that time.",
          "recipients": [
            "The owner, or any of the owners if there is more than one"
          ],
          "delivery": "Registered or certified mail, return receipt requested, or personal delivery to the owner by the claimant or his agent. If notice cannot be given on account of absence or other causes, it may be placed on the door or other front part of the building within 120 days, in the presence of a competent witness.",
          "quoteIds": [
            "md-q1",
            "md-q2",
            "md-q3",
            "md-q4",
            "md-q5",
            "md-q6"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "doing the work or furnishing the materials"
            }
          ]
        },
        {
          "id": "md-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "md-q1",
            "md-q7",
            "md-q3"
          ]
        },
        {
          "id": "md-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "md-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the work has been finished or the materials furnished"
            }
          ]
        },
        {
          "id": "md-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "If a petition to enforce the lien is filed within the one-year period, the lien remains in full force until the enforcement proceedings conclude, and after that only in accordance with the decree.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "md-q9",
            "md-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the petition to establish the lien is first filed"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "For a single family dwelling being erected on the owner’s land for the owner’s own residence, a subcontractor has no lien unless it gives the notice within 120 days and the owner has not made full payment to the contractor before receiving the notice, and the lien cannot exceed what the owner owes under the contract when the notice is given.",
          "quoteIds": [
            "md-q2",
            "md-q11"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "md-q12"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "md-q13"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year’s Day",
            "quoteId": "md-q14",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr.’s birthday",
            "quoteId": "md-q14",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": false,
            "modelNote": "Statute: January 15, or the day Congress designates. Modeled as the federal third Monday."
          },
          {
            "name": "Lincoln’s birthday",
            "quoteId": "md-q14",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington’s birthday",
            "quoteId": "md-q14",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Maryland Day",
            "quoteId": "md-q14",
            "kind": "fixed",
            "month": 3,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "md-q14",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": false,
            "modelNote": "Statute: May 30, or the day Congress designates. Modeled as the federal last Monday."
          },
          {
            "name": "Juneteenth National Independence Day",
            "quoteId": "md-q14",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "md-q15",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "md-q15",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Defenders’ Day",
            "quoteId": "md-q15",
            "kind": "fixed",
            "month": 9,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "md-q15",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": false,
            "modelNote": "Statute: October 12, or the day Congress designates. Modeled as the federal second Monday."
          },
          {
            "name": "Veterans’ Day",
            "quoteId": "md-q15",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "md-q15",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "American Indian Heritage Day",
            "quoteId": "md-q15",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "md-q15",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "md-q14",
          "md-q15",
          "md-q16"
        ],
        "closure": {
          "clause": "when the act to be done is the filing of a paper in court and the office of the clerk of the court is not open on that day, or is closed for a part of it",
          "place": "the office of the clerk of the court",
          "quoteIds": [
            "md-q13"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "Md. Code, Gen. Prov. § 1-111(a) lists it by name, and its date changes each year with Easter Sunday"
          },
          {
            "name": "statewide general election day",
            "reason": "Md. Code, Gen. Prov. § 1-111(a)(17) names it without stating its date"
          }
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the petition to establish the lien is first filed",
          "input": "Petition to establish the lien first filed on",
          "hint": "Leave empty if no petition to establish the lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "md-0",
        "md-1",
        "md-2",
        "md-3",
        "md-4",
        "md-5"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "ME",
      "name": "Maine",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "10 M.R.S. §§ 3251 to 3269",
      "statuteUrl": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
      "summary": "In Maine a claimant whose labor, materials or services were not furnished by a contract with the owner files a statement in the registry of deeds within 90 days after ceasing to labor, furnish materials or perform services, and mails a copy to the owner, or the lien is dissolved. A lien may be preserved and enforced by an action filed within 120 days after the last of the labor or services are performed or labor, materials or services are so furnished, except as section 3256 provides.",
      "effectiveOrAmended": "Section 3253 was repealed and replaced by PL 2005, c. 287. Section 3255 was last amended by PL 2005, cc. 287 and 311, and corrected by RR 2023, c. 2.",
      "quotes": [
        {
          "id": "me-q1",
          "text": "3. Notice to owner. If the labor, materials or services were not performed or furnished by a contract with the owner of the property affected, the lien described in this chapter may only be enforced against the property affected to the extent of the balance due to the person with whom the owner has directly contracted to perform or furnish the labor, materials and services on which that lien claim is based.",
          "citation": "10 M.R.S. § 3255(3)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3255.html",
          "sourceId": "me-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q2",
          "text": "The total amount due from the owner to those performing or furnishing labor, materials or services without a contract with the owner may not exceed the balance due from the owner to the person with whom the owner has directly contracted at the time of service of process on the owner in a lien action or receipt of the written notice described above, whichever occurs first.",
          "citation": "10 M.R.S. § 3255(3)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3255.html",
          "sourceId": "me-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q3",
          "text": "2. Exemption for contract with owner. This section does not apply when the labor, materials or services are furnished by a contract with the owner of the property affected.",
          "citation": "10 M.R.S. § 3253(2)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
          "sourceId": "me-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q4",
          "text": "1. Enforcement by action. The liens mentioned in sections 3251 to 3254 may be preserved and enforced by action against the debtor and owner of the property affected and all other parties interested therein, filed with the Superior Court or District Court clerk in the county or division where the house, building or appurtenances, wharf, pier or building thereon on which a lien is claimed is situated within 120 days after the last of the labor or services are performed or labor, materials or services are so furnished, except as provided in section 3256.",
          "citation": "10 M.R.S. § 3255(1)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3255.html",
          "sourceId": "me-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q5",
          "text": "The lien under section 3252 is dissolved unless the claimant, within 90 days after ceasing to labor, furnish materials or perform services:",
          "citation": "10 M.R.S. § 3253(1)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
          "sourceId": "me-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q6",
          "text": "A. Files in the office of the register of deeds in the county or registry district in which the building, wharf or pier is situated a true statement of the amount due the claimant, with all just credits given, together with a description of the property intended to be covered by the lien sufficiently accurate to identify it and the names of the owners, if known.",
          "citation": "10 M.R.S. § 3253(1)(A)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
          "sourceId": "me-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q7",
          "text": "B. Provides a copy of the statement under paragraph A to the owner or owners by ordinary mail.",
          "citation": "10 M.R.S. § 3253(1)(B)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
          "sourceId": "me-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q8",
          "text": "For purposes of this paragraph, a post office certificate of mailing the notice to the owner is conclusive proof of receipt by the owner.",
          "citation": "10 M.R.S. § 3253(1)(B)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3253.html",
          "sourceId": "me-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q9",
          "text": "When the owner dies, the owner is adjudicated a bankrupt or a warrant in insolvency issues against the owner's estate within the 120 days and before the commencement of an action, the action may be commenced within 90 days after such adjudication, or after notice given of the election or appointment of the assignee in insolvency, executor or administrator, or the revocation of the warrant.",
          "citation": "10 M.R.S. § 3256",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3256.html",
          "sourceId": "me-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "me-q10",
          "text": "This subsection shall not apply where labor, materials or services are performed or furnished to the premises for a business, commercial or industrial purpose unless the owner resides on the premises affected.",
          "citation": "10 M.R.S. § 3255(3)",
          "url": "https://legislature.maine.gov/statutes/10/title10sec3255.html",
          "sourceId": "me-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "me-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "me-q1",
            "me-q2",
            "me-q3",
            "me-q4"
          ]
        },
        {
          "id": "me-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the lien is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "me-q5",
            "me-q6",
            "me-q3"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant ceases to labor, furnish materials or perform services"
            }
          ]
        },
        {
          "id": "me-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Section 3253 does not apply when the labor, materials or services are furnished by a contract with the owner"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "me-q3"
          ]
        },
        {
          "id": "me-service-0",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the lien is dissolved.",
          "recipients": [
            "The owner or owners"
          ],
          "delivery": "By ordinary mail. A post office certificate of mailing the notice to the owner is conclusive proof of receipt by the owner.",
          "quoteIds": [
            "me-q5",
            "me-q7",
            "me-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant ceases to labor, furnish materials or perform services"
            }
          ]
        },
        {
          "id": "me-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "me-q4",
            "me-q9"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last of the labor or services are performed or labor, materials or services are so furnished"
            }
          ],
          "mayChangeIf": "the owner dies, is adjudicated a bankrupt or a warrant in insolvency issues against the owner’s estate within the 120 days and before an action is commenced"
        }
      ],
      "residential": [
        {
          "text": "The owner’s defense for payments made to the person the owner contracted with does not apply where labor, materials or services are performed or furnished to the premises for a business, commercial or industrial purpose, unless the owner resides on the premises.",
          "quoteIds": [
            "me-q10"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": null,
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "me-0",
        "me-1",
        "me-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MI",
      "name": "Michigan",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Mich. Comp. Laws §§ 570.1107 to 570.1117",
      "statuteUrl": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
      "summary": "Michigan ends the right to a construction lien unless a claim of lien is recorded within 90 days after the lien claimant's last furnishing of labor or material for the improvement. The claimant serves a copy on the designee within 15 days after recording and brings proceedings to enforce the lien no later than 1 year after the claim of lien was recorded, and a subcontractor or supplier provides a notice of furnishing within 20 days after furnishing its first labor or material, except as sections 108 and 108a provide, and a laborer within 30 days after wages were contractually due but were not paid.",
      "effectiveOrAmended": "Sections 570.1108, 570.1108a and 570.1109 were amended by 2018 PA 367 (immediate effect December 12, 2018), section 570.1111 by 1982 PA 17, section 570.1117 by 1981 PA 191 and section 570.1114 by 2016 PA 415.",
      "quotes": [
        {
          "id": "mi-q1",
          "text": "(1) Except as otherwise provided in sections 108 and 108a, a subcontractor or supplier that contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, as named in the notice of commencement at the address shown in the notice of commencement, either personally or by certified mail, within 20 days after furnishing the first labor or material.",
          "citation": "Mich. Comp. Laws § 570.1109(1)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q2",
          "text": "If a designee has not been named in the notice of commencement, or if the designee has died, service must be made on the owner or lessee named in the notice of commencement.",
          "citation": "Mich. Comp. Laws § 570.1109(1)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q3",
          "text": "If service of the notice of furnishing is made by certified mail, service is complete on mailing.",
          "citation": "Mich. Comp. Laws § 570.1109(1)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q4",
          "text": "(5) The failure of a lien claimant to provide a notice of furnishing within the time specified in this section does not defeat the lien claimant's right to a construction lien for work performed or materials furnished by the lien claimant after the service of the notice of furnishing.",
          "citation": "Mich. Comp. Laws § 570.1109(5)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q5",
          "text": "(6) The failure of a lien claimant to provide a notice of furnishing within the time specified in this section does not defeat the lien claimant's right to a construction lien for work performed or materials furnished by the lien claimant before the service of the notice of furnishing except to the extent that payments were made by or on behalf of the owner or lessee to the contractor pursuant to either a contractor's sworn statement or a waiver of lien in accordance with this act for work performed or material delivered by the lien claimant.",
          "citation": "Mich. Comp. Laws § 570.1109(6)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q6",
          "text": "(2) Except as otherwise provided in sections 108 and 108a, a laborer who contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, as named in the notice of commencement at the address shown in the notice of commencement, either personally or by mail, within 30 days after wages were contractually due but were not paid.",
          "citation": "Mich. Comp. Laws § 570.1109(2)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q7",
          "text": "If service of the notice of furnishing is made by mail, service is complete on mailing by first class mail with postage prepaid.",
          "citation": "Mich. Comp. Laws § 570.1109(2)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q8",
          "text": "(7) The failure of a laborer to provide a notice of furnishing to the designee as required by subsection (2) defeats the laborer's lien for the wages for which the notice of furnishing is required.",
          "citation": "Mich. Comp. Laws § 570.1109(7)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q9",
          "text": "(9) The failure of a laborer to provide a notice of furnishing to the general contractor within the time specified in subsection (2) or (3) does not defeat the laborer's right to a construction lien, but the laborer is liable for any actual damages sustained by the general contractor as a result of the failure.",
          "citation": "Mich. Comp. Laws § 570.1109(9)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q10",
          "text": "(3) Except as otherwise provided in sections 108 and 108a, a laborer who provides an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, named in the notice of commencement at the address shown in the notice of commencement, either personally or by certified mail, by the fifth day of the second month following the month in which fringe benefits or withholdings from wages were contractually due but were not paid.",
          "citation": "Mich. Comp. Laws § 570.1109(3)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q11",
          "text": "(8) The failure of a laborer to provide a notice of furnishing to the designee as required by subsection (3) defeats the laborer's lien for the fringe benefits and withholdings for which the notice of furnishing is required.",
          "citation": "Mich. Comp. Laws § 570.1109(8)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q12",
          "text": "A contractor is not required to provide a notice of furnishing to preserve lien rights arising from his or her contract directly with an owner or lessee.",
          "citation": "Mich. Comp. Laws § 570.1109(1)",
          "url": "https://web.archive.org/web/20250516131404id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1109",
          "sourceId": "mi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q13",
          "text": "(1) Notwithstanding section 109, the right of a contractor, subcontractor, laborer, or supplier to a construction lien created by this act shall cease to exist unless, within 90 days after the lien claimant's last furnishing of labor or material for the improvement, pursuant to the lien claimant's contract, a claim of lien is recorded in the office of the register of deeds for each county where the real property to which the improvement was made is located.",
          "citation": "Mich. Comp. Laws § 570.1111(1)",
          "url": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
          "sourceId": "mi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        },
        {
          "id": "mi-q14",
          "text": "(5) Each contractor, subcontractor, supplier, laborer, or agent of a group of laborers authorized under subsection (6) recording a claim of lien, within 15 days after the date of the recording, shall serve on the designee personally or by certified mail, return receipt requested, at the address shown on the notice of commencement, a copy of the claim of lien and a copy of any proof of service recorded in connection with the claim of lien.",
          "citation": "Mich. Comp. Laws § 570.1111(5)",
          "url": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
          "sourceId": "mi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        },
        {
          "id": "mi-q15",
          "text": "If a designee has not been named in the notice of commencement, or if the designee has died, service shall be made upon the owner or lessee named in the notice of commencement.",
          "citation": "Mich. Comp. Laws § 570.1111(5)",
          "url": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
          "sourceId": "mi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        },
        {
          "id": "mi-q16",
          "text": "If the service is made by certified mail, service is complete upon mailing.",
          "citation": "Mich. Comp. Laws § 570.1111(5)",
          "url": "https://web.archive.org/web/20250517043920id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1111",
          "sourceId": "mi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        },
        {
          "id": "mi-q17",
          "text": "(1) Proceedings for the enforcement of a construction lien and the foreclosure of any interests subject to the construction lien shall not be brought later than 1 year after the date the claim of lien was recorded.",
          "citation": "Mich. Comp. Laws § 570.1117(1)",
          "url": "https://web.archive.org/web/20250516001507id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1117",
          "sourceId": "mi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q18",
          "text": "A contractor does not have a right to a construction lien on the interest of an owner or lessee in a residential structure unless the contractor has provided an improvement to the residential structure under a written contract between the owner or lessee and the contractor and any amendments or additions to the contract are also in writing.",
          "citation": "Mich. Comp. Laws § 570.1114",
          "url": "https://web.archive.org/web/20251223201708id_/https://legislature.mi.gov/Laws/MCL?objectName=MCL-570-1114",
          "sourceId": "mi-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-23"
        },
        {
          "id": "mi-q19",
          "text": "(1) An owner or lessee who contracts for an improvement to a residential structure shall prepare and provide a notice of commencement to a contractor, subcontractor, supplier, or laborer who has made a written request for the notice as provided in this section.",
          "citation": "Mich. Comp. Laws § 570.1108a(1)",
          "url": "https://web.archive.org/web/20250517054740id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108a",
          "sourceId": "mi-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        },
        {
          "id": "mi-q20",
          "text": "(1) Before the commencement of any improvements to real property, the owner or lessee contracting for the improvements shall record in the office of the register of deeds for each county in which the real property to be improved is located a notice of commencement, in the form set forth in this section.",
          "citation": "Mich. Comp. Laws § 570.1108(1)",
          "url": "https://web.archive.org/web/20250516091235id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108",
          "sourceId": "mi-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q21",
          "text": "(10) Failure of an owner, lessee, or designee to record a notice of commencement as required by this section extends the time within which a subcontractor or supplier may provide a notice of furnishing, as described in section 109, until 20 days after the notice of commencement has been recorded.",
          "citation": "Mich. Comp. Laws § 570.1108(10)",
          "url": "https://web.archive.org/web/20250516091235id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108",
          "sourceId": "mi-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q22",
          "text": "(11) Failure of an owner, lessee, or designee to provide, on written request, a notice of commencement as required by this section extends the time within which a subcontractor or supplier may provide a notice of furnishing, as described in section 109, until 20 days after the notice of commencement actually has been furnished to the subcontractor or supplier.",
          "citation": "Mich. Comp. Laws § 570.1108(11)",
          "url": "https://web.archive.org/web/20250516091235id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108",
          "sourceId": "mi-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q23",
          "text": "(12) Failure of an owner, lessee, or designee to record a notice of commencement as required by this section extends the time within which a laborer may provide a notice of furnishing, as described in section 109, until 30 days after the notice of commencement has been recorded, or until the time in which to provide the notice of furnishing in accordance with section 109 expires, whichever is later.",
          "citation": "Mich. Comp. Laws § 570.1108(12)",
          "url": "https://web.archive.org/web/20250516091235id_/https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-570-1108",
          "sourceId": "mi-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-16"
        },
        {
          "id": "mi-q24",
          "text": "This section applies to the statutes and administrative rules. In computing a period of days, the first day is excluded and the last day is included.",
          "citation": "Mich. Comp. Laws § 8.6",
          "url": "https://web.archive.org/web/20250708202026id_/https://legislature.mi.gov/Laws/MCL?objectName=MCL-8-6",
          "sourceId": "mi-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-07-08"
        },
        {
          "id": "mi-q25",
          "text": "If the last day of any period or a fixed or final day is a Saturday, Sunday or legal holiday, the period or day is extended to include the next day which is not a Saturday, Sunday or legal holiday.",
          "citation": "Mich. Comp. Laws § 8.6",
          "url": "https://web.archive.org/web/20250708202026id_/https://legislature.mi.gov/Laws/MCL?objectName=MCL-8-6",
          "sourceId": "mi-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-07-08"
        },
        {
          "id": "mi-q26",
          "text": "(1) The following days are considered and treated as the first day of the week, commonly called Sunday, and as public holidays or half-holidays: (a) January 1, New Year's Day. (b) The third Monday of January in conjunction with the federal holiday, Martin Luther King, Jr. Day. (c) February 12, Lincoln's Birthday. (d) The third Monday of February, Washington's Birthday. (e) The last Monday of May, Memorial or Decoration Day. (f) June 19, Juneteenth. (g) July 4, Independence Day. (h) The first Monday of September, Labor Day. (i) The second Monday of October, Columbus Day. (j) November 11, Veterans Day. (k) The fourth Thursday of November, Thanksgiving Day. (l) December 25, Christmas Day. (m) Every Saturday from 12 noon until 12 midnight, which is designated a half-holiday.",
          "citation": "Mich. Comp. Laws § 435.101(1)",
          "url": "https://web.archive.org/web/20250517074538id_/https://www.legislature.mi.gov/Laws/MCL?objectName=MCL-435-101",
          "sourceId": "mi-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-17"
        }
      ],
      "rules": [
        {
          "id": "mi-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "A late notice does not defeat the lien for work performed or materials furnished after it is served. For earlier work it defeats the lien only to the extent the owner or lessee paid the contractor under a contractor's sworn statement or a waiver of lien for that work.",
          "recipients": [
            "The designee and the general contractor, if any, named in the notice of commencement, at the address shown in it",
            "The owner or lessee named in the notice of commencement, if no designee is named or the designee has died"
          ],
          "delivery": "Personally or by certified mail. Service by certified mail is complete on mailing.",
          "quoteIds": [
            "mi-q1",
            "mi-q2",
            "mi-q3",
            "mi-q4",
            "mi-q5"
          ],
          "mayChangeIf": "an owner, lessee, or designee fails to record or provide a notice of commencement as section 108 or 108a requires"
        },
        {
          "id": "mi-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a laborer, as to wages",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 30 days after wages were contractually due but were not paid"
          },
          "consequence": "Failing to provide the notice to the designee defeats the laborer's lien for those wages. Failing to provide it to the general contractor does not defeat the lien, but the laborer is liable for the general contractor's actual damages from the failure.",
          "recipients": [
            "The designee and the general contractor, if any, named in the notice of commencement, at the address shown in it",
            "The owner or lessee named in the notice of commencement, if no designee is named or the designee has died"
          ],
          "delivery": "Personally or by mail. Service by mail is complete on mailing by first class mail with postage prepaid.",
          "quoteIds": [
            "mi-q6",
            "mi-q2",
            "mi-q7",
            "mi-q8",
            "mi-q9"
          ]
        },
        {
          "id": "mi-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a laborer, as to fringe benefits or withholdings from wages",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "By the fifth day of the second month following the month in which fringe benefits or withholdings from wages were contractually due but were not paid"
          },
          "consequence": "Failing to provide the notice to the designee defeats the laborer's lien for those fringe benefits and withholdings. Failing to provide it to the general contractor does not defeat the lien, but the laborer is liable for the general contractor's actual damages from the failure.",
          "recipients": [
            "The designee and the general contractor, if any, named in the notice of commencement, at the address shown in it",
            "The owner or lessee named in the notice of commencement, if no designee is named or the designee has died"
          ],
          "delivery": "Personally or by certified mail. Service by certified mail is complete on mailing.",
          "quoteIds": [
            "mi-q10",
            "mi-q2",
            "mi-q3",
            "mi-q11",
            "mi-q9"
          ]
        },
        {
          "id": "mi-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mi-q12"
          ]
        },
        {
          "id": "mi-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If no claim of lien is recorded within that time, the right to a construction lien ceases to exist.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mi-q13"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the lien claimant last furnished labor or material for the improvement, pursuant to the lien claimant's contract"
            }
          ]
        },
        {
          "id": "mi-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The designee, at the address shown on the notice of commencement",
            "The owner or lessee named in the notice of commencement, if no designee is named or the designee has died"
          ],
          "delivery": "Personally or by certified mail, return receipt requested, with a copy of any proof of service recorded with the claim of lien. Service by certified mail is complete upon mailing.",
          "quoteIds": [
            "mi-q14",
            "mi-q15",
            "mi-q16"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is recorded"
            }
          ]
        },
        {
          "id": "mi-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mi-q17"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is recorded"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "A contractor has no right to a construction lien on the interest of an owner or lessee in a residential structure unless it provided the improvement under a written contract with the owner or lessee, with any amendments or additions also in writing.",
          "quoteIds": [
            "mi-q18"
          ]
        },
        {
          "text": "For an improvement to a residential structure, the owner or lessee prepares and provides a notice of commencement to a contractor, subcontractor, supplier or laborer that has made a written request for it.",
          "quoteIds": [
            "mi-q19"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "Before improvements begin, the owner or lessee contracting for them records a notice of commencement with the register of deeds. If it is not recorded, a subcontractor or supplier has until 20 days after it is recorded to provide a notice of furnishing, and if it is not provided on written request, until 20 days after it is actually furnished. A laborer has until 30 days after it is recorded, or the time section 109 allows, whichever is later.",
          "quoteIds": [
            "mi-q20",
            "mi-q21",
            "mi-q22",
            "mi-q23"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "mi-q24"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "mi-q25"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr. Day",
            "quoteId": "mi-q26",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln's Birthday",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington's Birthday",
            "quoteId": "mi-q26",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial or Decoration Day",
            "quoteId": "mi-q26",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "mi-q26",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "mi-q26",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "mi-q26",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "mi-q26",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "mi-q26"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is recorded",
          "input": "Claim of lien recorded on",
          "hint": "Leave empty if no claim of lien has been recorded."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "mi-0",
        "mi-1",
        "mi-2",
        "mi-3",
        "mi-4",
        "mi-5",
        "mi-6",
        "mi-7"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MN",
      "name": "Minnesota",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Minn. Stat. ch. 514",
      "statuteUrl": "https://www.revisor.mn.gov/statutes/cite/514/full",
      "summary": "In Minnesota the lien ceases 120 days after the last of the work is done, or the last item of skill, material or machinery is furnished, unless within that period a statement of the claim is filed for record and a copy is served on the owner, the owner's authorized agent or the person who entered into the contract with the contractor. The lien is asserted by filing a complaint or answer within one year after the date of the last item of the claim set forth in the recorded lien statement, and section 514.011 requires pre-lien notices to the owner unless it says they are not required.",
      "effectiveOrAmended": "The 2025 Minnesota Statutes print section 514.011 as last amended by Laws 1989, chapter 160, section 514.08 by Laws 1997, chapter 137, and section 514.12 by Laws 1995, chapter 5.",
      "quotes": [
        {
          "id": "mn-q1",
          "text": "Every person who enters into a contract with the owner for the improvement of real property and who has contracted or will contract with any subcontractors or material suppliers to provide labor, skill or materials for the improvement shall include in any written contract with the owner the notice required in this subdivision and shall provide the owner with a copy of the written contract.",
          "citation": "Minn. Stat. § 514.011, subd. 1",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q2",
          "text": "If no written contract for the improvement is entered into, the notice must be prepared separately and delivered personally or by certified mail to the owner or the owner's authorized agent within ten days after the work of improvement is agreed upon.",
          "citation": "Minn. Stat. § 514.011, subd. 1",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q3",
          "text": "A person who fails to provide the notice shall not have the lien and remedy provided by this chapter.",
          "citation": "Minn. Stat. § 514.011, subd. 1",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q4",
          "text": "The notice required by this subdivision is not required of any person who is an owner of the improved real estate, to any corporate contractor of which the owner of the improved real estate is an officer or controlling shareholder, to any contractor who is an officer or controlling shareholder of a corporation which is the owner of the improved real estate, or to any corporate contractor managed or controlled by substantially the same persons who manage or control a corporation which is the owner of the improved real estate.",
          "citation": "Minn. Stat. § 514.011, subd. 1",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q5",
          "text": "The notice required by this section shall not be required to be given where the contractor is managed or controlled by substantially the same persons who manage or control the owner of the improved real estate.",
          "citation": "Minn. Stat. § 514.011, subd. 4a",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q6",
          "text": "The notice required by this section shall not be required to be given in connection with an improvement to real property consisting of or providing more than four family units when the improvement is wholly residential in character.",
          "citation": "Minn. Stat. § 514.011, subd. 4b",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q7",
          "text": "The notice required by this section shall not be required to be given in connection with an improvement to real property which is not in agricultural use and which is wholly or partially nonresidential in use if the work or improvement: (a) is to provide or add more than 5,000 total usable square feet of floor space; or (b) is an improvement to real property where the existing property contains more than 5,000 total usable square feet of floor space; or (c) is an improvement to real property which contains more than 5,000 square feet and does not involve the construction of a new building or an addition to or the improvement of an existing building.",
          "citation": "Minn. Stat. § 514.011, subd. 4c",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q8",
          "text": "(a) Every person who contributes to the improvement of real property so as to be entitled to a lien pursuant to section 514.01, except a party under direct contract with the owner must, as a necessary prerequisite to the validity of any claim or lien, cause to be given to the owner or the owner's authorized agent, either by personal delivery or by certified mail, not later than 45 days after the lien claimant has first furnished labor, skill or materials for the improvement, a written notice in at least 10-point bold type, if printed, or in capital letters, if typewritten, which shall state:",
          "citation": "Minn. Stat. § 514.011, subd. 2",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q9",
          "text": "(b) A person entitled to a lien does not lose the right to the lien for failure to strictly comply with this subdivision if a good faith effort is made to comply, unless the owner or another lien claimant proves damage as a direct result of the failure to comply.",
          "citation": "Minn. Stat. § 514.011, subd. 2",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q10",
          "text": "The lien ceases at the end of 120 days after doing the last of the work, or furnishing the last item of skill, material, or machinery, unless within this period: (1) a statement of the claim is filed for record with the county recorder or, if registered land, with the registrar of titles of the county in which the improved premises are situated, or, if the claim is made under section 514.04, with the secretary of state; and (2) a copy of the statement is served personally or by certified mail on the owner or the owner's authorized agent or the person who entered into the contract with the contractor.",
          "citation": "Minn. Stat. § 514.08, subd. 1",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q11",
          "text": "No lien shall be enforced in any case unless the holder thereof shall assert the same, either by filing a complaint or answer with the court administrator, within one year after the date of the last item of the claim as set forth in the recorded lien statement; and, no person shall be bound by any judgment in such action unless made a party thereto within the year; and, as to a bona fide purchaser, mortgagee, or encumbrancer without notice, the absence from the record of a notice of lis pendens of an action after the expiration of the year in which the lien could be so asserted shall be conclusive evidence that the lien may no longer be enforced and, in the case of registered land, the registrar of titles shall refrain from carrying forward to new certificates of title the memorials of lien statements when no such notice of lis pendens has been registered within the period.",
          "citation": "Minn. Stat. § 514.12, subd. 3",
          "url": "https://www.revisor.mn.gov/statutes/cite/514/full",
          "sourceId": "mn-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q12",
          "text": "Where the performance or doing of any act, duty, matter, payment, or thing is ordered or directed, and the period of time or duration for the performance or doing thereof is prescribed and fixed by law, the time, except as otherwise provided in sections 645.13 and 645.14, shall be computed so as to exclude the first and include the last day of the prescribed or fixed period or duration of time.",
          "citation": "Minn. Stat. § 645.15",
          "url": "https://www.revisor.mn.gov/statutes/cite/645.15",
          "sourceId": "mn-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q13",
          "text": "When the last day of the period falls on Saturday, Sunday, or a legal holiday, that day shall be omitted from the computation.",
          "citation": "Minn. Stat. § 645.15",
          "url": "https://www.revisor.mn.gov/statutes/cite/645.15",
          "sourceId": "mn-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q14",
          "text": "(a) \"Holiday\" includes New Year's Day, January 1; Martin Luther King's Birthday, the third Monday in January; Washington's and Lincoln's Birthday, the third Monday in February; Memorial Day, the last Monday in May; Juneteenth, June 19; Independence Day, July 4; Labor Day, the first Monday in September; Indigenous Peoples Day, the second Monday in October; Veterans Day, November 11; Thanksgiving Day, the fourth Thursday in November; and Christmas Day, December 25; provided, when New Year's Day, January 1; or Juneteenth, June 19; or Independence Day, July 4; or Veterans Day, November 11; or Christmas Day, December 25; falls on Sunday, the following day shall be a holiday and, provided, when New Year's Day, January 1; or Juneteenth, June 19; or Independence Day, July 4; or Veterans Day, November 11; or Christmas Day, December 25; falls on Saturday, the preceding day shall be a holiday.",
          "citation": "Minn. Stat. § 645.44, subd. 5",
          "url": "https://www.revisor.mn.gov/statutes/cite/645.44",
          "sourceId": "mn-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q15",
          "text": "However, for the executive branch of the state of Minnesota, \"holiday\" also includes the Friday after Thanksgiving but does not include Indigenous Peoples Day.",
          "citation": "Minn. Stat. § 645.44, subd. 5",
          "url": "https://www.revisor.mn.gov/statutes/cite/645.44",
          "sourceId": "mn-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mn-q16",
          "text": "Other branches of state government and political subdivisions shall have the option of determining whether Indigenous Peoples Day and the Friday after Thanksgiving shall be holidays.",
          "citation": "Minn. Stat. § 645.44, subd. 5",
          "url": "https://www.revisor.mn.gov/statutes/cite/645.44",
          "sourceId": "mn-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "mn-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who enters into a contract with the owner and has contracted or will contract with any subcontractors or material suppliers, unless section 514.011, subdivision 1, 4a, 4b or 4c, says the notice is not required",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Included in any written contract with the owner or, if no written contract is entered into, delivered within ten days after the work of improvement is agreed upon"
          },
          "consequence": "A person who fails to provide the notice does not have the lien and remedy the chapter provides.",
          "recipients": [
            "The owner or the owner's authorized agent"
          ],
          "delivery": "Included in the written contract, with a copy of the contract to the owner, or, without a written contract, prepared separately and delivered personally or by certified mail.",
          "quoteIds": [
            "mn-q1",
            "mn-q2",
            "mn-q3",
            "mn-q4",
            "mn-q5",
            "mn-q6",
            "mn-q7"
          ]
        },
        {
          "id": "mn-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For every person who contributes to the improvement so as to have a lien under section 514.01, except a party under direct contract with the owner, unless section 514.011, subdivision 4a, 4b or 4c, says the notice is not required",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 45
            }
          },
          "notComputed": null,
          "consequence": "The notice is a necessary prerequisite to the validity of any claim or lien. A person that makes a good faith effort to comply does not lose the lien unless the owner or another lien claimant proves damage as a direct result of the failure to comply.",
          "recipients": [
            "The owner or the owner's authorized agent"
          ],
          "delivery": "By personal delivery or by certified mail.",
          "quoteIds": [
            "mn-q8",
            "mn-q9",
            "mn-q5",
            "mn-q6",
            "mn-q7"
          ]
        },
        {
          "id": "mn-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "If the statement is not filed for record and a copy served within that period, the lien ceases at the end of the 120 days.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mn-q10"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last of the work was done, or the last item of skill, material, or machinery was furnished"
            }
          ]
        },
        {
          "id": "mn-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner, the owner's authorized agent or the person who entered into the contract with the contractor"
          ],
          "delivery": "Personally or by certified mail.",
          "quoteIds": [
            "mn-q10"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last of the work was done, or the last item of skill, material, or machinery was furnished"
            }
          ]
        },
        {
          "id": "mn-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "No lien may be enforced unless the holder asserts it within that year.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mn-q11"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the date of the last item of the claim as set forth in the recorded lien statement"
            }
          ],
          "mayChangeIf": "the recorded lien statement sets forth a different date for the last item of the claim"
        }
      ],
      "residential": [
        {
          "text": "The pre-lien notices of section 514.011 are not required for an improvement to real property consisting of or providing more than four family units when the improvement is wholly residential in character.",
          "quoteIds": [
            "mn-q6"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "mn-q12"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "mn-q13"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "mn-q14",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King's Birthday",
            "quoteId": "mn-q14",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington's and Lincoln's Birthday",
            "quoteId": "mn-q14",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "mn-q14",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "mn-q14",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "mn-q14",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "mn-q14",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "mn-q14",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "mn-q14",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "mn-q14",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "mn-q14",
          "mn-q15",
          "mn-q16"
        ],
        "holidaysNotModeled": [
          {
            "name": "Indigenous Peoples Day",
            "reason": "Minn. Stat. § 645.44, subd. 5 excludes it for the executive branch and gives other branches of state government and political subdivisions the option of determining whether it is a holiday"
          },
          {
            "name": "the Friday after Thanksgiving",
            "reason": "Minn. Stat. § 645.44, subd. 5 makes it a holiday for the executive branch and gives other branches of state government and political subdivisions the option of determining whether it is a holiday"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the last of the work was done, or the last item of skill, material, or machinery was furnished",
          "input": "Last work done or last item furnished on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "mn-0",
        "mn-1",
        "mn-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MO",
      "name": "Missouri",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Mo. Rev. Stat. §§ 429.010 to 429.340",
      "statuteUrl": "https://revisor.mo.gov/main/OneSection.aspx?section=429.080",
      "summary": "Missouri requires every original contractor, journeyman and day laborer, and every other person seeking a lien to file a just and true account with the clerk of the circuit court within six months after the indebtedness accrued, and every action to be commenced within six months after the lien is filed. Every person except the original contractor gives the owner ten days' notice before filing the lien, except where section 429.016 applies, and an original contractor gives a written notice before receiving any payment.",
      "effectiveOrAmended": "The sections on the original contractor's notice to owner and the consent of owner were amended by 2014 S.B. 491, effective January 1, 2017. The section on filing the lien was last amended by 2007 S.B. 302, the section on residential real property and notices of rights was enacted by 2010 H.B. 1692, and the section on commencing actions was last amended in 1959.",
      "quotes": [
        {
          "id": "mo-q1",
          "text": "1. Every original contractor, who shall do or perform any work or labor upon, or furnish any material, fixtures, engine, boiler or machinery for any building, erection or improvements upon land, or for repairing the same, under or by virtue of any contract, or without a contract if ordered by a city, town, village or county having a charter form of government to abate the conditions that caused a structure on that property to be deemed a dangerous building under local ordinances pursuant to section 67.410, shall provide to the person with whom the contract is made or to the owner if there is no contract, prior to receiving payment in any form of any kind from such person, (a) either at the time of the execution of the contract, (b) when the materials are delivered, (c) when the work is commenced, or (d) delivered with first invoice, a written notice which shall include the following disclosure language in ten-point bold type:",
          "citation": "Mo. Rev. Stat. § 429.012.1",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.012",
          "sourceId": "mo-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q2",
          "text": "2. Compliance with subsection 1 of this section shall be a condition precedent to the creation, existence or validity of any mechanic's lien in favor of such original contractor.",
          "citation": "Mo. Rev. Stat. § 429.012.2",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.012",
          "sourceId": "mo-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q3",
          "text": "4. The provisions of subsections 1 and 2 of this section shall not apply to new residences for which the buyer has been furnished mechanics' and suppliers' lien protection through a title insurance company registered in the state of Missouri.",
          "citation": "Mo. Rev. Stat. § 429.012.4",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.012",
          "sourceId": "mo-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q4",
          "text": "1. The provisions of this section shall only apply to mechanic's liens asserted against residential real property, other than mechanic's liens for the repair, remodeling, or addition to owner-occupied residential property of four units or less which are governed by section 429.013 and other applicable sections of this chapter.",
          "citation": "Mo. Rev. Stat. § 429.016.1",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q5",
          "text": "3. Any person or entity, hereinafter referred to as claimant, who seeks to retain the right to assert a mechanic's lien against residential real property, hereinafter referred to as property, shall record a notice of rights in the office of the recorder of deeds for the county in which the property is located, not less than five calendar days prior to the intended date of closing stated in a notice of intended sale as contemplated in this section.",
          "citation": "Mo. Rev. Stat. § 429.016.3",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q6",
          "text": "6. Any claimant that fails to record such notice of rights shall be deemed to waive and forfeit any right to assert a mechanic's lien against such property.",
          "citation": "Mo. Rev. Stat. § 429.016.6",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q7",
          "text": "The owner's, or its designated agent's, recording of a notice of intended sale as to the subject property, as contemplated herein, is a condition precedent to a claimant's obligation to record a notice of rights as to the subject property in order to retain a claimant's mechanic's lien rights as to such property.",
          "citation": "Mo. Rev. Stat. § 429.016.11(1)",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q8",
          "text": "Every person except the original contractor, who may wish to avail himself of the benefit of the provisions of sections 429.010 to 429.340, shall give ten days' notice before the filing of the lien, as herein required, to the owner, owners or agent, or either of them, that he holds a claim against such building or improvement, setting forth the amount and from whom the same is due.",
          "citation": "Mo. Rev. Stat. § 429.100",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.100",
          "sourceId": "mo-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q9",
          "text": "Such notice may be served by any officer authorized by law to serve process in civil actions, or by any person who would be a competent witness.",
          "citation": "Mo. Rev. Stat. § 429.100",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.100",
          "sourceId": "mo-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q10",
          "text": "14. The claimant shall not be required to provide the notice required under section 429.100, but compliance with the requirements of this section shall not relieve the claimant of its duty to comply with all other applicable sections of this chapter, except as specifically modified herein, in order to preserve, assert, and enforce its mechanic's lien rights.",
          "citation": "Mo. Rev. Stat. § 429.016.14",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q11",
          "text": "It shall be the duty of every original contractor, every journeyman and day laborer, including persons who use rented machinery or equipment in performing such work or labor, and every other person seeking to obtain the benefit of the provisions of sections 429.010 to 429.340, within six months after the indebtedness shall have accrued, or, with respect to rental equipment or machinery rented to others, then, within sixty days after the date the last of the rental equipment or machinery was last removed from the property, to file with the clerk of the circuit court of the proper county a just and true account of the demand due him or them after all just credits have been given, which is to be a lien upon such building or other improvements, and a true description of the property, or so near as to identify the same, upon which the lien is intended to apply, with the name of the owner or contractor, or both, if known to the person filing the lien, which shall, in all cases, be verified by the oath of himself or some credible person for him.",
          "citation": "Mo. Rev. Stat. § 429.080",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.080",
          "sourceId": "mo-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q12",
          "text": "All actions under sections 429.010 to 429.340 shall be commenced within six months after filing the lien, and prosecuted without unnecessary delay to final judgment; and no lien shall continue to exist by virtue of the provisions of said sections, for more than six months after the lien shall be filed, unless within that time an action shall be instituted thereon, as herein prescribed.",
          "citation": "Mo. Rev. Stat. § 429.170",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.170",
          "sourceId": "mo-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q13",
          "text": "1. The provisions of this section shall apply only to the repair or remodeling of or addition to owner-occupied residential property of four units or less.",
          "citation": "Mo. Rev. Stat. § 429.013.1",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.013",
          "sourceId": "mo-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q14",
          "text": "It shall be a condition precedent to the creation, existence or validity of any lien by anyone other than an original contractor that a copy of a consent in the form prescribed in subsection 2 of this section, signed by an owner, be attached to the recording of a claim of lien.",
          "citation": "Mo. Rev. Stat. § 429.013.3",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.013",
          "sourceId": "mo-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q15",
          "text": "4. In the absence of a consent described in subsection 2 of this section, full payment of the amount due under a contract to the contractor shall be a complete defense to all liens filed by any person performing work or labor or furnishing material, fixtures, engines, boilers or machinery.",
          "citation": "Mo. Rev. Stat. § 429.013.4",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.013",
          "sourceId": "mo-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q16",
          "text": "(1) If the record title owner of residential real property, hereinafter the owner, has contracted with a claimant for the performance or provision of work, labor, or materials for the improvement of such property in order to facilitate the owner's sale of such property to a bona fide purchaser for value as contemplated in this section, then the owner or such owner's designated agent shall record a notice of intended sale in the office of the recorder of deeds for the county in which the property is located.",
          "citation": "Mo. Rev. Stat. § 429.016.11(1)",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q17",
          "text": "The notice of intended sale shall be recorded not less than forty-five calendar days prior to the earliest calendar date the owner intends to close on the sale of such property to such purchaser.",
          "citation": "Mo. Rev. Stat. § 429.016.11(1)",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q18",
          "text": "12. The recording of a notice of rights shall not extend the time for filing a mechanic's lien as provided under section 429.080.",
          "citation": "Mo. Rev. Stat. § 429.016.12",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=429.016",
          "sourceId": "mo-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q19",
          "text": "1. In computing any period of time prescribed or allowed by this code, by order of court, or by any applicable statute, the day of the act, event, or default after which the designated period of time begins to run is not to be included.",
          "citation": "Mo. Rev. Stat. § 506.060.1",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=506.060",
          "sourceId": "mo-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q20",
          "text": "The time within which an act is to be done shall be computed by excluding the first day and including the last.",
          "citation": "Mo. Rev. Stat. § 1.040",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=1.040",
          "sourceId": "mo-7",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q21",
          "text": "The last day of the period so computed is to be included, unless it is a Saturday, Sunday, or a legal holiday, in which event the period runs until the end of the next day which is neither a Saturday, Sunday, nor a legal holiday.",
          "citation": "Mo. Rev. Stat. § 506.060.1",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=506.060",
          "sourceId": "mo-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mo-q22",
          "text": "The first day of January, the third Monday of January, the twelfth day of February, the third Monday in February, the eighth day of May, the last Monday in May, the nineteenth day of June, the fourth day of July, the first Monday in September, the second Monday in October, the eleventh day of November, the fourth Thursday in November, and the twenty-fifth of December, are declared and established public holidays; and when any of such holidays falls upon Sunday, the Monday next following shall be considered the holiday.",
          "citation": "Mo. Rev. Stat. § 9.010",
          "url": "https://revisor.mo.gov/main/OneSection.aspx?section=9.010",
          "sourceId": "mo-8",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "mo-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Prior to receiving payment in any form of any kind from the person with whom the contract is made, or the owner if there is no contract, (a) either at the time of the execution of the contract, (b) when the materials are delivered, (c) when the work is commenced, or (d) delivered with first invoice"
          },
          "consequence": "Compliance is a condition precedent to the creation, existence or validity of any mechanic's lien in favor of the original contractor.",
          "recipients": [
            "The person with whom the contract is made, or the owner if there is no contract"
          ],
          "delivery": "A written notice including the disclosure language section 429.012 sets, in ten-point bold type.",
          "quoteIds": [
            "mo-q1",
            "mo-q2"
          ]
        },
        {
          "id": "mo-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For new residences for which the buyer has been furnished coverage against mechanics' and suppliers' liens through a title insurance company registered in the state of Missouri",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mo-q3"
          ]
        },
        {
          "id": "mo-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a mechanic's lien asserted against residential real property, as section 429.016 defines it, other than a lien for the repair, remodeling, or addition to owner-occupied residential property of four units or less, where the owner has recorded a notice of intended sale",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "A notice of rights recorded not less than five calendar days prior to the intended date of closing stated in a notice of intended sale"
          },
          "consequence": "A claimant that fails to record the notice of rights is deemed to waive and forfeit any right to assert a mechanic's lien against the property.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mo-q4",
            "mo-q5",
            "mo-q6",
            "mo-q7"
          ]
        },
        {
          "id": "mo-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Ten days' notice before the filing of the lien"
          },
          "consequence": null,
          "recipients": [
            "The owner, owners or agent, or either of them"
          ],
          "delivery": "Served by any officer authorized by law to serve process in civil actions, or by any person who would be a competent witness.",
          "quoteIds": [
            "mo-q8",
            "mo-q9"
          ]
        },
        {
          "id": "mo-notice-of-intent-1",
          "stage": "notice-of-intent",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a mechanic's lien asserted against residential real property under section 429.016, other than a lien for the repair, remodeling, or addition to owner-occupied residential property of four units or less",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mo-q4",
            "mo-q10"
          ]
        },
        {
          "id": "mo-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within six months after the indebtedness shall have accrued"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mo-q11"
          ]
        },
        {
          "id": "mo-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "No lien continues to exist under these sections for more than six months after it is filed unless an action is instituted on it within that time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mo-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is filed"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "For the repair or remodeling of, or addition to, owner-occupied residential property of four units or less, no one other than an original contractor has a lien unless a copy of a consent of owner, in the form section 429.013 sets and signed by an owner, is attached to the recording of the claim of lien. Without that consent, full payment to the contractor is a complete defense to those liens.",
          "quoteIds": [
            "mo-q13",
            "mo-q14",
            "mo-q15"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "An owner of residential real property who has contracted for work to facilitate its sale records a notice of intended sale not less than forty-five calendar days before the earliest date the owner intends to close. Recording a notice of rights does not extend the time for filing a mechanic's lien under section 429.080.",
          "quoteIds": [
            "mo-q16",
            "mo-q17",
            "mo-q18"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "mo-q19",
            "mo-q20"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "mo-q21"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "The first day of January",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The third Monday of January",
            "quoteId": "mo-q22",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The twelfth day of February",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The third Monday in February",
            "quoteId": "mo-q22",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The eighth day of May",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 5,
            "day": 8,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The last Monday in May",
            "quoteId": "mo-q22",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The nineteenth day of June",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The fourth day of July",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The first Monday in September",
            "quoteId": "mo-q22",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The second Monday in October",
            "quoteId": "mo-q22",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The eleventh day of November",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The fourth Thursday in November",
            "quoteId": "mo-q22",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The twenty-fifth of December",
            "quoteId": "mo-q22",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "mo-q22"
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien is filed",
          "input": "Lien filed with the circuit clerk on",
          "hint": "Leave empty if no lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "mo-0",
        "mo-1",
        "mo-2",
        "mo-3",
        "mo-4",
        "mo-5",
        "mo-6",
        "mo-7",
        "mo-8"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MS",
      "name": "Mississippi",
      "status": "verified",
      "releaseBatch": 3,
      "statute": "Miss. Code Ann. §§ 85-7-403 to 85-7-425",
      "statuteUrl": "https://www.lexisnexis.com/hottopics/mscode/",
      "summary": "Mississippi requires a claim of lien to be filed for record with the clerk of the chancery court within ninety days after the claimant's last work performed, labor, services or materials provided, and a payment action to be commenced within one hundred eighty days from the date the claim of lien is filed for record. A person without privity of contract with the contractor gives the contractor written notice within thirty days following its first delivery of labor, services or materials, except on single-family residential construction, where a claimant not in privity with the owner gives the owner a pre-lien notice at least ten days before filing a claim of lien.",
      "effectiveOrAmended": "The lien sections printed here, from the section that grants the special lien through section 85-7-425, were enacted by Laws 2014, chapter 487, effective from passage (approved April 11, 2014), and their history notes list no later amendment.",
      "quotes": [
        {
          "id": "ms-q1",
          "text": "(2) For any person having a right to a lien pursuant to Section 85-7-403 who does not have privity of contract with the contractor, or, if there is no contractor, with the owner, and is providing labor, services or materials for the improvement of property, within thirty (30) days following the first delivery of labor, services or materials to the property, the person shall give a written notice to the contractor, or, if there is no contractor, to the owner, either by e-mail with a confirmed receipt, registered or certified mail, or statutory overnight delivery setting forth the following:",
          "citation": "Miss. Code Ann. § 85-7-407(2)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q2",
          "text": "If the person not in privity of contract with the contractor fails to provide the required notice to the contractor, he shall thereby forfeit his right to a lien under this article.",
          "citation": "Miss. Code Ann. § 85-7-407(2)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q3",
          "text": "(4) The provisions of this section do not apply to single-family residential construction.",
          "citation": "Miss. Code Ann. § 85-7-407(4)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q4",
          "text": "(2) As to single-family residential construction only, as a condition precedent of any right to a special lien under Section 85-7-403 in favor of a subcontractor, materialman or design professional not in privity with the owner, the claimant must provide the owner a pre-lien written notice at least ten (10) days before filing a claim of lien under Section 85-7-405, which can be evidenced by any reliable means of delivery.",
          "citation": "Miss. Code Ann. § 85-7-409(2)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q5",
          "text": "(1) The following persons shall each have a special lien on the real estate or other property for which they furnish labor, services or materials:",
          "citation": "Miss. Code Ann. § 85-7-403(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q6",
          "text": "(a) All contractors, all subcontractors and all materialmen furnishing material for the improvement of real estate;",
          "citation": "Miss. Code Ann. § 85-7-403(1)(a)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q7",
          "text": "(2) Each special lien specified in subsection (1) of this section may attach to the real estate of the owner for which the labor, services or materials are furnished if they are furnished at the instance of the owner, design professional or contractor or a subcontractor having direct privity of contract with a contractor, and shall include the value of work done and labor, services or materials furnished.",
          "citation": "Miss. Code Ann. § 85-7-403(2)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q8",
          "text": "(1) To make good a lien created in Section 85-7-403(1), it must be created and declared in accordance with the following provisions, and on failure of any of them the lien shall not be effective or enforceable:",
          "citation": "Miss. Code Ann. § 85-7-405(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q9",
          "text": "(b) The filing for record of the claim of lien in the office of the clerk of the chancery court of the county where the property is located within ninety (90) days after the claimant’s last work performed, labor, services or materials provided, the furnishing of architectural services, or the furnishing or performing of surveying or engineering services.",
          "citation": "Miss. Code Ann. § 85-7-405(1)(b)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q10",
          "text": "No later than two (2) business days after the claim of lien is filed of record, the lien claimant shall send a true and accurate copy of the claim of lien by registered or certified mail or statutory overnight delivery to the owner of the property or, if the owner’s address cannot be found, the contractor, as the agent of the owner; if the property owner is an entity on file with the Secretary of State’s office, sending a copy of the claim of lien to the entity’s address or the registered agent’s address shall satisfy this requirement.",
          "citation": "Miss. Code Ann. § 85-7-405(1)(b)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q11",
          "text": "If the lien claimant is not the contractor, he shall also send a copy of the claim of lien within two (2) business days by registered or certified mail or statutory overnight delivery to the contractor or to the contractor’s registered agent.",
          "citation": "Miss. Code Ann. § 85-7-405(1)(b)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q12",
          "text": "(i) A payment action for the recovery of the amount of the lien claimant’s claim against the party he contracted with shall be commenced in county, circuit or chancery court within one hundred eighty (180) days from the date of filing for record of the lien claimant’s claim of lien.",
          "citation": "Miss. Code Ann. § 85-7-405(1)(c)(i)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q13",
          "text": "(1) Failure of a lien claimant to commence a payment action to collect the amount of his or her claim within one hundred eighty (180) days from the date of filing the lien renders the claim of lien unenforceable.",
          "citation": "Miss. Code Ann. § 85-7-421(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q14",
          "text": "(1) An owner or an owner’s agent or attorney, or the contractor or contractor’s agent or attorney, may elect to shorten the time prescribed in which to commence a payment action to enforce any claim of lien by recording in the chancery clerk’s office a notice in substantially the form set forth in Section 85-7-433(4), along with proof of delivery to the lien claimant.",
          "citation": "Miss. Code Ann. § 85-7-423(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q15",
          "text": "(3) The lien shall be extinguished by law upon the earlier of ninety (90) days after the filing of the notice of contest of lien, or one hundred eighty (180) days from the date of lien filing if no payment action is filed in that time period.",
          "citation": "Miss. Code Ann. § 85-7-423(3)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q16",
          "text": "(1) As to single-family residential construction only, payment made by or on behalf of the owner to a contractor or design professional in privity with the owner, for the work of a subcontractor, materialman, professional engineer or professional surveyor, shall be an absolute defense to any claim of lien made by the subcontractor, materialman, professional engineer or professional surveyor, (a) but only to the extent of the payment actually made by or on behalf of the owner to the contractor or design professional in privity with the owner, and (b) only to the extent the owner has not received a pre-lien notice in accordance with subsection (2) of this section before the payment.",
          "citation": "Miss. Code Ann. § 85-7-409(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q17",
          "text": "The computation of time under this article shall be determined pursuant to Section 1-3-67.",
          "citation": "Miss. Code Ann. § 85-7-425",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q18",
          "text": "When process shall be required to be served or notice given any number of days, the day of the act, event or default from which the designated period of time begins to run shall not be included.",
          "citation": "Miss. Code Ann. § 1-3-67",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q19",
          "text": "When the period of time prescribed or allowed is less than seven (7) days, intermediate Saturdays, Sundays and legal holidays shall be excluded in the computation.",
          "citation": "Miss. Code Ann. § 1-3-67",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q20",
          "text": "The last day of the period so computed shall be included unless it is a Saturday, a Sunday or a legal holiday, or any other day when the courthouse or the clerk’s office is in fact closed, whether with or without legal authority, in which event the period runs until the end of the next day which is not a Saturday, a Sunday, a legal holiday, or any other day when the courthouse or the clerk’s office is closed.",
          "citation": "Miss. Code Ann. § 1-3-67",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q21",
          "text": "(1) Except as otherwise provided in subsection (2) of this section, the following are declared to be legal holidays: the first day of January (New Year’s Day); the third Monday of January (Robert E. Lee’s birthday and Dr. Martin Luther King, Jr.’s birthday); the third Monday of February (Washington’s birthday); the last Monday of April (Confederate Memorial Day); the last Monday of May (National Memorial Day and Jefferson Davis’ birthday); the fourth day of July (Independence Day); the first Monday of September (Labor Day); the eleventh day of November (Armistice or Veterans’ Day); the day fixed by proclamation by the Governor of Mississippi as a day of Thanksgiving, which shall be fixed to correspond to the date proclaimed by the President of the United States (Thanksgiving Day); and the twenty-fifth day of December (Christmas Day).",
          "citation": "Miss. Code Ann. § 3-3-7(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q22",
          "text": "In the event any holiday hereinbefore declared legal shall fall on Sunday, then the next following day shall be a legal holiday.",
          "citation": "Miss. Code Ann. § 3-3-7(1)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "ms-q23",
          "text": "(2) In lieu of any one (1) legal holiday provided for in subsection (1) of this section, with the exception of the third Monday in January (Robert E. Lee’s birthday and Martin Luther King, Jr.’s birthday) and the eleventh day of November (Armistice or Veterans’ Day), the governing authorities of any municipality or county may declare, by order spread upon its minutes, Mardi Gras Day or any one (1) other day during the year, to be a legal holiday.",
          "citation": "Miss. Code Ann. § 3-3-7(2)",
          "url": "https://www.lexisnexis.com/hottopics/mscode/",
          "sourceId": "ms-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ms-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who does not have privity of contract with the contractor, or, if there is no contractor, with the owner, except on single-family residential construction",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "A person that fails to give the notice forfeits its right to a lien under the article.",
          "recipients": [
            "The contractor or, if there is no contractor, the owner"
          ],
          "delivery": "By e-mail with a confirmed receipt, registered or certified mail, or statutory overnight delivery.",
          "quoteIds": [
            "ms-q1",
            "ms-q2",
            "ms-q3"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the first delivery of labor, services or materials to the property"
            }
          ]
        },
        {
          "id": "ms-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "As to single-family residential construction only, for a subcontractor, materialman or design professional not in privity with the owner",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "A pre-lien written notice at least ten (10) days before filing a claim of lien"
          },
          "consequence": "The notice is a condition precedent of any right to a special lien for that claimant.",
          "recipients": [
            "The owner"
          ],
          "delivery": "Any reliable means of delivery may evidence it.",
          "quoteIds": [
            "ms-q4"
          ]
        },
        {
          "id": "ms-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "On failure of any of the provisions of section 85-7-405(1), the lien is not effective or enforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ms-q5",
            "ms-q6",
            "ms-q7",
            "ms-q8",
            "ms-q9"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant's last work was performed, or its last labor, services or materials were provided"
            }
          ]
        },
        {
          "id": "ms-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "No later than two (2) business days after the claim of lien is filed of record"
          },
          "consequence": null,
          "recipients": [
            "The owner of the property or, if the owner's address cannot be found, the contractor as the owner's agent",
            "The contractor or the contractor's registered agent as well, if the lien claimant is not the contractor"
          ],
          "delivery": "By registered or certified mail or statutory overnight delivery.",
          "quoteIds": [
            "ms-q10",
            "ms-q11"
          ]
        },
        {
          "id": "ms-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": "Failure to commence a payment action within that time renders the claim of lien unenforceable.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ms-q12",
            "ms-q13",
            "ms-q14",
            "ms-q15"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed for record"
            }
          ],
          "mayChangeIf": "a notice of contest of lien is recorded under Section 85-7-423"
        }
      ],
      "residential": [
        {
          "text": "On single-family residential construction only, payment by or for the owner to a contractor or design professional in privity with the owner, for the work of a subcontractor, materialman, professional engineer or professional surveyor, is an absolute defense to that claimant's lien, to the extent of the payment and only to the extent the owner had not received a pre-lien notice before the payment.",
          "quoteIds": [
            "ms-q16"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ms-q17",
            "ms-q18",
            "ms-q19"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ms-q20"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "Robert E. Lee's birthday and Dr. Martin Luther King, Jr.'s birthday",
            "quoteId": "ms-q21",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Armistice or Veterans' Day",
            "quoteId": "ms-q21",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ms-q21",
          "ms-q22",
          "ms-q23"
        ],
        "closure": {
          "clause": "when the courthouse or the clerk's office is in fact closed, whether with or without legal authority",
          "place": "the courthouse or the clerk's office",
          "quoteIds": [
            "ms-q20"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "New Year's Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Washington's birthday",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Confederate Memorial Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "the last Monday of May (National Memorial Day and Jefferson Davis' birthday)",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Independence Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Labor Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Thanksgiving Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          },
          {
            "name": "Christmas Day",
            "reason": "Miss. Code Ann. § 3-3-7(2) lets the governing authorities of any municipality or county declare another day a legal holiday in lieu of any one of them"
          }
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is filed for record",
          "input": "Claim of lien filed for record on",
          "hint": "Leave empty if no claim of lien has been filed for record."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ms-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "MT",
      "name": "Montana",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "Mont. Code Ann. tit. 71, ch. 3, pt. 5",
      "statuteUrl": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0350/0710-0030-0050-0350.html",
      "summary": "Montana gives a person 90 days after the person's final furnishing of services or materials, or after the owner files a notice of completion, to file a lien with the county clerk and recorder, and all actions under the construction lien part must be commenced within 2 years from the date of the filing of the lien. Outside the exceptions in § 71-3-531(1), the notice of the right to claim a lien is given to the contracting owner no later than 20 days after the services or materials are first furnished, or 45 days where funds from a regulated lender pay for the improvement, except on an owner-occupied residence.",
      "effectiveOrAmended": "Section 71-3-531 was last amended by Ch. 182, L. 2009, section 71-3-533 by Ch. 56, L. 2009, section 71-3-534 by Ch. 130, L. 2005 and section 71-3-535 by Ch. 357, L. 1999. Section 71-3-562 was redesignated by the Code Commissioner in 1987, and section 1-1-216 was last amended by Ch. 561, L. 2025.",
      "quotes": [
        {
          "id": "mt-q1",
          "text": "(2) A person who may claim a construction lien pursuant to this part shall give notice of the right to claim a lien to the contracting owner in order to claim a lien.",
          "citation": "Mont. Code Ann. § 71-3-531(2)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q2",
          "text": "(3) Except as provided in subsection (4), the notice may not be given later than 20 days after the date on which the services or materials are first furnished to the contracting owner.",
          "citation": "Mont. Code Ann. § 71-3-531(3)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q3",
          "text": "If notice is not given within this period, a lien is enforceable only for the services or materials furnished within the 20-day period before the date on which notice is given.",
          "citation": "Mont. Code Ann. § 71-3-531(3)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q4",
          "text": "(5) The notice of the right to claim a lien must be sent to the contracting owner by certified mail or delivered personally to the owner.",
          "citation": "Mont. Code Ann. § 71-3-531(5)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q5",
          "text": "Notice by certified mail is effective on the date on which the notice is mailed.",
          "citation": "Mont. Code Ann. § 71-3-531(5)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q6",
          "text": "If the notice is delivered personally to the contracting owner, written acknowledgment of receipt must be obtained from the contracting owner.",
          "citation": "Mont. Code Ann. § 71-3-531(5)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q7",
          "text": "A person may not claim a construction lien unless the person has complied with this subsection.",
          "citation": "Mont. Code Ann. § 71-3-531(5)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q8",
          "text": "(4) When payment for services or materials furnished pursuant to a real estate improvement contract, excluding a contract on an owner-occupied residence, is made by or on behalf of the contracting owner from funds provided by a regulated lender and secured by an interest, lien, mortgage, or encumbrance for the purpose of paying the particular real estate improvement being liened, the notice required by this section may not be given later than 45 days after the date on which the services or materials are first furnished to the contracting owner.",
          "citation": "Mont. Code Ann. § 71-3-531(4)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q9",
          "text": "If notice is not given within this period, a lien is enforceable only for the services or materials furnished within the 45-day period before the date on which notice is given.",
          "citation": "Mont. Code Ann. § 71-3-531(4)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q10",
          "text": "(1) The following are not required to give notice of the right to claim a lien as required by this section: (a) an original contractor who furnishes services or materials directly to the owner at the owner's request; (b) a wage earner or laborer who performs personal labor services for a person furnishing any service or material pursuant to a real estate improvement contract; (c) a person who furnishes services or materials pursuant to a real estate improvement contract that relates to a dwelling for five or more families; and (d) a person who furnishes services or materials pursuant to a real estate improvement contract that relates to an improvement that is partly or wholly commercial in character.",
          "citation": "Mont. Code Ann. § 71-3-531(1)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q11",
          "text": "(6) (a) A person who may claim a lien shall also file with the clerk and recorder of the county in which the improved real estate is located a copy of the notice of the right to claim a lien, in the form required by 71-3-532.",
          "citation": "Mont. Code Ann. § 71-3-531(6)(a)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q12",
          "text": "This copy may not be filed later than 5 business days after the date on which the notice of the right to claim a lien is given to the contracting owner.",
          "citation": "Mont. Code Ann. § 71-3-531(6)(a)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q13",
          "text": "(e) If a notice of the right to claim a lien is required under this section, a person may not claim a construction lien pursuant to this part unless there is an unexpired notice of right to claim a construction lien or an unexpired continuation notice filed with the clerk and recorder at the time that the person files the lien.",
          "citation": "Mont. Code Ann. § 71-3-531(6)(e)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0310/0710-0030-0050-0310.html",
          "sourceId": "mt-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q14",
          "text": "(1) A person's lien does not attach and may not be enforced unless, after entering into the contract under which the lien arises, the person has filed a lien not later than 90 days after: (a) the person's final furnishing of services or materials; or (b) the owner files a notice of completion pursuant to 71-3-533.",
          "citation": "Mont. Code Ann. § 71-3-535(1)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0350/0710-0030-0050-0350.html",
          "sourceId": "mt-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q15",
          "text": "(2) (a) The lien must be filed with the county clerk and recorder of the county in which the improved real estate is located, and the county clerk and recorder may allow the lien to be filed electronically.",
          "citation": "Mont. Code Ann. § 71-3-535(2)(a)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0350/0710-0030-0050-0350.html",
          "sourceId": "mt-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q16",
          "text": "(1) The contracting owner may file a notice of completion at any time after the completion of any work or improvement.",
          "citation": "Mont. Code Ann. § 71-3-533(1)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0330/0710-0030-0050-0330.html",
          "sourceId": "mt-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q17",
          "text": "(2) The clerk may not file the lien unless it is accompanied by a certification by the lien claimant or the claimant's agent that a copy of the lien has been served upon each owner of record of the property named in the lien.",
          "citation": "Mont. Code Ann. § 71-3-534(2)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0340/0710-0030-0050-0340.html",
          "sourceId": "mt-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q18",
          "text": "Service must be made by personal service on each owner or by mailing a copy of the lien by certified mail with return receipt requested to each owner's last-known address.",
          "citation": "Mont. Code Ann. § 71-3-534(2)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0340/0710-0030-0050-0340.html",
          "sourceId": "mt-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q19",
          "text": "All actions under this part must be commenced within 2 years from the date of the filing of the lien.",
          "citation": "Mont. Code Ann. § 71-3-562",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0620/0710-0030-0050-0620.html",
          "sourceId": "mt-4",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q20",
          "text": "(2) The following acts or events constitute completion of any work or improvement for the purpose of filing a notice of completion: (a) the written acceptance by the contracting owner, the contracting owner's agent, or the representative of the building, improvement, or structure. The filing of a notice of completion may not be considered as an acceptance of the building, improvement, or other structure. (b) the cessation from labor for 30 days upon any building, improvement, or structure or the alteration, addition to, or repair of the building, improvement, or structure.",
          "citation": "Mont. Code Ann. § 71-3-533(2)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0330/0710-0030-0050-0330.html",
          "sourceId": "mt-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q21",
          "text": "(5) A copy of the notice of completion must be published once each week for 3 successive weeks in a newspaper of general circulation in the county where the land on which the work or improvement was performed is situated.",
          "citation": "Mont. Code Ann. § 71-3-533(5)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0330/0710-0030-0050-0330.html",
          "sourceId": "mt-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q22",
          "text": "(6) The contracting owner shall give a copy of the notice of completion to any person who has given the contracting owner a notice of a right to claim a lien.",
          "citation": "Mont. Code Ann. § 71-3-533(6)",
          "url": "https://mca.legmt.gov/bills/mca/title_0710/chapter_0030/part_0050/section_0330/0710-0030-0050-0330.html",
          "sourceId": "mt-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q23",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day and including the last unless the last day is a holiday, and then it is also excluded.",
          "citation": "Mont. Code Ann. § 1-1-306",
          "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0060/0010-0010-0030-0060.html",
          "sourceId": "mt-5",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q24",
          "text": "(1) The following are legal holidays in the state of Montana: (a) each Sunday; (b) New Year's Day, January 1; (c) Martin Luther King Jr. Day, the third Monday in January; (d) Presidents' Day, the third Monday in February; (e) Memorial Day, the last Monday in May; (f) Independence Day, July 4; (g) Labor Day, the first Monday in September; (h) Indigenous Peoples' Day and Columbus Day, the second Monday in October; (i) Veterans' Day, November 11; (j) Thanksgiving Day, the fourth Thursday in November; (k) Christmas Day, December 25; (l) state general election day.",
          "citation": "Mont. Code Ann. § 1-1-216(1)",
          "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0020/section_0160/0010-0010-0020-0160.html",
          "sourceId": "mt-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q25",
          "text": "(2) (a) If any of the holidays in subsections (1)(b) through (1)(l) fall on a Sunday, the Monday following is a holiday.",
          "citation": "Mont. Code Ann. § 1-1-216(2)(a)",
          "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0020/section_0160/0010-0010-0020-0160.html",
          "sourceId": "mt-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q26",
          "text": "(b) If any of the holidays in subsections (1)(b) through (1)(l) fall on a Saturday, the Friday preceding is a holiday.",
          "citation": "Mont. Code Ann. § 1-1-216(2)(b)",
          "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0020/section_0160/0010-0010-0020-0160.html",
          "sourceId": "mt-6",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "mt-q27",
          "text": "Whenever any act of a secular nature, other than a work of necessity or mercy, is appointed by law or contract to be performed upon a particular day, which day falls upon a holiday or a Saturday, such act may be performed upon the next business day with the same effect as if it had been performed upon the day appointed.",
          "citation": "Mont. Code Ann. § 1-1-307",
          "url": "https://mca.legmt.gov/bills/mca/title_0010/chapter_0010/part_0030/section_0070/0010-0010-0030-0070.html",
          "sourceId": "mt-7",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "mt-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "If notice is not given within this period, a lien is enforceable only for the services or materials furnished within the 20-day period before the date on which notice is given. A person may not claim a construction lien unless the person has complied with subsection (5).",
          "recipients": [
            "The contracting owner"
          ],
          "delivery": "Sent to the contracting owner by certified mail, effective on the date it is mailed, or delivered personally to the owner, with written acknowledgment of receipt obtained from the contracting owner.",
          "quoteIds": [
            "mt-q1",
            "mt-q2",
            "mt-q3",
            "mt-q4",
            "mt-q5",
            "mt-q6",
            "mt-q7"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the services or materials are first furnished to the contracting owner"
            }
          ]
        },
        {
          "id": "mt-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "When payment is made by or on behalf of the contracting owner from funds provided by a regulated lender and secured by an interest, lien, mortgage, or encumbrance for the purpose of paying the particular real estate improvement being liened, excluding a contract on an owner-occupied residence",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 45
            }
          },
          "notComputed": null,
          "consequence": "If notice is not given within this period, a lien is enforceable only for the services or materials furnished within the 45-day period before the date on which notice is given.",
          "recipients": [
            "The contracting owner"
          ],
          "delivery": "Sent to the contracting owner by certified mail, effective on the date it is mailed, or delivered personally to the owner, with written acknowledgment of receipt obtained from the contracting owner.",
          "quoteIds": [
            "mt-q8",
            "mt-q9",
            "mt-q4",
            "mt-q5",
            "mt-q6"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the services or materials are first furnished to the contracting owner"
            }
          ]
        },
        {
          "id": "mt-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mt-q10"
          ]
        },
        {
          "id": "mt-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where the real estate improvement contract relates to a dwelling for five or more families or to an improvement described in § 71-3-531(1)(d)",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mt-q10"
          ]
        },
        {
          "id": "mt-preliminary-notice-4",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If a notice of the right to claim a lien is required under § 71-3-531, a copy of the notice filed with the county clerk and recorder",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Not later than 5 business days after the date on which the notice of the right to claim a lien is given to the contracting owner"
          },
          "consequence": "A person may not claim a construction lien unless there is an unexpired notice of right to claim a construction lien or an unexpired continuation notice filed with the clerk and recorder at the time that the person files the lien.",
          "recipients": null,
          "delivery": "Filed with the clerk and recorder of the county in which the improved real estate is located.",
          "quoteIds": [
            "mt-q11",
            "mt-q12",
            "mt-q13"
          ]
        },
        {
          "id": "mt-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "A person's lien does not attach and may not be enforced unless, after entering into the contract under which the lien arises, the person has filed it within that time.",
          "recipients": null,
          "delivery": "Filed with the county clerk and recorder of the county in which the improved real estate is located.",
          "quoteIds": [
            "mt-q14",
            "mt-q15"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person's final furnishing of services or materials"
            }
          ],
          "mayChangeIf": "the owner files a notice of completion pursuant to 71-3-533"
        },
        {
          "id": "mt-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If the owner files a notice of completion pursuant to 71-3-533",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": "Filed with the county clerk and recorder of the county in which the improved real estate is located.",
          "quoteIds": [
            "mt-q14",
            "mt-q15",
            "mt-q16"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "the owner files a notice of completion"
            }
          ]
        },
        {
          "id": "mt-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before the clerk files the lien"
          },
          "consequence": "The clerk may not file the lien unless it is accompanied by a certification by the lien claimant or the claimant's agent that a copy of the lien has been served upon each owner of record.",
          "recipients": [
            "Each owner of record of the property named in the lien"
          ],
          "delivery": "By personal service on each owner or by mailing a copy of the lien by certified mail with return receipt requested to each owner's last-known address.",
          "quoteIds": [
            "mt-q17",
            "mt-q18"
          ]
        },
        {
          "id": "mt-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "mt-q19"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is filed"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "The 45-day period, which applies where funds provided by a regulated lender pay for the particular real estate improvement, excludes a contract on an owner-occupied residence.",
          "quoteIds": [
            "mt-q8"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "The contracting owner may file a notice of completion at any time after the completion of any work or improvement. For that purpose, completion is the written acceptance of the building, improvement, or structure by the contracting owner, the contracting owner's agent, or the representative, or the cessation from labor upon it for 30 days.",
          "quoteIds": [
            "mt-q16",
            "mt-q20"
          ]
        },
        {
          "text": "A copy of the notice of completion is published once each week for 3 successive weeks in a newspaper of general circulation in the county, and the contracting owner gives a copy to any person who has given the contracting owner a notice of a right to claim a lien.",
          "quoteIds": [
            "mt-q21",
            "mt-q22"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "mt-q23"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "mt-q23",
            "mt-q24"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "mt-q24",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King Jr. Day",
            "quoteId": "mt-q24",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "mt-q24",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "mt-q24",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "mt-q24",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "mt-q24",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Indigenous Peoples' Day and Columbus Day",
            "quoteId": "mt-q24",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "mt-q24",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "mt-q24",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "mt-q24",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "mt-q24",
          "mt-q25",
          "mt-q26"
        ],
        "conditionalMove": {
          "day": "saturday",
          "condition": "when an act is appointed by law or contract to be performed upon that day",
          "unknown": "whether the last day of a lien deadline is a day so appointed",
          "quoteIds": [
            "mt-q27"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "state general election day",
            "reason": "Mont. Code Ann. § 1-1-216(1)(l) names it without stating its date"
          }
        ]
      },
      "eventWording": [
        {
          "event": "first-furnishing",
          "clause": "the services or materials are first furnished to the contracting owner",
          "input": "Services or materials first furnished on",
          "hint": null
        },
        {
          "event": "last-furnishing",
          "clause": "the person's final furnishing of services or materials",
          "input": "Final furnishing of services or materials on",
          "hint": null
        },
        {
          "event": "notice-of-completion",
          "clause": "the owner files a notice of completion",
          "input": "Notice of completion filed on",
          "hint": "Leave empty if the owner has not filed a notice of completion."
        },
        {
          "event": "lien-recorded",
          "clause": "the lien is filed",
          "input": "Lien filed on",
          "hint": "Leave empty if no lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "mt-0",
        "mt-1",
        "mt-2",
        "mt-3",
        "mt-4",
        "mt-5",
        "mt-6",
        "mt-7"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NC",
      "name": "North Carolina",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "N.C. Gen. Stat. ch. 44A, art. 2",
      "statuteUrl": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
      "summary": "North Carolina counts both the claim of lien and the action to enforce it from the claimant's last furnishing at the site: 120 days to file the claim and 180 days to sue. Where the owner must designate a lien agent, a claimant gives the lien agent notice within 15 days after first furnishing.",
      "effectiveOrAmended": "Section 44A-11.2 was last amended by S.L. 2025-25; sections 44A-11, 44A-12 and 44A-13 by S.L. 2012-175.",
      "quotes": [
        {
          "id": "nc-q1",
          "text": "The lien agent identified in accordance with this section has received a Notice to Lien Agent from the potential lien claimant no later than 15 days after the first furnishing of labor or materials by the potential lien claimant.",
          "citation": "N.C. Gen. Stat. § 44A-11.2(l)(1)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q2",
          "text": "for which the costs of the undertaking are forty thousand dollars ($40,000) or more",
          "citation": "N.C. Gen. Stat. § 44A-11.1(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q3",
          "text": "Provided, however, that the owner is not required to designate a lien agent for improvements to an existing single‑family residential dwelling unit as defined in G.S. 87‑15.5(7) that is occupied by the owner as a residence",
          "citation": "N.C. Gen. Stat. § 44A-11.1(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q4",
          "text": "(2) Any of the following conditions is met: a. The lien agent identified in accordance with this section has received a Notice to Lien Agent from the potential lien claimant prior to the date of recordation of a conveyance of the property interest in the real property to a bona fide purchaser for value protected under G.S. 47‑18 who is not an affiliate, relative, or insider of the owner. b. The potential lien claimant has perfected its claim of lien on real property pursuant to G.S. 44A‑11 prior to the recordation of a conveyance of the property interest in the real property to a bona fide purchaser for value protected under G.S. 47‑18 who is not an affiliate, relative, or insider of the owner.",
          "citation": "N.C. Gen. Stat. § 44A-11.2(l)(2)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q5",
          "text": "Claims of lien on real property may be filed at any time after the maturity of the obligation secured thereby but not later than 120 days after the last furnishing of labor or materials at the site of the improvement by the person claiming the lien.",
          "citation": "N.C.G.S. § 44A-12(b)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q6",
          "text": "No such action may be commenced later than 180 days after the last furnishing of labor or materials at the site of the improvement by the person claiming the claim of lien on real property.",
          "citation": "N.C.G.S. § 44A-13(a)",
          "url": "https://web.archive.org/web/20260517205913id_/https://www.ncleg.gov/EnactedLegislation/Statutes/PDF/ByArticle/Chapter_44A/Article_2.pdf",
          "sourceId": "nc-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-17"
        },
        {
          "id": "nc-q7",
          "text": "The time within which an act is to be done, as provided by law, shall be computed in the manner prescribed by Rule 6(a) of the Rules of Civil Procedure.",
          "citation": "N.C. Gen. Stat. § 1-593",
          "url": "https://web.archive.org/web/20260311222231id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1/GS_1-593.html",
          "sourceId": "nc-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-11"
        },
        {
          "id": "nc-q8",
          "text": "In computing any period of time prescribed or allowed by these rules, by order of court, or by any applicable statute, including rules, orders or statutes respecting publication of notices, the day of the act, event, default or publication after which the designated period of time begins to run is not to be included.",
          "citation": "N.C. Gen. Stat. § 1A-1, Rule 6(a)",
          "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
          "sourceId": "nc-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "nc-q9",
          "text": "The last day of the period so computed is to be included, unless it is a Saturday, Sunday or a legal holiday when the courthouse is closed for transactions, in which event the period runs until the end of the next day which is not a Saturday, Sunday, or a legal holiday when the courthouse is closed for transactions.",
          "citation": "N.C. Gen. Stat. § 1A-1, Rule 6(a)",
          "url": "https://web.archive.org/web/20260614192716id_/https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_1A/GS_1A-1,_Rule_6.html",
          "sourceId": "nc-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "nc-q10",
          "text": "Except as otherwise provided by law, when the day or the last day for doing any act required or permitted by law to be performed in a public office or courthouse falls on a Saturday, Sunday, or legal holiday when the public office or courthouse is closed for transactions, the act may be performed on the next day that the public office or courthouse is open for transactions.",
          "citation": "N.C. Gen. Stat. § 103-5(a)",
          "url": "https://web.archive.org/web/20250620225922id_/https://ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_103/GS_103-5.html",
          "sourceId": "nc-3",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2025-06-20"
        }
      ],
      "rules": [
        {
          "id": "nc-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where the owner must designate a lien agent: improvements costing $40,000 or more, other than improvements to an existing single-family residential dwelling unit occupied by the owner as a residence",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "A claimant may perfect a claim of lien on real property only if the lien agent received the notice within this time, or if the lien agent received it, or the claimant perfected its lien, before a conveyance to a bona fide purchaser for value is recorded.",
          "recipients": [
            "The lien agent"
          ],
          "delivery": null,
          "quoteIds": [
            "nc-q1",
            "nc-q2",
            "nc-q3",
            "nc-q4"
          ]
        },
        {
          "id": "nc-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nc-q5"
          ]
        },
        {
          "id": "nc-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nc-q6"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "nc-q7",
            "nc-q8"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": false,
          "appliesTo": "all",
          "quoteIds": [
            "nc-q9"
          ]
        },
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": [],
        "closure": {
          "clause": "that is a legal holiday when the courthouse is closed for transactions",
          "place": "the courthouse",
          "quoteIds": [
            "nc-q9",
            "nc-q10"
          ]
        }
      },
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-01",
      "publishable": true,
      "sourceIds": [
        "nc-0",
        "nc-1",
        "nc-2",
        "nc-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "ND",
      "name": "North Dakota",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "N.D.C.C. ch. 35-27",
      "statuteUrl": "https://ndlegis.gov/cencode/t35c27.pdf",
      "summary": "North Dakota requires written notice that a lien will be claimed, given to the legal or equitable owner by certified mail at least ten days before the construction lien is recorded, and the lien to be recorded within ninety days after all the person's contribution is done, never more than three years after the first item of material is furnished. A failure to file within ninety days does not defeat the lien except as against purchasers or encumbrancers in good faith and for value whose rights accrue before the lien is filed and as against the owner to the extent of amounts paid to a contractor before recording, and a lien is not enforceable unless the lienor commences an action and records a lis pendens within three years after the lien is recorded.",
      "effectiveOrAmended": null,
      "quotes": [
        {
          "id": "nd-q1",
          "text": "Any person that improves real estate under a contract with the owner of the real estate or under contract with any agent, trustee, contractor, or subcontractor of the owner, has a lien upon the improvement and upon the land on which the improvement is situated or to which the improvement may be removed for the price or value of the contribution.",
          "citation": "N.D.C.C. § 35-27-02(1)",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q2",
          "text": "Every person desiring to perfect the person's lien shall record with the recorder of the county in which the property to be charged with the lien is situated, within ninety days after all the person's contribution is done, and having complied with the provisions of this chapter, a lien describing the property and stating the amount due, the dates of the first and last contribution, and the person with which the claimant contracted.",
          "citation": "N.D.C.C. § 35-27-13",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q3",
          "text": "In addition to the lien provided by this chapter, but subject to the conditions of section 35-27-02, when material is furnished or labor performed in the erection or construction of an original, complete, and independent building, structure, or improvement, whether the same is placed upon a foundation or not, the lien attaches to the building or improvement in preference to any prior title, claim, lien, encumbrance, or mortgage upon the land upon which the building, erection, or improvement is erected.",
          "citation": "N.D.C.C. § 35-27-21",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q4",
          "text": "At the time the material is furnished for such improvement, the seller shall notify the purchaser by delivering to the purchaser a written notice stating that the seller claims the right to foreclose the lien under",
          "citation": "N.D.C.C. § 35-27-21",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q5",
          "text": "the laws of the state, and in the event that there is a default in payment for the improvement, to remove the building from the real estate upon which it is placed regardless of whether or not said building is placed upon a foundation.",
          "citation": "N.D.C.C. § 35-27-21",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q6",
          "text": "Written notice a lien will be claimed must be given to the legal or",
          "citation": "N.D.C.C. § 35-27-02(4)",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q7",
          "text": "equitable owner of the real estate by certified mail at least ten days before the recording of the construction lien.",
          "citation": "N.D.C.C. § 35-27-02(4)",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q8",
          "text": "Before a lienholder may enforce a lien, the lienholder shall give written notice of the lienholder's intention so to do, which notice must be given by personal service upon the legal or equitable owner of the property affected at least ten days before an action to enforce the lien is commenced, or by registered mail directed to the owner's last-known address at least twenty days before the action is commenced.",
          "citation": "N.D.C.C. § 35-27-24",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q9",
          "text": "A failure to file within ninety days does not defeat the lien except as against purchasers or encumbrancers in good faith and for value whose rights accrue before the lien is filed, and as against the owner to the extent of the amount paid to a contractor before the recording of the lien.",
          "citation": "N.D.C.C. § 35-27-14",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q10",
          "text": "A lien may not be filed more than three years after the date of the first item of material is furnished.",
          "citation": "N.D.C.C. § 35-27-14",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q11",
          "text": "A lien is not valid, effective, nor enforceable, unless the lienor commences an action and records with the county recorder a lis pendens within three years after the date of recording of the lien.",
          "citation": "N.D.C.C. § 35-27-25",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q12",
          "text": "If a lis pendens is not recorded within the limitations provided by this section, the lien is deemed satisfied.",
          "citation": "N.D.C.C. § 35-27-25",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q13",
          "text": "Upon written demand by or on behalf of the owner which has been delivered to the lienor and filed with the county recorder, suit must be commenced and filed and a lis pendens as provided in chapter 28-05 must be recorded within thirty days after the date of delivery of the demand or the lien is forfeited.",
          "citation": "N.D.C.C. § 35-27-25",
          "url": "https://ndlegis.gov/cencode/t35c27.pdf",
          "sourceId": "nd-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q14",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day and including the last, unless the last is a holiday, and then it also is excluded.",
          "citation": "N.D.C.C. § 1-02-15",
          "url": "https://ndlegis.gov/cencode/t01c02.pdf",
          "sourceId": "nd-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q15",
          "text": "Holidays are as follows: 1. Every Sunday. 2. The first day of January, which is New Year's Day. 3. The third Monday of January, which is Martin Luther King Day, in recognition of the life, legacy, and dream of Martin Luther King, Jr. 4. The third Monday in February, in recognition of the birthday of George Washington. 5. The Friday next preceding Easter Sunday and commonly known as Good Friday. 6. The last Monday in May, which is Memorial Day. 7. The fourth day of July, which is the anniversary of the Declaration of Independence. 8. The first Monday in September, which is Labor Day. 9. The eleventh day of November, which is Veterans' Day. 10. The fourth Thursday in November, which is Thanksgiving Day. 11. The twenty-fifth day of December, which is Christmas Day. 12. Every day appointed by the President of the United States or by the governor of this state for a public holiday.",
          "citation": "N.D.C.C. § 1-03-01",
          "url": "https://ndlegis.gov/cencode/t01c03.pdf",
          "sourceId": "nd-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q16",
          "text": "If the first day of January, the fourth day of July, the eleventh day of November, or the twenty-fifth day of December falls upon a Sunday, the Monday following shall be the holiday.",
          "citation": "N.D.C.C. § 1-03-02",
          "url": "https://ndlegis.gov/cencode/t01c03.pdf",
          "sourceId": "nd-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q17",
          "text": "If any of the holidays enumerated in section 1-03-02 fall on a Saturday, the Friday immediately before shall be the holiday.",
          "citation": "N.D.C.C. § 1-03-02.1",
          "url": "https://ndlegis.gov/cencode/t01c03.pdf",
          "sourceId": "nd-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nd-q18",
          "text": "Whenever an act of a secular nature, other than a work of necessity or mercy, is appointed by law or contract to be performed upon a particular day, that falls upon a Saturday or a holiday, the act may be performed upon the next business day with the same effect as if it had been performed upon the day appointed.",
          "citation": "N.D.C.C. § 1-03-05",
          "url": "https://ndlegis.gov/cencode/t01c03.pdf",
          "sourceId": "nd-2",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "nd-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nd-q1",
            "nd-q2"
          ]
        },
        {
          "id": "nd-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the seller, when material is furnished for an original, complete, and independent building, structure, or improvement",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "At the time the material is furnished for such improvement"
          },
          "consequence": null,
          "recipients": [
            "The purchaser"
          ],
          "delivery": "A written notice delivered to the purchaser stating that the seller claims the right to foreclose the lien under the laws of the state and, in the event of a default in payment for the improvement, to remove the building from the real estate",
          "quoteIds": [
            "nd-q3",
            "nd-q4",
            "nd-q5"
          ]
        },
        {
          "id": "nd-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At least ten days before the recording of the construction lien"
          },
          "consequence": null,
          "recipients": [
            "The legal or equitable owner of the real estate"
          ],
          "delivery": "Certified mail",
          "quoteIds": [
            "nd-q6",
            "nd-q7"
          ]
        },
        {
          "id": "nd-notice-of-intent-1",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At least ten days before an action to enforce the lien is commenced, by personal service, or at least twenty days before, by registered mail"
          },
          "consequence": null,
          "recipients": [
            "The legal or equitable owner of the property affected"
          ],
          "delivery": "Personal service, or registered mail directed to the owner's last-known address",
          "quoteIds": [
            "nd-q8"
          ]
        },
        {
          "id": "nd-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "A failure to file within ninety days does not defeat the lien except as against purchasers or encumbrancers in good faith and for value whose rights accrue before the lien is filed, and as against the owner to the extent of the amount paid to a contractor before the recording of the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nd-q2",
            "nd-q9"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "all the person's contribution is done"
            }
          ]
        },
        {
          "id": "nd-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "years",
              "n": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nd-q10"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the first item of material is furnished"
            }
          ]
        },
        {
          "id": "nd-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 3
            }
          },
          "notComputed": null,
          "consequence": "If a lis pendens is not recorded within that time, the lien is deemed satisfied.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nd-q11",
            "nd-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien is recorded"
            }
          ]
        },
        {
          "id": "nd-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Upon written demand by or on behalf of the owner, delivered to the lienor and filed with the county recorder",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within thirty days after the date of delivery of the demand"
          },
          "consequence": "If suit is not commenced and filed and a lis pendens recorded within that time, the lien is forfeited.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nd-q13"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "nd-q14"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "nd-q14",
            "nd-q15"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "nd-q15",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King Day",
            "quoteId": "nd-q15",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The third Monday in February",
            "quoteId": "nd-q15",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "nd-q15",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The fourth day of July",
            "quoteId": "nd-q15",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "nd-q15",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "nd-q15",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "nd-q15",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "nd-q15",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "nd-q15",
          "nd-q16",
          "nd-q17"
        ],
        "conditionalMove": {
          "day": "saturday",
          "condition": "when the act is one appointed by law or contract to be performed upon a particular day",
          "unknown": "whether the act at this stage is one so appointed",
          "quoteIds": [
            "nd-q18"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "N.D.C.C. § 1-03-01 sets it as the Friday next preceding Easter Sunday, whose date changes each year"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "all the person's contribution is done",
          "input": "All of the person's contribution done on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the lien is recorded",
          "input": "Lien recorded with the county recorder on",
          "hint": null
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "nd-0",
        "nd-1",
        "nd-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NE",
      "name": "Nebraska",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "Neb. Rev. Stat. §§ 52-125 to 52-159",
      "statuteUrl": "https://web.archive.org/web/20260614002359id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-137",
      "summary": "Nebraska gives a claimant 120 days after the claimant's final furnishing of services or materials to record a lien, which continues enforceable for two years after it is recorded, and during a judicial proceeding to enforce it instituted while it is effective, but after a written demand to institute a judicial proceeding it lapses unless, within thirty days after receiving the demand, the claimant institutes judicial proceedings or records an affidavit that the total contract price is not yet due. The notice of the right to assert a lien is optional, and § 52-135, under which the claimant sends the contracting owner a copy of a recorded lien within ten days after recording, applies only when the contracting owner is a party described in § 52-129(1).",
      "effectiveOrAmended": "Sections 52-135 and 52-136 were last amended by Laws 2003, LB 655. Sections 52-129, 52-137 and 52-140 date from Laws 1981, LB 512. Section 25-2221 was last amended by Laws 2022, LB29.",
      "quotes": [
        {
          "id": "ne-q1",
          "text": "(1) At any time after a claimant has entered into the contract under which he or she may claim a lien under the Nebraska Construction Lien Act, he or she may give notice of the right to assert a lien to the contracting owner.",
          "citation": "Neb. Rev. Stat. § 52-135(1)",
          "url": "https://web.archive.org/web/20260614013143id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-135",
          "sourceId": "ne-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q2",
          "text": "(6) This section shall apply to a lien claimant only when the contracting owner is a protected party.",
          "citation": "Neb. Rev. Stat. § 52-135(6)",
          "url": "https://web.archive.org/web/20260614013143id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-135",
          "sourceId": "ne-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q3",
          "text": "(2) Except as modified by subsections (4) and (5) of this section, as against a protected party contracting owner, the lien of a claimant other than a prime contractor is for the lesser of: (a) The amount unpaid under the claimant's contract; or (b) The amount unpaid under the prime contract through which the claimant claims at the time the contracting owner receives the claimant's notice of the right to assert a lien.",
          "citation": "Neb. Rev. Stat. § 52-136(2)",
          "url": "https://web.archive.org/web/20260411055309id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-136",
          "sourceId": "ne-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "ne-q4",
          "text": "(1) A claimant's lien does not attach and may not be enforced unless, after entering into the contract under which the lien arises and not later than one hundred twenty days after his or her final furnishing of services or materials, he or she has recorded a lien.",
          "citation": "Neb. Rev. Stat. § 52-137(1)",
          "url": "https://web.archive.org/web/20260614002359id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-137",
          "sourceId": "ne-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q5",
          "text": "(3) The claimant shall send a copy of a recorded lien to the contracting owner within ten days after recording, and the recording shall be within the time specified for the filing of liens under section 52-137.",
          "citation": "Neb. Rev. Stat. § 52-135(3)",
          "url": "https://web.archive.org/web/20260614013143id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-135",
          "sourceId": "ne-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q6",
          "text": "(1) Protected party shall mean: (a) An individual who contracts to give a real estate security interest in, or to buy or to have improved, residential real estate all or a part of which he or she occupies or intends to occupy as a residence; (b) A person obligated primarily or secondarily on a contract to buy or have improved residential real estate or on an obligation secured by residential real estate if, at the time he or she becomes obligated, he or she is related to an individual who occupies or intends to occupy all or a part of the real estate as a residence; or (c) With respect to a security agreement, a person who acquires residential real estate and assumes or takes subject to the obligation of a prior protected party under the real estate security agreement.",
          "citation": "Neb. Rev. Stat. § 52-129(1)",
          "url": "https://web.archive.org/web/20251118222242id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-129",
          "sourceId": "ne-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "ne-q7",
          "text": "(1) Except as provided in subsections (2) and (3) of this section, a lien that has become enforceable as provided in sections 52-125 to 52-159 continues enforceable for two years after recording of the lien.",
          "citation": "Neb. Rev. Stat. § 52-140(1)",
          "url": "https://web.archive.org/web/20260614011458id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-140",
          "sourceId": "ne-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q8",
          "text": "(3) If a judicial proceeding to enforce a lien is instituted while a lien is effective under subsection (1) or (2) of this section, the lien continues during the pendency of the proceeding.",
          "citation": "Neb. Rev. Stat. § 52-140(3)",
          "url": "https://web.archive.org/web/20260614011458id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-140",
          "sourceId": "ne-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q9",
          "text": "(2) Except as provided in subsection (3) of this section, if an owner, holder of a security interest, or other person having an interest in the real estate gives the claimant written demand to institute a judicial proceeding within thirty days, the lien lapses unless within thirty days after receipt of the written demand, the claimant institutes judicial proceedings or records an affidavit that the total contract price is not yet due under the contract for which he or she recorded the lien.",
          "citation": "Neb. Rev. Stat. § 52-140(2)",
          "url": "https://web.archive.org/web/20260614011458id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=52-140",
          "sourceId": "ne-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-14"
        },
        {
          "id": "ne-q10",
          "text": "(2) Residential real estate shall mean, in relation to a protected party, real estate, improved or to be improved, containing not more than four dwelling units and no nonresidential uses for which the protected party is a lessor.",
          "citation": "Neb. Rev. Stat. § 52-129(2)",
          "url": "https://web.archive.org/web/20251118222242id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-129",
          "sourceId": "ne-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "ne-q11",
          "text": "A condominium unit that is otherwise residential real estate remains so even though the condominium development contains more than four dwelling units or units used for nonresidential purposes.",
          "citation": "Neb. Rev. Stat. § 52-129(2)",
          "url": "https://web.archive.org/web/20251118222242id_/https://nebraskalegislature.gov/laws/statutes.php?statute=52-129",
          "sourceId": "ne-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "ne-q12",
          "text": "Except as may be otherwise more specifically provided, the period of time within which an act is to be done in any action or proceeding shall be computed by excluding the day of the act, event, or default after which the designated period of time begins to run.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q13",
          "text": "The last day of the period so computed shall be included unless it is a Saturday, a Sunday, or a day during which the offices of courts of record may be legally closed as provided in this section, in which event the period shall run until the end of the next day on which the office will be open.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q14",
          "text": "All courts and their offices may be closed on Saturdays, Sundays, days on which a specifically designated court is closed by order of the Chief Justice of the Supreme Court, and these holidays: New Year's Day, January 1; Birthday of Martin Luther King, Jr., the third Monday in January; President's Day, the third Monday in February; Arbor Day, the last Friday in April; Memorial Day, the last Monday in May; Juneteenth National Independence Day, June 19; Independence Day, July 4; Labor Day, the first Monday in September; Indigenous Peoples' Day and Columbus Day, the second Monday in October; Veterans Day, November 11; Thanksgiving Day, the fourth Thursday in November; the day after Thanksgiving; Christmas Day, December 25; and all days declared by law or proclamation of the Governor to be holidays.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q15",
          "text": "Such days shall be designated as nonjudicial days.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q16",
          "text": "If any such holiday falls on Sunday, the following Monday shall be a holiday.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q17",
          "text": "If any such holiday falls on Saturday, the preceding Friday shall be a holiday.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        },
        {
          "id": "ne-q18",
          "text": "If the date designated by the state for observance of any legal holiday pursuant to this section, except Veterans Day, is different from the date of observance of such holiday pursuant to a federal holiday schedule, the federal holiday schedule shall be observed.",
          "citation": "Neb. Rev. Stat. § 25-2221",
          "url": "https://web.archive.org/web/20251005224826id_/https://www.nebraskalegislature.gov/laws/statutes.php?statute=25-2221",
          "sourceId": "ne-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-10-05"
        }
      ],
      "rules": [
        {
          "id": "ne-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "Except as modified by subsections (4) and (5) of § 52-136, where the contracting owner is a party described in § 52-129(1), the lien of a claimant other than a prime contractor is for the lesser of the amount unpaid under the claimant's contract or the amount unpaid under the prime contract through which the claimant claims at the time the contracting owner receives the claimant's notice of the right to assert a lien.",
          "recipients": [
            "The contracting owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ne-q1",
            "ne-q2",
            "ne-q3"
          ]
        },
        {
          "id": "ne-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "A claimant's lien does not attach and may not be enforced unless, after entering into the contract under which the lien arises and within that time, the claimant has recorded a lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ne-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant's final furnishing of services or materials"
            }
          ]
        },
        {
          "id": "ne-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "When the contracting owner is a party described in § 52-129(1)",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 10
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The contracting owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ne-q5",
            "ne-q2",
            "ne-q6"
          ]
        },
        {
          "id": "ne-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": "If a judicial proceeding to enforce the lien is instituted while the lien is effective, the lien continues during the pendency of the proceeding.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ne-q7",
            "ne-q8"
          ]
        },
        {
          "id": "ne-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If an owner, holder of a security interest, or other person having an interest in the real estate gives the claimant written demand to institute a judicial proceeding within thirty days",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within thirty days after receipt of the written demand"
          },
          "consequence": "The lien lapses unless within that time the claimant institutes judicial proceedings or records an affidavit that the total contract price is not yet due under the contract for which the claimant recorded the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ne-q9"
          ]
        }
      ],
      "residential": [
        {
          "text": "The notice of the right to assert a lien and the copy of a recorded lien sent to the contracting owner, both under § 52-135, apply only when the contracting owner is a party described in § 52-129(1). That includes an individual who contracts to have improved residential real estate all or a part of which he or she occupies or intends to occupy as a residence, and residential real estate, in relation to such a party, contains not more than four dwelling units and no nonresidential uses for which that party is a lessor, though a condominium unit that is otherwise residential real estate remains so even though the condominium development contains more than four dwelling units or units used for nonresidential purposes.",
          "quoteIds": [
            "ne-q2",
            "ne-q6",
            "ne-q10",
            "ne-q11"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ne-q12"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": [
            "enforcement"
          ],
          "quoteIds": [
            "ne-q13",
            "ne-q14"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ne-q14",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Birthday of Martin Luther King, Jr.",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "President's Day",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Arbor Day",
            "quoteId": "ne-q14",
            "kind": "last-weekday",
            "month": 4,
            "weekday": 5,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "ne-q14",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth National Independence Day",
            "quoteId": "ne-q14",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "ne-q14",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Indigenous Peoples' Day and Columbus Day",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "ne-q14",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The day after Thanksgiving",
            "quoteId": "ne-q14",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "ne-q14",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ne-q14",
          "ne-q15",
          "ne-q16",
          "ne-q17",
          "ne-q18"
        ],
        "closure": {
          "clause": "on which a specifically designated court is closed by order of the Chief Justice of the Supreme Court",
          "place": "the court",
          "quoteIds": [
            "ne-q14",
            "ne-q13"
          ]
        },
        "conditionalMove": {
          "day": "weekend-or-holiday",
          "stages": [
            "lien-filing",
            "service"
          ],
          "condition": "when the period is one within which an act is to be done in any action or proceeding",
          "unknown": "whether recording a lien or sending a copy of it is an act to be done in an action or proceeding",
          "quoteIds": [
            "ne-q12",
            "ne-q13"
          ]
        }
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the claimant's final furnishing of services or materials",
          "input": "Final furnishing of services or materials on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ne-0",
        "ne-1",
        "ne-2",
        "ne-3",
        "ne-4",
        "ne-5"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NH",
      "name": "New Hampshire",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "N.H. Rev. Stat. Ann. ch. 447",
      "statuteUrl": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-9.htm",
      "summary": "In New Hampshire the lien for labor, professional design services or materials continues for 120 days after the services are performed, or the materials, supplies or other things are furnished, unless payment is previously made, and it may be secured by attachment of the property at any time while it continues. A person who performs labor, provides professional design services or furnishes materials under a contract with an agent, contractor or subcontractor of the owner gives the owner or the person having charge of the property written notice of the lien claim before performing the labor or furnishing the material, or later, with the lien then valid to the extent of the amount then due or that may thereafter become due to the contractor, agent or subcontractor of the owner.",
      "effectiveOrAmended": "Sections 447:5, 447:6 and 447:8 were last amended by 2012, 158, effective January 1, 2013. Section 447:9 was last amended by 1991, 270, effective January 1, 1992, section 447:12-b by 2019, 57, effective August 4, 2019, and section 21:35 by 2008, 11, effective January 1, 2009.",
      "quotes": [
        {
          "id": "nh-q1",
          "text": "If a person shall perform labor, provide professional design services as defined in RSA 447:2, or furnish materials to the amount of $15 or more for any of the purposes specified in RSA 447:2, 447:3 and 447:4 and in RSA 453, by virtue of a contract with an agent, contractor or subcontractor of the owner, the person shall have the same lien as provided in said sections, provided, that he or she gives notice in writing to the owner or to the person having charge of the property that he or she shall claim such lien before performing the labor or furnishing the material for which it is claimed.",
          "citation": "N.H. Rev. Stat. Ann. § 447:5",
          "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-5.htm",
          "sourceId": "nh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-11"
        },
        {
          "id": "nh-q2",
          "text": "Such notice may be given after the labor is performed, the professional design services are provided, or the material is furnished, and said lien shall be valid to the extent of the amount then due or that may thereafter become due to the contractor, agent or subcontractor of the owner.",
          "citation": "N.H. Rev. Stat. Ann. § 447:6",
          "url": "https://web.archive.org/web/20260909165306id_/https://gc.nh.gov/rsa/html/XLI/447/447-6.htm",
          "sourceId": "nh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-09"
        },
        {
          "id": "nh-q3",
          "text": "Any person giving notice as provided in RSA 447:5-7 shall, as often as once in 30 days, furnish to the owner, or person having charge of the property on which the lien is claimed, an account in writing of the labor performed, professional design services provided, or materials furnished during the 30 days; and the owner or person in charge shall retain a sufficient sum of money to pay such claim, and shall not be liable to the agent, contractor or subcontractor therefor, unless the agent, contractor or subcontractor shall first pay it.",
          "citation": "N.H. Rev. Stat. Ann. § 447:8",
          "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-8.htm",
          "sourceId": "nh-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-11"
        },
        {
          "id": "nh-q4",
          "text": "II. Any person entitled to a lien pursuant to RSA 447:2-7 shall, within 15 business days of the posting required in paragraph I or of commencing to furnish services, materials, supplies or other things, whichever is later, provide written notice to the institution providing the construction funds that such person is furnishing services, materials, supplies or other things.",
          "citation": "N.H. Rev. Stat. Ann. § 447:12-b, II",
          "url": "https://web.archive.org/web/20250418123623id_/https://gc.nh.gov/rsa/html/XLI/447/447-12-b.htm",
          "sourceId": "nh-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "nh-q5",
          "text": "I. Within 10 business days of the execution of a construction mortgage, including any refinancing thereof, the mortgagor or his agent shall post in a conspicuous place on the jobsite for which the construction funds were secured, the name, address and telephone number of the institution providing the construction funds.",
          "citation": "N.H. Rev. Stat. Ann. § 447:12-b, I",
          "url": "https://web.archive.org/web/20250418123623id_/https://gc.nh.gov/rsa/html/XLI/447/447-12-b.htm",
          "sourceId": "nh-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "nh-q6",
          "text": "Failure to provide the notice required by this paragraph shall not alone invalidate the lien created by RSA 447:2-7.",
          "citation": "N.H. Rev. Stat. Ann. § 447:12-b, II",
          "url": "https://web.archive.org/web/20250418123623id_/https://gc.nh.gov/rsa/html/XLI/447/447-12-b.htm",
          "sourceId": "nh-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "nh-q7",
          "text": "The lien created by RSA 447:2-7, inclusive, shall continue for 120 days after the services are performed, or the materials, supplies or other things are furnished, unless payment therefor is previously made, and shall take precedence of all prior claims except liens on account of taxes.",
          "citation": "N.H. Rev. Stat. Ann. § 447:9",
          "url": "https://web.archive.org/web/20260511065506id_/https://gc.nh.gov/rsa/html/XLI/447/447-9.htm",
          "sourceId": "nh-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-11"
        },
        {
          "id": "nh-q8",
          "text": "Any such lien may be secured by attachment of the property upon which it exists at any time while the lien continues, the writ and return thereon distinctly expressing that purpose.",
          "citation": "N.H. Rev. Stat. Ann. § 447:10",
          "url": "https://web.archive.org/web/20250823180037id_/https://gc.nh.gov/rsa/html/XLI/447/447-10.htm",
          "sourceId": "nh-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-08-23"
        },
        {
          "id": "nh-q9",
          "text": "I. Except where specifically stated to the contrary, when a period or limit of time is to be reckoned from a day or date, that day or date shall be excluded from and the day on which an act should occur shall be included in the computation of the period or limit of time.",
          "citation": "N.H. Rev. Stat. Ann. § 21:35, I",
          "url": "https://web.archive.org/web/20260712210734id_/https://gc.nh.gov/rsa/html/I/21/21-35.htm",
          "sourceId": "nh-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-07-12"
        }
      ],
      "rules": [
        {
          "id": "nh-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before performing the labor or furnishing the material for which it is claimed"
          },
          "consequence": "The notice may be given after the labor is performed, the professional design services are provided, or the material is furnished, and the lien is then valid to the extent of the amount then due or that may thereafter become due to the contractor, agent or subcontractor of the owner.",
          "recipients": [
            "The owner or the person having charge of the property"
          ],
          "delivery": "In writing.",
          "quoteIds": [
            "nh-q1",
            "nh-q2"
          ]
        },
        {
          "id": "nh-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "An account in writing, for any person giving notice as provided in RSA 447:5-7",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "As often as once in 30 days"
          },
          "consequence": "The owner or person in charge retains a sufficient sum of money to pay the claim, and is not liable for it to the agent, contractor or subcontractor unless the agent, contractor or subcontractor first pays it.",
          "recipients": [
            "The owner, or the person having charge of the property on which the lien is claimed"
          ],
          "delivery": null,
          "quoteIds": [
            "nh-q3"
          ]
        },
        {
          "id": "nh-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where a construction mortgage has been executed, for a notice to the institution providing the construction funds",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 15 business days of the posting required in paragraph I or of commencing to furnish services, materials, supplies or other things, whichever is later"
          },
          "consequence": "Failure to provide the notice does not alone invalidate the lien.",
          "recipients": [
            "The institution providing the construction funds"
          ],
          "delivery": "Written notice.",
          "quoteIds": [
            "nh-q4",
            "nh-q5",
            "nh-q6"
          ]
        },
        {
          "id": "nh-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "Chapter 447 provides no lien filing: the lien created by RSA 447:2-7 continues for 120 days after the services are performed, or the materials, supplies or other things are furnished, unless payment therefor is previously made, and it may be secured by attachment of the property at any time while it continues.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nh-q7",
            "nh-q8"
          ]
        },
        {
          "id": "nh-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "To secure the lien by attachment of the property while the lien continues",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "The lien continues for 120 days after the services are performed, or the materials, supplies or other things are furnished, unless payment therefor is previously made.",
          "recipients": null,
          "delivery": "By attachment of the property upon which the lien exists, the writ and return thereon distinctly expressing that purpose.",
          "quoteIds": [
            "nh-q8",
            "nh-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the services are performed, or the materials, supplies or other things are furnished"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "nh-q9"
          ]
        },
        "rolling": null,
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": []
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the services are performed, or the materials, supplies or other things are furnished",
          "input": "Services performed or materials furnished on",
          "hint": "RSA 447:9 counts the 120 days from when the services are performed, or the materials, supplies or other things are furnished."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "nh-0",
        "nh-1",
        "nh-2",
        "nh-3",
        "nh-4",
        "nh-5",
        "nh-6"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NM",
      "name": "New Mexico",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "N.M. Stat. Ann. §§ 48-2-1 to 48-2-17",
      "statuteUrl": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
      "summary": "New Mexico gives an original contractor 120 days after the completion of its contract, and every other person 90 days after the completion of the building, improvement or structure or of its alteration or repair, to file a claim of lien with the county clerk, with a copy of the filed claim to the owner or reputed owner within fifteen days of filing, and the lien does not remain valid for longer than two years after the claim is filed unless proceedings to enforce it are commenced in a court of competent jurisdiction or in binding arbitration within that time. For a lien of more than $5,000 on property other than residential property containing four or fewer dwelling units, a mechanic or materialman who is not the original contractor and does not contract directly with it gives notice not more than sixty days after initially furnishing work or materials.",
      "effectiveOrAmended": "Section 48-2-6 was last amended by Laws 2023, ch. 61, effective June 16, 2023, which added the copy of the filed claim to the owner. Sections 48-2-2.1 and 48-2-10 were last amended by Laws 2007, ch. 212.",
      "quotes": [
        {
          "id": "nm-q1",
          "text": "B. No lien of a mechanic or a materialman claimed in an amount of more than five thousand dollars ($5,000) may be enforced by action or otherwise unless the lien claimant has given notice in writing of the claimant's right to claim a lien in the event of nonpayment and that notice was given not more than sixty days after initially furnishing work or materials, or both, by either certified mail, return receipt requested, facsimile with acknowledgement or personal delivery to: (1) the owner or reputed owner of the property upon which the improvements are being constructed; or (2) the original contractor, if any.",
          "citation": "N.M. Stat. Ann. § 48-2-2.1(B)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q2",
          "text": "A. The provisions of Subsections B through D of this section do not apply to claims of liens made on residential property containing four or fewer dwelling units, to claims of liens made by an original contractor or to claims of liens made by mechanics or materialmen who contract directly with the original contractor.",
          "citation": "N.M. Stat. Ann. § 48-2-2.1(A)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q3",
          "text": "For purposes of this section, \"original contractor\" means a contractor that contracts directly with the owner.",
          "citation": "N.M. Stat. Ann. § 48-2-2.1(A)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q4",
          "text": "E. A person required by the provisions of Subsection B of this section to give notice to enforce the person's claim of lien may elect not to give the notice, but may give the required notice at a later time.",
          "citation": "N.M. Stat. Ann. § 48-2-2.1(E)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q5",
          "text": "If the person elects to do so, the lien shall apply only to the work performed or materials furnished on or after the date thirty days prior to the date the notice was given.",
          "citation": "N.M. Stat. Ann. § 48-2-2.1(E)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q6",
          "text": "A. Every original contractor, within one hundred twenty days after the completion of a contract, and every person, except the original contractor, desiring to claim a lien pursuant to Sections 48-2-1 through 48-2-17 NMSA 1978 shall, within ninety days after the completion of any building, improvement or structure or after the completion of the alteration or repair of the building, improvement or structure or the performance of any labor in a mining claim, file for record with the county clerk of the county in which the property or some part of it is situated a claim containing a statement of demands, after deducting all just credits and offsets.",
          "citation": "N.M. Stat. Ann. § 48-2-6(A)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q7",
          "text": "B. A person filing a claim for a lien with a county clerk pursuant to Subsection A of this section shall mail, email, send by certified mail with return receipt requested or hand deliver a copy of the filed claim for a lien to the owner or reputed owner, if known, stated in the claim within fifteen days of filing the claim with the county clerk.",
          "citation": "N.M. Stat. Ann. § 48-2-6(B)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q8",
          "text": "The copy of the filed claim for a lien shall be sent or delivered to the owner or reputed owner at the owner or reputed owner's last known address.",
          "citation": "N.M. Stat. Ann. § 48-2-6(B)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q9",
          "text": "If the owner or reputed owner's address is not known, the copy of the filed claim for a lien shall be sent to the address of the owner of the property as listed in the county assessor's files.",
          "citation": "N.M. Stat. Ann. § 48-2-6(B)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q10",
          "text": "The failure of the claimant to serve the notice may preclude the recovery of interest, attorney's fees or costs.",
          "citation": "N.M. Stat. Ann. § 48-2-6(B)",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "nm-q11",
          "text": "No lien provided for in Sections 48-2-1 through 48-2-17 NMSA 1978 remains valid for a longer period than two years after the claim of lien has been filed unless proceedings have been commenced in a court of competent jurisdiction or in binding arbitration within that time to enforce the lien.",
          "citation": "N.M. Stat. Ann. § 48-2-10",
          "url": "https://nmonesource.com/nmos/nmsa/en/4413/1/document.do",
          "sourceId": "nm-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "nm-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "other",
          "branchNote": "For a lien claimed in an amount of more than five thousand dollars ($5,000) by a mechanic or materialman who is not the original contractor and does not contract directly with the original contractor",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "Without the notice, such a lien may not be enforced by action or otherwise. The notice may be given at a later time, and the lien then applies only to the work performed or materials furnished on or after the date thirty days prior to the date the notice was given.",
          "recipients": [
            "The owner or reputed owner of the property upon which the improvements are being constructed",
            "The original contractor, if any"
          ],
          "delivery": "In writing, by certified mail, return receipt requested, facsimile with acknowledgment or personal delivery, to the owner or reputed owner or to the original contractor, if any.",
          "quoteIds": [
            "nm-q1",
            "nm-q2",
            "nm-q3",
            "nm-q4",
            "nm-q5"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "initially furnishing work or materials, or both"
            }
          ]
        },
        {
          "id": "nm-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nm-q2",
            "nm-q3"
          ]
        },
        {
          "id": "nm-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nm-q2"
          ]
        },
        {
          "id": "nm-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within one hundred twenty days after the completion of a contract"
          },
          "consequence": null,
          "recipients": null,
          "delivery": "Filed for record with the county clerk of the county in which the property or some part of it is situated.",
          "quoteIds": [
            "nm-q6"
          ]
        },
        {
          "id": "nm-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": "Filed for record with the county clerk of the county in which the property or some part of it is situated.",
          "quoteIds": [
            "nm-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the completion of the building, improvement or structure or of its alteration or repair"
            }
          ]
        },
        {
          "id": "nm-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 15
            }
          },
          "notComputed": null,
          "consequence": "The failure of the claimant to serve the notice may preclude the recovery of interest, attorney's fees or costs.",
          "recipients": [
            "The owner or reputed owner, if known, stated in the claim"
          ],
          "delivery": "Mailed, emailed, sent by certified mail with return receipt requested or hand delivered to the owner or reputed owner's last known address, or, if that address is not known, sent to the address of the owner of the property as listed in the county assessor's files.",
          "quoteIds": [
            "nm-q7",
            "nm-q8",
            "nm-q9",
            "nm-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed with the county clerk"
            }
          ]
        },
        {
          "id": "nm-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": "The lien does not remain valid for longer than that unless proceedings have been commenced in a court of competent jurisdiction or in binding arbitration within that time to enforce it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nm-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed with the county clerk"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means residential property containing four or fewer dwelling units.",
        "quoteIds": [
          "nm-q2"
        ]
      },
      "computation": null,
      "eventWording": [
        {
          "event": "first-furnishing",
          "clause": "initially furnishing work or materials, or both",
          "input": "Work or materials initially furnished on",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "the completion of the building, improvement or structure or of its alteration or repair",
          "input": "Completion of the building, improvement or structure, or of its alteration or repair, on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is filed with the county clerk",
          "input": "Claim of lien filed on",
          "hint": "Leave empty if no claim of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "nm-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NV",
      "name": "Nevada",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "NRS 108.221 to 108.246",
      "statuteUrl": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
      "summary": "Nevada requires a lien claimant to record a notice of lien within 90 days after the latest of the completion of the work of improvement and the claimant's last delivery of material, furnishing of equipment or performance of work, or within 40 days after the recording of a valid notice of completion recorded and served in the manner NRS 108.228 requires, and the lien does not bind the property for longer than 6 months after recording unless proceedings are commenced in a proper court within that time or the time is extended by a recorded written instrument. A copy of the notice of lien is served on the owner within 30 days after recording, a lien claimant other than one who performs only labor or who contracts directly with or sells materials directly to an owner delivers a notice of right to lien to the owner, and on multifamily or single-family residences a claimant other than a laborer serves a 15-day notice of intent to lien before recording.",
      "effectiveOrAmended": "In the chapter as revised through the 2023 session, section 108.226 was last amended in 2005, section 108.227 in 2007, sections 108.228 and 108.233 in 2003, and section 108.245 in 2017.",
      "quotes": [
        {
          "id": "nv-q1",
          "text": "1. Except as otherwise provided in subsection 5, every lien claimant, other than one who performs only labor or is a potential claimant under NRS 608.150, who claims the benefit of NRS 108.221 to 108.246, inclusive, shall, at any time after the first delivery of material or performance of work or services under a contract, deliver in person or by certified mail to the owner of the property a notice of right to lien in substantially the following form:",
          "citation": "NRS 108.245(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q2",
          "text": "NOTICE OF RIGHT TO LIEN To: ................................................... (Owners name and address) The undersigned notifies you that he or she has supplied materials or equipment or performed work or services as follows: ............................................................................................................................ (General description of materials, equipment, work or services) for improvement of property identified as (property description or street address) under contract with (general contractor or subcontractor). This is not a notice that the undersigned has not been or does not expect to be paid, but a notice required by law that the undersigned may, at a future date, record a notice of lien as provided by law against the property if the undersigned is not paid. (Claimant)",
          "citation": "NRS 108.245(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q3",
          "text": "A subcontractor or equipment or material supplier who gives such a notice must also deliver in person or send by certified mail a copy of the notice to the prime contractor for information only.",
          "citation": "NRS 108.245(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q4",
          "text": "3. No lien for materials or equipment furnished or for work or services performed, except labor, may be perfected or enforced pursuant to NRS 108.221 to 108.246, inclusive, unless the notice has been given.",
          "citation": "NRS 108.245(3)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q5",
          "text": "6. A lien claimant who is required by this section to give a notice of right to lien to an owner and who gives such a notice has a right to lien for materials or equipment furnished or for work or services performed in the 31 days before the date the notice of right to lien is given and for the materials or equipment furnished or for work or services performed anytime thereafter until the completion of the work of improvement.",
          "citation": "NRS 108.245(6)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q6",
          "text": "5. A prime contractor or other person who contracts directly with an owner or sells materials directly to an owner is not required to give notice pursuant to this section.",
          "citation": "NRS 108.245(5)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q7",
          "text": "6. Except as otherwise provided in subsection 7, if a work of improvement involves the construction, alteration or repair of multifamily or single-family residences, including, without limitation, apartment houses, a lien claimant, except laborers, must serve a 15-day notice of intent to lien incorporating substantially the same information required in a notice of lien upon both the owner and the reputed prime contractor before recording a notice of lien.",
          "citation": "NRS 108.226(6)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q8",
          "text": "Service of the notice of intent to lien must be by personal delivery or certified mail and will extend the time for recording the notice of lien described in subsection 1 by 15 days.",
          "citation": "NRS 108.226(6)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q9",
          "text": "A notice of lien for materials or equipment furnished or to be furnished for work or services performed or to be performed, except labor, for a work of improvement involving the construction, alteration or repair of multifamily or single-family residences may not be perfected or enforced pursuant to NRS 108.221 to 108.246, inclusive, unless the 15-day notice of intent to lien has been given to the owner.",
          "citation": "NRS 108.226(6)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q10",
          "text": "7. The provisions of subsection 6 do not apply to the construction of any nonresidential construction project.",
          "citation": "NRS 108.226(7)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q11",
          "text": "1. To perfect a lien, a lien claimant must record a notice of lien in the office of the county recorder of the county where the property or some part thereof is located in the form provided in subsection 5: (a) Within 90 days after the date on which the latest of the following occurs: (1) The completion of the work of improvement; (2) The last delivery of material or furnishing of equipment by the lien claimant for the work of improvement; or (3) The last performance of work by the lien claimant for the work of improvement; or (b) Within 40 days after the recording of a valid notice of completion, if the notice of completion is recorded and served in the manner required pursuant to NRS 108.228.",
          "citation": "NRS 108.226(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q12",
          "text": "4. Upon recording the notice pursuant to this section, the owner shall, within 10 days after the notice is recorded, deliver a copy of the notice by certified mail, to: (a) Each prime contractor with whom the owner contracted for all or part of the work of improvement. (b) Each potential lien claimant who, before the notice was recorded pursuant to this section, either submitted a request to the owner to receive the notice or delivered a preliminary notice of right to lien pursuant to NRS 108.245.",
          "citation": "NRS 108.228(4)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q13",
          "text": "5. The failure of the owner to deliver a copy of the notice of completion in the time and manner provided in this section renders the notice of completion ineffective with respect to each prime contractor and lien claimant to whom a copy was required to be delivered pursuant to subsection 4.",
          "citation": "NRS 108.228(5)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q14",
          "text": "1. In addition to the requirements of NRS 108.226, a copy of the notice of lien must be served upon the owner of the property within 30 days after recording the notice of lien, in one of the following ways: (a) By personally delivering a copy of the notice of lien to the owner or registered agent of the owner; (b) By mailing a copy of the notice of lien by certified mail, return receipt requested, to the owner at the owners place of residence or the owners usual place of business or to the registered agent of the owner at the address of the registered agent;",
          "citation": "NRS 108.227(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q15",
          "text": "or (c) If the place of residence or business of the owner and the address of the registered agent of the owner, if applicable, cannot be determined, by: (1) Fixing a copy of the notice of lien in a conspicuous place on the property; (2) Delivering a copy of the notice of lien to a person there residing, if such a person can be found; and (3) Mailing a copy of the notice of lien addressed to the owner at: (I) The place where the property is located; (II) The address of the owner as identified in the deed; (III) The address identified in the records of the office of the county assessor; or (IV) The address identified in the records of the county recorder of the county in which the property is located.",
          "citation": "NRS 108.227(1)(c)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q16",
          "text": "3. Each subcontractor who participates in the construction, improvement, alteration or repair of a work of improvement shall deliver a copy of each notice of lien required by NRS 108.226 to the prime contractor.",
          "citation": "NRS 108.227(3)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q17",
          "text": "1. A lien provided for in NRS 108.221 to 108.246, inclusive, must not bind the property subject to the lien for a period longer than 6 months after the date on which the notice of lien was recorded, unless: (a) Proceedings are commenced in a proper court within that time to enforce the same; or (b) The time to commence the action is extended by a written instrument signed by the lien claimant and by a person or persons in interest in the property subject to the lien, in which event, and as to only that person or those persons in interest signing the agreement, the time is extended, but no extension is valid unless in writing and recorded in the county recorders office in which the notice of lien is recorded and unless the extension agreement is recorded within the 6-month period.",
          "citation": "NRS 108.233(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q18",
          "text": "An extension must not be given for a period in excess of 1 year beyond the date on which the notice of lien is recorded.",
          "citation": "NRS 108.233(2)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q19",
          "text": "Completion of the work of improvement means: 1. The occupation or use by the owner, an agent of the owner or a representative of the owner of the work of improvement, accompanied by the cessation of all work on the work of improvement; 2. The acceptance by the owner, an agent of the owner or a representative of the owner of the work of improvement, accompanied by the cessation of all work on the work of improvement; or 3. The cessation of all work on a work of improvement for 30 consecutive days, provided a notice of completion is timely recorded and served and the work is not resumed under the same contract.",
          "citation": "NRS 108.22116",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        },
        {
          "id": "nv-q20",
          "text": "1. The owner may record a notice of completion after the completion of the work of improvement.",
          "citation": "NRS 108.228(1)",
          "url": "https://web.archive.org/web/20260420131506id_/https://www.leg.state.nv.us/NRS/NRS-108.html",
          "sourceId": "nv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-20"
        }
      ],
      "rules": [
        {
          "id": "nv-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "At any time after the first delivery of material or performance of work or services under a contract"
          },
          "consequence": "No lien for materials or equipment furnished or for work or services performed, except labor, may be perfected or enforced unless the notice has been given. A lien claimant who gives the notice has a right to lien for what was furnished or performed in the 31 days before the date the notice is given and anytime thereafter until the completion of the work of improvement.",
          "recipients": [
            "The owner of the property",
            "The prime contractor, a copy for information only, from a subcontractor or equipment or material supplier"
          ],
          "delivery": "Delivered in person or by certified mail.",
          "quoteIds": [
            "nv-q1",
            "nv-q2",
            "nv-q3",
            "nv-q4",
            "nv-q5"
          ]
        },
        {
          "id": "nv-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nv-q1",
            "nv-q2",
            "nv-q6"
          ]
        },
        {
          "id": "nv-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before recording a notice of lien"
          },
          "consequence": "A notice of lien for materials or equipment, except labor, for such a work of improvement may not be perfected or enforced unless the 15-day notice of intent to lien has been given to the owner. Service of the notice extends the time for recording the notice of lien by 15 days.",
          "recipients": [
            "The owner",
            "The reputed prime contractor"
          ],
          "delivery": "By personal delivery or certified mail.",
          "quoteIds": [
            "nv-q7",
            "nv-q8",
            "nv-q9",
            "nv-q10"
          ]
        },
        {
          "id": "nv-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "laterOf": [
                "completion",
                "last-furnishing"
              ]
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": "Recorded in the office of the county recorder of the county where the property or some part of it is located.",
          "quoteIds": [
            "nv-q11",
            "nv-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the lien claimant's last delivery of material, furnishing of equipment or performance of work for the work of improvement"
            },
            {
              "event": "completion",
              "clause": "the completion of the work of improvement"
            }
          ],
          "mayChangeIf": "a 15-day notice of intent to lien is served on a work of improvement involving the construction, alteration or repair of multifamily or single-family residences",
          "mayChangeDirection": "later"
        },
        {
          "id": "nv-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "If a valid notice of completion is recorded and served in the manner required pursuant to NRS 108.228",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 40
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": "Recorded in the office of the county recorder of the county where the property or some part of it is located.",
          "quoteIds": [
            "nv-q11",
            "nv-q12",
            "nv-q13",
            "nv-q8"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "a valid notice of completion is recorded"
            }
          ],
          "mayChangeIf": "a 15-day notice of intent to lien is served on a work of improvement involving the construction, alteration or repair of multifamily or single-family residences",
          "mayChangeDirection": "later"
        },
        {
          "id": "nv-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner of the property"
          ],
          "delivery": "By personally delivering a copy to the owner or the owner's registered agent, by certified mail, return receipt requested, or, if no residence, business or registered agent address can be determined, by fixing a copy in a conspicuous place on the property, delivering a copy to a person residing there and mailing a copy to the owner. Each subcontractor also delivers a copy of each notice of lien to the prime contractor.",
          "quoteIds": [
            "nv-q14",
            "nv-q15",
            "nv-q16"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is recorded"
            }
          ]
        },
        {
          "id": "nv-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "The lien does not bind the property for longer than that unless proceedings are commenced in a proper court within that time to enforce it. An extension may not run more than 1 year beyond the date on which the notice of lien is recorded.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "nv-q17",
            "nv-q18"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is recorded"
            }
          ],
          "mayChangeIf": "the time to commence the action is extended by a written instrument signed by the lien claimant and a person in interest in the property and recorded within the 6-month period",
          "mayChangeDirection": "later"
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Completion of the work of improvement means its occupation or use, or its acceptance, by the owner or the owner's agent or representative, accompanied by the cessation of all work on it, or the cessation of all work on it for 30 consecutive days, provided a notice of completion is timely recorded and served and the work is not resumed under the same contract.",
          "quoteIds": [
            "nv-q19"
          ]
        },
        {
          "text": "The owner may record a notice of completion after the completion of the work of improvement. Within 10 days after recording it, the owner delivers a copy by certified mail to each prime contractor and to each potential lien claimant who requested the notice or delivered a preliminary notice of right to lien, and a failure to deliver a copy in that time and manner renders the notice ineffective with respect to each prime contractor and lien claimant to whom a copy was required to be delivered.",
          "quoteIds": [
            "nv-q20",
            "nv-q12",
            "nv-q13"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "In these rules, residential means a work of improvement that involves the construction, alteration or repair of multifamily or single-family residences, including apartment houses.",
        "quoteIds": [
          "nv-q7",
          "nv-q10"
        ]
      },
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the lien claimant's last delivery of material, furnishing of equipment or performance of work for the work of improvement",
          "input": "Last delivery of material, furnishing of equipment or performance of work on",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "the completion of the work of improvement",
          "input": "Completion of the work of improvement on",
          "hint": "NRS 108.22116 says what completion of the work of improvement means."
        },
        {
          "event": "notice-of-completion",
          "clause": "a valid notice of completion is recorded",
          "input": "Notice of completion recorded on",
          "hint": "Leave empty if no notice of completion has been recorded."
        },
        {
          "event": "lien-recorded",
          "clause": "the notice of lien is recorded",
          "input": "Notice of lien recorded on",
          "hint": "Leave empty if no notice of lien has been recorded."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "nv-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "NY",
      "name": "New York",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "N.Y. Lien Law art. 2",
      "statuteUrl": "https://www.nysenate.gov/legislation/laws/LIE/10",
      "summary": "New York requires no preliminary notice on a private improvement. A notice of lien may be filed within eight months after the last item of work or materials, or four months for a single family dwelling, and lasts one year after filing unless within that time an action to foreclose is commenced and a notice of pendency is filed, or the lien is extended.",
      "effectiveOrAmended": "Sections 10, 11 and 17 in the revision dated September 22, 2014; section 11-b in the revision dated February 20, 2015.",
      "quotes": [
        {
          "id": "ny-q1",
          "text": "from the time of filing a notice of such lien as prescribed in this chapter",
          "citation": "N.Y. Lien Law § 3",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/3",
          "sourceId": "ny-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q2",
          "text": "within eight months after the completion of the contract, or the final performance of the work, or the final furnishing of the materials, dating from the last item of work performed or materials furnished",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q3",
          "text": "where the improvement is related to real property improved or to be improved with a single family dwelling, the notice of lien may be filed at any time during the progress of the work and the furnishing of the materials, or, within four months after the completion of the contract, or the final performance of the work, or the final furnishing of the materials, dating from the last item of work performed or materials furnished",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q4",
          "text": "where the notice of lien is for retainage, the notice of lien may be filed within ninety days after the date the retainage was due to be released",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q5",
          "text": "Within five days before or thirty days after filing the notice of lien, the lienor shall serve a copy of such notice upon the owner",
          "citation": "N.Y. Lien Law § 11",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
          "sourceId": "ny-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-06"
        },
        {
          "id": "ny-q6",
          "text": "Failure to file proof of such a service with the county clerk within thirty-five days after the notice of lien is filed shall terminate the notice as a lien.",
          "citation": "N.Y. Lien Law § 11",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11",
          "sourceId": "ny-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-06"
        },
        {
          "id": "ny-q7",
          "text": "Within five days before or thirty days after filing a notice of lien in accordance with section ten of this chapter or the filing of an amendment of notice of lien in accordance with section twelve-a of this chapter the lienor shall serve a copy of such notice or amendment by certified mail on the contractor, subcontractor, assignee or legal representative for whom he was employed or to whom he furnished materials",
          "citation": "N.Y. Lien Law § 11-b",
          "url": "https://web.archive.org/web/20250418044502id_/https://www.nysenate.gov/legislation/laws/LIE/11-B",
          "sourceId": "ny-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "ny-q8",
          "text": "A lienor having a direct contractual relationship with a subcontractor or a sub-subcontractor but not with a contractor shall also serve a copy of such notice or amendment by certified mail to the contractor.",
          "citation": "N.Y. Lien Law § 11-b",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/11-B",
          "sourceId": "ny-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-18"
        },
        {
          "id": "ny-q9",
          "text": "No lien specified in this article shall be a lien for a longer period than one year after the notice of lien has been filed, unless within that time an action is commenced to foreclose the lien, and a notice of the pendency of such action",
          "citation": "N.Y. Lien Law § 17",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
          "sourceId": "ny-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q10",
          "text": "A lien on real property improved or to be improved with a single family dwelling may only be extended by an order of a court of record, or a judge or justice thereof.",
          "citation": "N.Y. Lien Law § 17",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/17",
          "sourceId": "ny-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q11",
          "text": "where the improvement is related to real property improved or to be improved with a single family dwelling, the notice of lien may be filed at any time during the progress of the work and the furnishing of the materials, or, within four months after the completion of the contract",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q12",
          "text": "the term \"single family dwelling\" shall not include a dwelling unit which is a part of a subdivision that has been filed with a municipality in which the subdivision is located when at the time the lien is filed, such property in the subdivision is owned by the developer for purposes other than his personal residence.",
          "citation": "N.Y. Lien Law § 10(1)",
          "url": "https://web.archive.org/web/20260922055037id_/https://www.nysenate.gov/legislation/laws/LIE/10",
          "sourceId": "ny-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-22"
        },
        {
          "id": "ny-q13",
          "text": "A number of days specified as a period from a certain day within which or after or before which an act is authorized or required to be done means such number of calendar days exclusive of the calendar day from which the reckoning is made.",
          "citation": "N.Y. Gen. Constr. Law § 20",
          "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
          "sourceId": "ny-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-08"
        },
        {
          "id": "ny-q14",
          "text": "In computing any specified period of time from a specified event, the day upon which the event happens is deemed the day from which the reckoning is made. The day from which any specified period of time is reckoned shall be excluded in making the reckoning.",
          "citation": "N.Y. Gen. Constr. Law § 20",
          "url": "https://web.archive.org/web/20251108212158id_/https://www.nysenate.gov/legislation/laws/GCN/20",
          "sourceId": "ny-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-08"
        },
        {
          "id": "ny-q15",
          "text": "When any period of time, computed from a certain day, within which or after which or before which an act is authorized or required to be done, ends on a Saturday, Sunday or a public holiday, such act may be done on the next succeeding business day",
          "citation": "N.Y. Gen. Constr. Law § 25-a(1)",
          "url": "https://web.archive.org/web/20250825120112id_/https://www.nysenate.gov/legislation/laws/GCN/25-A",
          "sourceId": "ny-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-08-25"
        },
        {
          "id": "ny-q16",
          "text": "The term public holiday includes the following days in each year:",
          "citation": "N.Y. Gen. Constr. Law § 24",
          "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
          "sourceId": "ny-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-11"
        },
        {
          "id": "ny-q17",
          "text": "the first day of January, known as New Year's day; the third Monday of January, known as Dr. Martin Luther King, Jr. day; the twelfth day of February, known as Lincoln's birthday; the third Monday in February, known as Washington's birthday; the last Monday in May, known as Memorial day; the second Sunday in June, known as Flag day; the nineteenth day of June, known as Juneteenth; the fourth day of July, known as Independence day; the first Monday in September, known as Labor day; the second Monday in October, known as Columbus day; the eleventh day of November, known as Veterans' day; the fourth Thursday in November, known as Thanksgiving day; and the twenty-fifth day of December, known as Christmas day,",
          "citation": "N.Y. Gen. Constr. Law § 24",
          "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
          "sourceId": "ny-9",
          "retrievedAt": "2026-10-03",
          "capturedAt": "2026-02-11"
        },
        {
          "id": "ny-q18",
          "text": "and if any of such days except Flag day is Sunday, the next day thereafter; each general election day, and each day appointed by the president of the United States or by the governor of this state as a day of general thanksgiving, general fasting and prayer, or other general religious observances.",
          "citation": "N.Y. Gen. Constr. Law § 24",
          "url": "https://web.archive.org/web/20260211142820id_/https://www.nysenate.gov/legislation/laws/GCN/24",
          "sourceId": "ny-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-11"
        }
      ],
      "rules": [
        {
          "id": "ny-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q1"
          ]
        },
        {
          "id": "ny-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 8
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q2"
          ]
        },
        {
          "id": "ny-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q3"
          ]
        },
        {
          "id": "ny-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a notice of lien for retainage",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "90 days after the date the retainage was due to be released."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q4"
          ]
        },
        {
          "id": "ny-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Failing to file proof of service with the county clerk within 35 days after the notice of lien is filed terminates the notice as a lien.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "ny-q5",
            "ny-q6"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        },
        {
          "id": "ny-service-1",
          "stage": "service",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The contractor, subcontractor, assignee or legal representative for whom the lienor was employed or to whom it furnished materials",
            "The contractor as well, when the lienor contracted with a subcontractor or sub-subcontractor but not with the contractor"
          ],
          "delivery": "Certified mail.",
          "quoteIds": [
            "ny-q7",
            "ny-q8"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien, or an amendment of notice of lien, is filed"
            }
          ],
          "mayChangeIf": "an amendment of the notice of lien is filed"
        },
        {
          "id": "ny-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q9"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        },
        {
          "id": "ny-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ny-q9",
            "ny-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means real property improved or to be improved with a single family dwelling. A single family dwelling does not include a dwelling unit in a filed subdivision that, when the lien is filed, the developer owns for purposes other than the developer's personal residence.",
        "quoteIds": [
          "ny-q11",
          "ny-q12"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ny-q13",
            "ny-q14"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ny-q15"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr. day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln's birthday",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 2,
            "day": 12,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington's birthday",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial day",
            "quoteId": "ny-q16",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Flag day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 6,
            "weekday": 0,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving day",
            "quoteId": "ny-q16",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas day",
            "quoteId": "ny-q16",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ny-q16",
          "ny-q17",
          "ny-q18"
        ],
        "holidaysNotModeled": [
          {
            "name": "general election day",
            "reason": "N.Y. Gen. Constr. Law § 24 names it without stating its date"
          }
        ]
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the notice of lien is filed",
          "input": "Notice of lien filed on",
          "hint": "Leave empty if no notice of lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "ny-0",
        "ny-1",
        "ny-2",
        "ny-3",
        "ny-4",
        "ny-5",
        "ny-6",
        "ny-7",
        "ny-8",
        "ny-9"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "OH",
      "name": "Ohio",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Ohio Rev. Code ch. 1311",
      "statuteUrl": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
      "summary": "Ohio gives 60 days after the last labor or material to file a lien affidavit for a one- or two-family dwelling or a residential condominium unit, and 75 days for other improvements except oil and gas wells. Where a notice of commencement is recorded, subcontractors and material suppliers serve a notice of furnishing within 21 days after first furnishing, or within 21 days after a late notice of commencement is recorded; the notice does not apply under a home construction contract.",
      "effectiveOrAmended": "Section 1311.04 as amended by H.B. 96 (136th General Assembly), effective September 30, 2025; section 1311.06 effective January 30, 2014; sections 1311.05 and 1311.13 effective March 30, 2007; sections 1311.07 and 1311.11 effective April 10, 1991.",
      "quotes": [
        {
          "id": "oh-q1",
          "text": "at any time after the recording of the notice of commencement or amended notice but within twenty-one days after performing the first labor or work or furnishing the first materials or within the extended time period provided for in division (I) or (J) of section 1311.04 of the Revised Code.",
          "citation": "Ohio Rev. Code § 1311.05(A)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q2",
          "text": "If the owner, part owner, lessee, or designee fails to record the notice of commencement in accordance with this section, the time within which a subcontractor or material supplier may serve a notice of furnishing as required by section 1311.05 of the Revised Code is extended until twenty-one days after the notice of commencement has been recorded.",
          "citation": "Ohio Rev. Code § 1311.04(I)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q3",
          "text": "Prior to the performance of any labor or work or the furnishing of any materials for an improvement on real property which may give rise to a mechanics' lien under sections 1311.01 to 1311.22 of the Revised Code, the owner, part owner, or lessee who contracts for the labor, work, or materials shall record in the office of the county recorder for each county in which the real property to be improved is located a notice of commencement in substantially the form specified in division (B) of this section.",
          "citation": "Ohio Rev. Code § 1311.04(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q4",
          "text": "This section does not apply to any improvement made pursuant to a home construction contract as defined in section 1311.011 of the Revised Code.",
          "citation": "Ohio Rev. Code § 1311.05(E)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q5",
          "text": "No original contractor has to serve a notice of furnishing to preserve lien rights arising from a contract with an owner, part owner, or lessee.",
          "citation": "Ohio Rev. Code § 1311.05(A)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q6",
          "text": "No laborer must serve a notice of furnishing in accordance with this section to preserve lien rights.",
          "citation": "Ohio Rev. Code § 1311.05(G)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q7",
          "text": "If the lien arises in connection with a one- or two-family dwelling or in connection with a residential unit of condominium property as defined in Chapter 5311. of the Revised Code, within sixty days from the date on which the last labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q8",
          "text": "within seventy-five days from the date on which the last of the labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(3)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q9",
          "text": "If the lien arises under section 1311.021 of the Revised Code, within one hundred twenty days from the date on which the last labor or work was performed or material was furnished by the person claiming the lien",
          "citation": "Ohio Rev. Code § 1311.06(B)(2)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q10",
          "text": "shall serve a copy of the affidavit on the owner, part owner, or lessee of the improved property or his designee, within thirty days after filing the affidavit",
          "citation": "Ohio Rev. Code § 1311.07",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q11",
          "text": "(C) Liens under sections 1311.01 to 1311.22 of the Revised Code continue in force for six years after an affidavit is filed in the office of the county recorder under section 1311.06 of the Revised Code. If an action is brought to enforce the lien within that time, the lien continues in force until final adjudication thereof.",
          "citation": "Ohio Rev. Code § 1311.13(C)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q12",
          "text": "(A)(1) The owner, part owner, lessee, mortgagee, or any other person with an interest in real property upon which a lien has been taken, or any original contractor or subcontractor who has provided a bond, cash deposit, general obligation of any state government or of the United States government, obligation insured by an agency of the United States government, or other reasonable security in accordance with division (C) of this section, may notify the lienholder to commence suit on the lien, by written notice delivered to the lienholder in one of the following manners:",
          "citation": "Ohio Rev. Code § 1311.11(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q13",
          "text": "Except as otherwise provided in this section, the notice to commence suit shall be served by the sheriff of the county in which the land upon which the lien has been taken is situated, upon payment of the same mileage and fees as provided by law with respect to the service of summons.",
          "citation": "Ohio Rev. Code § 1311.11(A)(1)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q14",
          "text": "If the lienholder fails to commence suit upon the lien within sixty days after completion of service upon him of the notice to commence suit, or if the action is commenced but dismissed with prejudice before adjudication, the lien is void and the property wholly discharged from the lien.",
          "citation": "Ohio Rev. Code § 1311.11(B)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q15",
          "text": "(O) This section does not apply to a home construction contract as defined in section 1311.011 of the Revised Code, except that when a lending institution as defined in division (A)(3) of section 1311.011 of the Revised Code requires that a notice of commencement be recorded as part of the financing for a home construction contract, which is secured in whole or in part by a mortgage on real estate upon which the improvements are to be constructed, the owner, part owner, or lessee may file a notice of commencement pursuant to this section",
          "citation": "Ohio Rev. Code § 1311.04(O)",
          "url": "https://web.archive.org/web/20260520002650id_/https://codes.ohio.gov/ohio-revised-code/chapter-1311",
          "sourceId": "oh-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-05-20"
        },
        {
          "id": "oh-q16",
          "text": "The time within which an act is required by law to be done shall be computed by excluding the first and including the last day;",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q17",
          "text": "except that, when the last day falls on Sunday or a legal holiday, the act may be done on the next succeeding day that is not Sunday or a legal holiday.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q18",
          "text": "\"Legal holiday\" as used in this section means the following days:",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q19",
          "text": "(A) The first day of January, known as New Year's day; (B) The third Monday in January, known as Martin Luther King day; (C) The third Monday in February, known as Washington-Lincoln day; (D) The day designated in the \"Act of June 28, 1968,\" 82 Stat. 250, 5 U.S.C. 6103, as amended, for the commemoration of Memorial day; (E) The nineteenth day of June, known as Juneteenth day; (F) The fourth day of July, known as Independence day; (G) The first Monday in September, known as Labor day; (H) The second Monday in October, known as Columbus day; (I) The eleventh day of November, known as Veterans' day; (J) The fourth Thursday in November, known as Thanksgiving day; (K) The twenty-fifth day of December, known as Christmas day;",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-10-03",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q20",
          "text": "(L) Any day appointed and recommended by the governor of this state or the president of the United States as a holiday.",
          "citation": "Ohio Rev. Code § 1.14(L)",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q21",
          "text": "If any day designated in this section as a legal holiday falls on Sunday, the next succeeding day is a legal holiday.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        },
        {
          "id": "oh-q22",
          "text": "When a public office in which an act, required by law, is to be performed is closed to the public for the entire day that constitutes the last day for doing the act or before its usual closing time on that day, the act may be performed on the next succeeding day that is not a Sunday or a legal holiday as defined in this section.",
          "citation": "Ohio Rev. Code § 1.14",
          "url": "https://web.archive.org/web/20260612180452id_/https://codes.ohio.gov/ohio-revised-code/section-1.14",
          "sourceId": "oh-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-12"
        }
      ],
      "rules": [
        {
          "id": "oh-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "Where a notice of commencement is recorded; not for an improvement under a home construction contract",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "laterOf": [
                "first-furnishing",
                "notice-of-commencement"
              ]
            },
            "period": {
              "unit": "days",
              "n": 21
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q1",
            "oh-q2",
            "oh-q3",
            "oh-q4"
          ]
        },
        {
          "id": "oh-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q5"
          ]
        },
        {
          "id": "oh-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q6"
          ]
        },
        {
          "id": "oh-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q7"
          ]
        },
        {
          "id": "oh-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 75
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q8"
          ]
        },
        {
          "id": "oh-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If the lien arises under section 1311.021 of the Revised Code",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q9"
          ]
        },
        {
          "id": "oh-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner, part owner or lessee of the improved property, or the designee"
          ],
          "delivery": null,
          "quoteIds": [
            "oh-q10"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "oh-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "If an action to enforce the lien is brought within that time, the lien continues in force until final adjudication.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "oh-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "After a notice to commence suit, given by the owner, part owner, lessee, mortgagee or another person with an interest in the real property, or by an original contractor or subcontractor who has provided a bond or other reasonable security, is served",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "60 days after service of the notice to commence suit is completed"
          },
          "consequence": "If the lienholder does not commence suit within that time, or the action is commenced but dismissed with prejudice before adjudication, the lien is void and the property is wholly discharged from it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "oh-q12",
            "oh-q13",
            "oh-q14"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Before any labor, work or materials are furnished for the improvement, the owner, part owner or lessee who contracts for them records a notice of commencement. This does not apply to a home construction contract, although the owner may record one when a lending institution requires it as part of the financing.",
          "quoteIds": [
            "oh-q3",
            "oh-q15"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "In these rules, residential means a one- or two-family dwelling or a residential unit of condominium property.",
        "quoteIds": [
          "oh-q7"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "oh-q16"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "oh-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington-Lincoln day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial day",
            "quoteId": "oh-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": false,
            "modelNote": "1.14(D) points to the day designated in 5 U.S.C. 6103 (the last Monday in May)."
          },
          {
            "name": "Juneteenth day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving day",
            "quoteId": "oh-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas day",
            "quoteId": "oh-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "oh-q18",
          "oh-q19",
          "oh-q20",
          "oh-q21"
        ],
        "closure": {
          "clause": "on which the public office where the act is to be performed is closed to the public for the entire day or before its usual closing time",
          "place": "the office",
          "quoteIds": [
            "oh-q22"
          ]
        }
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the lien affidavit is filed",
          "input": "Lien affidavit filed on",
          "hint": "Leave empty if no lien affidavit has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "oh-0",
        "oh-1"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "OK",
      "name": "Oklahoma",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "42 O.S. §§ 141 to 178",
      "statuteUrl": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
      "summary": "Oklahoma gives an original contractor four months, and a subcontractor, an artisan or day laborer, or a person furnishing material or equipment to a subcontractor ninety days, after material or equipment was last furnished or labor last performed to file a lien statement with the county clerk, and an action to enforce the lien must be brought within one year after the lien is filed. A claimant other than an original contractor sends a pre-lien notice to the original contractor and an owner of the property before filing the lien statement and no later than seventy-five days after the last supply, except for an aggregate claim under $10,000 or a residential project of four or fewer dwelling units, none occupied by an owner, unless the property is then occupied as a dwelling by an owner.",
      "effectiveOrAmended": "Section 142.6 (pre-lien notice) was last amended by Laws 2025, c. 486, § 505, effective January 1, 2026. Section 143 was last amended by Laws 2013, c. 78, § 2, effective November 1, 2013, section 143.1 by Laws 2010, c. 148, § 1, effective November 1, 2010, section 142 by Laws 1980, c. 216, § 2, section 177 by Laws 1995, c. 338, § 21, and section 172 by Laws 1977, c. 207, § 13.",
      "quotes": [
        {
          "id": "ok-q1",
          "text": "Prior to the filing of a lien statement pursuant to Section 143.1 of this title, but no later than seventy-five (75) days after the last date of supply of material, services, labor, or equipment in which the claimant is entitled or may be entitled to lien rights, the claimant shall send to the last-known address of the original contractor and an owner of the property a pre-lien notice pursuant to the provisions of this section.",
          "citation": "42 O.S. § 142.6(B)(1)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q2",
          "text": "Provided further, no lien affecting property then occupied as a dwelling by an owner shall be valid unless the pre-lien notice provided in this section was sent within seventy-five (75) days of the last furnishing of materials, services, labor or equipment by the claimant.",
          "citation": "42 O.S. § 142.6(B)(1)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q3",
          "text": "A. For the purposes of this section: 1. “Claimant” means a person, other than an original contractor, that is entitled or may be entitled to a lien pursuant to Section 141 of this title; and",
          "citation": "42 O.S. § 142.6(A)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q4",
          "text": "5. A rebuttable presumption of compliance with paragraph 1 of this subsection shall be created if the pre-lien notice is sent as follows: a. hand delivery supported by a delivery confirmation receipt, b. automated transaction pursuant to Section 15-115 of Title 12A of the Oklahoma Statutes, or c. certified mail, return receipt requested. Notice by certified mail, return receipt requested, shall be effective on the date mailed.",
          "citation": "42 O.S. § 142.6(B)(5)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q5",
          "text": "D. Failure of the claimant to comply with the pre-lien notice requirements of this section shall render that portion of the lien claim for which no notice was sent invalid and unenforceable.",
          "citation": "42 O.S. § 142.6(D)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q6",
          "text": "3. Except as otherwise required in paragraph 1 of this subsection, the pre-lien notice requirements shall not apply to a claimant: a. whose claim relates to the supply of material, services, labor, or equipment furnished in connection with a residential project. For the purposes of this subparagraph, the term “residential” shall mean a single family or multifamily project of four or fewer dwelling units, none of which are occupied by an owner, or b. whose aggregate claim is less than Ten Thousand Dollars ($10,000.00).",
          "citation": "42 O.S. § 142.6(B)(3)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q7",
          "text": "Any person claiming a lien as aforesaid shall file in the office of the county clerk of the county in which the land is situated a statement setting forth the amount claimed and the items thereof as nearly as practicable, the names of the owner, the contractor, the claimant, and a legal description of the property subject to the lien, verified by affidavit.",
          "citation": "42 O.S. § 142",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q8",
          "text": "Such statement shall be filed within four (4) months after the date upon which material or equipment used on said land was last furnished or labor last performed under contract as aforesaid; and if the claim be for the planting of any trees, vines, plants, or hedge, such statement shall be filed within four (4) months from such planting.",
          "citation": "42 O.S. § 142",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q9",
          "text": "Any person who shall furnish any such material or lease or rent equipment used on said land or perform such labor as a subcontractor, or as an artisan or day laborer in the employ of the contractor, may obtain a lien upon such land, or improvements, or both, from the same time, in the same manner, and to the same extent as the original contractor, for the amount due for such material, equipment and labor, as well as any applicable profit and overhead costs due to the person;",
          "citation": "42 O.S. § 143",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q10",
          "text": "and any artisan or day laborer in the employ of, and any person furnishing material or equipment used on said land to, such subcontractor may obtain a lien upon such land, or improvements, or both, for the same time, in the same manner, and to the same extent as the subcontractor, for the amount due for such material, equipment used on said land and labor, as well as any applicable profit and overhead costs due to the person, by filing with the county clerk of the county in which the land is situated, within ninety (90) days after the date upon which material or equipment used on said land was last furnished or labor last performed under such subcontract, a statement, verified by affidavit, setting forth the amount due from the contractor to the claimant, and the items thereof, as nearly as practicable, the name of the owner, the name of the contractor, the name of the claimant, and a legal description of the property upon which a lien is claimed.",
          "citation": "42 O.S. § 143",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q11",
          "text": "A. Within five (5) business days after the date of the filing of the lien statement provided for in Sections 142 and 143 of this title, a notice of the lien shall be mailed by certified mail, return receipt requested, to the owner of the property on which the lien attaches.",
          "citation": "42 O.S. § 143.1(A)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q12",
          "text": "The claimant shall furnish to the county clerk the last-known mailing address of the person or persons against whom the claim is made and the owner of the property.",
          "citation": "42 O.S. § 143.1(A)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q13",
          "text": "The notice shall be mailed by the county clerk.",
          "citation": "42 O.S. § 143.1(A)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q14",
          "text": "Provided that, if with due diligence the person against whom the claim is made or the owner of the property cannot be found, the claimant after filing an affidavit setting forth such facts may, within sixty (60) days of the filing of the lien statement, serve a copy of the notice upon the occupant of the property or the occupant of the improvements, as the case may be, in a like manner as is provided for service upon the owner thereof, or, if the same be unoccupied, the claimant may post a copy in a conspicuous place upon the property or any improvements thereon.",
          "citation": "42 O.S. § 143.1(B)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q15",
          "text": "Any lien provided for by this chapter may be enforced by civil action in the district court of the county in which the land is situated, and such action shall be brought within one (1) year from the time of the filing of said lien with the county clerk.",
          "citation": "42 O.S. § 172",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q16",
          "text": "Provided, that if no action to foreclose or adjudicate any lien filed under the provisions of this chapter shall be instituted within one (1) year from the filing of said lien, the lien is canceled by limitation of law.",
          "citation": "42 O.S. § 177",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os42.pdf",
          "sourceId": "ok-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q17",
          "text": "C. Any act authorized, required, or permitted to be performed on a holiday as designated in subsection A of this section may be performed on the next succeeding business day, and no liability or loss of rights of any kind shall result from such delay.",
          "citation": "25 O.S. § 82.1(C)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q18",
          "text": "A. The designation and dates of holidays in Oklahoma shall be as follows: Each Saturday, Sunday, New Year's Day on the 1st day of January, Martin Luther King, Jr.'s Birthday on the third Monday in January, Presidents' Day on the third Monday in February, Memorial Day on the last Monday in May, Independence Day on the 4th day of July, Labor Day on the first Monday in September, Veterans' Day on the 11th day of November, Thanksgiving Day on the fourth Thursday in November, the day after Thanksgiving Day, Christmas on the 25th day of December, the day before or after Christmas if Christmas is not on a Saturday or Sunday, the Thursday and Friday before Christmas if Christmas is on a Saturday, the Monday and Tuesday after Christmas, if Christmas is on a Sunday; and if any of such holidays other than Christmas fall on Saturday, the preceding Friday shall be a holiday in that year and if any of such holidays other than Christmas fall on Sunday, the succeeding Monday shall be a holiday in that year.",
          "citation": "25 O.S. § 82.1(A)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q19",
          "text": "B. The Governor shall issue an Executive Order each year specifying the dates on which the holidays other than Saturdays and Sundays designated in subsection A of this section occur.",
          "citation": "25 O.S. § 82.1(B)",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q20",
          "text": "Any act authorized, required or permitted to be performed on any holiday as designated",
          "citation": "25 O.S. § 82.2",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q21",
          "text": "in this section may and shall be performed on said day the same as on any business day; provided any state, national or federal reserve bank, building and loan association, credit union, state, federal, county or municipal office may close on any day designated in this section as a holiday, and, upon such bank, building and loan association, credit union, or public office being closed on such day, any act authorized, required or permitted to be performed at or by such bank, building and loan association, credit union, public office or public official may be performed on the next succeeding business day and no liability or loss of rights of any kind shall result from such delay.",
          "citation": "25 O.S. § 82.2",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "ok-q22",
          "text": "The following additional days are designated as holidays: Jefferson Day on the 13th day of April; Oklahoma Day on the 22nd day of April; Mother's Day on the second Sunday in May; Juneteenth National Freedom Day on the third Saturday in June; Indian Day on the first Saturday after the full moon in September; Cherokee Strip Day on the 16th day of September; Will Rogers Day on the 4th day of November; Citizenship Recognition Day on such date as may be fixed by the Governor; Oklahoma Historical Day on the 10th day of October; Senior Citizens' Week beginning with the first Sunday in the month of May; Senior Citizens' Day the Wednesday of Senior Citizens' Week; Grandparents' Week beginning with the second Sunday in September; Youth Day on the third Sunday in March each year; each day in which a state election is held throughout the State of Oklahoma; and such other days as may be designated by the President of the United States or the Governor of the State of Oklahoma.",
          "citation": "25 O.S. § 82.2",
          "url": "https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os25.pdf",
          "sourceId": "ok-1",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "ok-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 75
            }
          },
          "notComputed": null,
          "consequence": "Failure to comply renders that portion of the lien claim for which no notice was sent invalid and unenforceable. No lien affecting property then occupied as a dwelling by an owner is valid unless the pre-lien notice was sent within seventy-five days of the last furnishing by the claimant.",
          "recipients": [
            "The original contractor",
            "An owner of the property"
          ],
          "delivery": "Sent to the last-known address. Sending it by hand delivery supported by a delivery confirmation receipt, by automated transaction, or by certified mail, return receipt requested, creates a rebuttable presumption of compliance, and notice by certified mail is effective on the date mailed.",
          "quoteIds": [
            "ok-q1",
            "ok-q2",
            "ok-q3",
            "ok-q4",
            "ok-q5"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last date of supply of material, services, labor, or equipment"
            }
          ],
          "mayChangeIf": "the lien statement is filed on or before that day",
          "mayChangeDirection": "earlier",
          "mayChangeEvent": "lien-recorded",
          "mayChangeOffsetDays": -1
        },
        {
          "id": "ok-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a claimant whose claim relates to a residential project, a single family or multifamily project of four or fewer dwelling units, none of which are occupied by an owner, or whose aggregate claim is less than Ten Thousand Dollars ($10,000.00), except for a lien affecting property then occupied as a dwelling by an owner",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ok-q6",
            "ok-q2"
          ]
        },
        {
          "id": "ok-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ok-q3"
          ]
        },
        {
          "id": "ok-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ok-q7",
            "ok-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the date upon which material or equipment used on said land was last furnished or labor last performed under contract"
            }
          ]
        },
        {
          "id": "ok-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ok-q9",
            "ok-q10"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the date upon which material or equipment used on said land was last furnished or labor last performed under such subcontract"
            }
          ]
        },
        {
          "id": "ok-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within five (5) business days after the date of the filing of the lien statement"
          },
          "consequence": null,
          "recipients": [
            "The owner of the property on which the lien attaches"
          ],
          "delivery": "A notice of the lien mailed by the county clerk, by certified mail, return receipt requested, to the last-known mailing address the claimant furnishes to the county clerk",
          "quoteIds": [
            "ok-q11",
            "ok-q12",
            "ok-q13"
          ]
        },
        {
          "id": "ok-service-1",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If with due diligence the person against whom the claim is made or the owner of the property cannot be found, after the claimant files an affidavit setting forth such facts",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The occupant of the property or the occupant of the improvements"
          ],
          "delivery": "A copy of the notice served in a like manner as is provided for service upon the owner, or, if the property is unoccupied, posted in a conspicuous place upon the property or any improvements thereon",
          "quoteIds": [
            "ok-q14"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien statement is filed"
            }
          ]
        },
        {
          "id": "ok-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": "If no action to foreclose or adjudicate the lien is instituted within one year from the filing of the lien, the lien is canceled by limitation of law.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ok-q15",
            "ok-q16"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien statement is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": null,
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "ok-q17",
            "ok-q18"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ok-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s Birthday",
            "quoteId": "ok-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "ok-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "ok-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "ok-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "ok-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "ok-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ok-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The day after Thanksgiving Day",
            "quoteId": "ok-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas",
            "quoteId": "ok-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ok-q18",
          "ok-q19"
        ],
        "closure": {
          "clause": "that falls on a holiday designated in 25 O.S. § 82.2 on which the public office where the act is to be performed is closed",
          "place": "the public office",
          "quoteIds": [
            "ok-q20",
            "ok-q21",
            "ok-q22"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "the day before or after Christmas",
            "reason": "25 O.S. § 82.1(B) leaves its date to the Governor's yearly Executive Order"
          },
          {
            "name": "the Thursday and Friday before Christmas when Christmas is on a Saturday",
            "reason": "days that depend on the weekday on which Christmas falls"
          },
          {
            "name": "the Monday and Tuesday after Christmas when Christmas is on a Sunday",
            "reason": "days that depend on the weekday on which Christmas falls"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "material or equipment was last furnished or labor last performed",
          "input": "Material or equipment last furnished, or labor last performed, on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the lien statement is filed",
          "input": "Lien statement filed with the county clerk on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ok-0",
        "ok-1"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "OR",
      "name": "Oregon",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "ORS 87.001 to 87.093",
      "statuteUrl": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
      "summary": "Oregon requires a person claiming a lien for labor, materials or rented equipment to perfect it by filing a claim of lien not later than 75 days after the person has ceased to provide labor, rent equipment or furnish materials or 75 days after completion of construction, whichever is earlier, and the lien binds the improvement for no longer than 120 days after the claim is filed unless suit is brought within that time, or, where extended payment terms are stated in the claim, 120 days after the extended payment expires, never more than two years after filing. Except where the work or materials are furnished at the owner's request, and except for labor, labor and material, or rented equipment on a commercial improvement, a lien may be perfected only to the extent that a notice of right to a lien is given to the owner, and only for what is provided after a date eight days, not including Saturdays, Sundays and other holidays, before the notice is delivered or mailed.",
      "effectiveOrAmended": "Sections 87.035 (perfecting the lien), 87.039 (notice of filing), 87.055 (duration of the lien) and 87.057 (notice of intent to foreclose) were last amended in 1987 (chapter 662), section 87.021 (notice of right to a lien) in 2003 (chapter 778), section 87.045 (completion) in 2005 (chapter 22) and section 87.093 (Information Notice to Owner) in 2009 (chapter 408).",
      "quotes": [
        {
          "id": "or-q1",
          "text": "Except when material, equipment, services or labor described in ORS 87.010 (1) to (3), (5) and (6) is furnished at the request of the owner, a person furnishing any materials, equipment, services or labor described in ORS 87.010 (1) to (3), (5) and (6) for which a lien may be perfected under ORS 87.035 shall give a notice of right to a lien to the owner of the site.",
          "citation": "ORS 87.021(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q2",
          "text": "The notice of right to a lien may be given at any time during the progress of the improvement, but the notice only protects the right to perfect a lien for materials, equipment and labor or services provided after a date which is eight days, not including Saturdays, Sundays and other holidays as defined in ORS 187.010, before the notice is delivered or mailed.",
          "citation": "ORS 87.021(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q3",
          "text": "Except as provided in paragraph (b) of this subsection, a lien created under ORS 87.010 (1) to (3), (5) or (6) may be perfected under ORS 87.035 only to the extent that the notice required by subsection (1) of this section is given.",
          "citation": "ORS 87.021(3)(a)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q4",
          "text": "Except as provided in ORS 87.093, all notices required under ORS 87.001 to 87.060 and 87.075 to 87.093 must be in writing and be delivered in person or by registered or certified mail.",
          "citation": "ORS 87.018(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q5",
          "text": "No lien for materials or supplies shall have priority over any recorded mortgage or trust deed on either the land or improvement unless the person furnishing the material or supplies, not later than eight days, not including Saturdays, Sundays and other holidays as defined in ORS 187.010, after the date of delivery of material or supplies for which a lien may be claimed delivers to the mortgagee either a copy of the notice given to the owner under ORS 87.021 to protect the right to claim a lien on the material or supplies or a notice in any form that provides substantially the same information as the form set forth in ORS 87.023.",
          "citation": "ORS 87.025(3)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q6",
          "text": "A person who performs labor upon a commercial improvement or provides labor and material for a commercial improvement or who rents equipment used in the construction of a commercial improvement need not give the notice required by subsection (1) of this section in order to perfect a lien created under ORS 87.010. As used in this paragraph: (A) Commercial improvement means any structure or building not used or intended to be used as a residential building, or other improvements to a site on which such a structure or building is to be located. (B) Residential building means a building or structure that is or will be occupied by the owner as a residence and that contains not more than four units capable of being used as residences or homes.",
          "citation": "ORS 87.021(3)(b)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q7",
          "text": "Each original contractor shall deliver a copy of the Information Notice to Owner adopted by the board under this section to: (a) The first purchaser of residential property constructed by the contractor and sold before or within the 75-day period immediately following the completion of construction; and (b) The owner or an agent of the owner, other than an original contractor, at the time of signing a residential construction or improvement contract with the owner.",
          "citation": "ORS 87.093(2)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q8",
          "text": "This section applies only to a residential construction or improvement contract for which the aggregate contract price exceeds $2,000.",
          "citation": "ORS 87.093(4)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q9",
          "text": "Notwithstanding subsections (2) and (4) of this section, the original contractor need not send the owner an Information Notice to Owner if the owner is a contractor licensed with the board under ORS chapter 701.",
          "citation": "ORS 87.093(5)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q10",
          "text": "The contractor shall deliver the Information Notice to Owner personally, by registered or certified mail or by first class mail with certificate of mailing.",
          "citation": "ORS 87.093(3)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q11",
          "text": "Notwithstanding ORS 87.010 and 87.030, if an original contractor does not deliver an owner or agent with an Information Notice to Owner as required under subsections (2) to (4) of this section, the original contractor may not claim any lien created under ORS 87.010 upon any improvement, lot or parcel of land of the owner for labor, services or materials supplied under the residential construction or improvement contract for which the original contractor failed to deliver the required Information Notice to Owner.",
          "citation": "ORS 87.093(6)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q12",
          "text": "A person intending to foreclose a lien shall deliver to the owner of the property upon which the lien is claimed and to the mortgagee a notice in writing not later than 10 days prior to commencement of the suit stating that such person, or others, intends to commence suit to foreclose the lien.",
          "citation": "ORS 87.057(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q13",
          "text": "No costs, disbursements or attorney fees otherwise allowable as provided by ORS 87.060 shall be allowed to any party failing to comply with the provisions of this section.",
          "citation": "ORS 87.057(3)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q14",
          "text": "Every person claiming a lien created under ORS 87.010 (1) or (2) shall perfect the lien not later than 75 days after the person has ceased to provide labor, rent equipment or furnish materials or 75 days after completion of construction, whichever is earlier.",
          "citation": "ORS 87.035(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q15",
          "text": "A lien created under ORS 87.010 shall be perfected by filing a claim of lien with the recording officer of the county or counties in which the improvement, or some part thereof, is situated.",
          "citation": "ORS 87.035(2)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q16",
          "text": "The completion of construction of an improvement shall occur when: (a) The improvement is substantially complete; (b) A completion notice is posted and recorded as provided by subsections (2) and (3) of this section; or (c) The improvement is abandoned as provided by subsection (5) of this section.",
          "citation": "ORS 87.045(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q17",
          "text": "Except as provided in subsection (6) of this section, an improvement is abandoned: (a) On the 75th day after work on the construction of the improvement ceases; or (b) When the owner or mortgagee of the improvement or an agent of either posts and records an abandonment notice in writing signed by either the owner or the mortgagee.",
          "citation": "ORS 87.045(5)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q18",
          "text": "A person filing a claim of lien pursuant to ORS 87.035 shall mail to the owner and to the mortgagee a notice in writing that the claim has been filed. A copy of the claim of lien shall be attached to the notice. The notice shall be mailed not later than 20 days after the date of filing.",
          "citation": "ORS 87.039(1)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q19",
          "text": "No costs, disbursements or attorney fees otherwise allowable as provided by ORS 87.060 shall be allowed to any party failing to comply with subsection (1) of this section.",
          "citation": "ORS 87.039(2)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q20",
          "text": "No lien created under ORS 87.010 shall bind any improvement for a longer period than 120 days after the claim of lien is filed unless suit is brought in a proper court within that time to enforce the lien, or if extended payment is provided and the terms thereof are stated in the claim of lien, then 120 days after the expiration of such extended payment, but no lien shall be continued in force for a longer time than two years from the time the claim of lien is filed under ORS 87.035 by any agreement to extend payment.",
          "citation": "ORS 87.055",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q21",
          "text": "When all original contractors employed on the construction of an improvement have substantially performed their contracts, any original contractor, the owner or mortgagee, or an agent of any of them may post and record a completion notice.",
          "citation": "ORS 87.045(2)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q22",
          "text": "Within five days from the date of posting the notice, the party posting it or the agent of the party shall record with the recording officer of the county in which the property, or some part thereof, is situated, a copy of the notice, together with an affidavit indorsed thereon or attached thereto, made by the person posting the notice, stating the date, place and manner of posting the notice.",
          "citation": "ORS 87.045(3)",
          "url": "https://web.archive.org/web/20260411222206id_/https://www.oregonlegislature.gov/bills_laws/ors/ors087.html",
          "sourceId": "or-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-11"
        },
        {
          "id": "or-q23",
          "text": "The time within which an act is to be done, as provided in the civil and criminal procedure statutes, is computed by excluding the first day and including the last day, unless the last day falls upon any legal holiday or on Saturday, in which case the last day is also excluded.",
          "citation": "ORS 174.120(1)",
          "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
          "sourceId": "or-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-19"
        },
        {
          "id": "or-q24",
          "text": "For the purposes of determining whether a person has complied with a statutory time limitation governing an act to be performed in a circuit court, the Oregon Tax Court, the Court of Appeals or the Supreme Court, the time prescribed by law for the performance of the act does not include the day on which the specified period begins to run. The designated period does include the last day unless the last day is: (a) A legal holiday or Saturday; (b) A day on which the court is closed for the purpose of filing pleadings and other documents; (c) A day on which the court is closed by order of the Chief Justice, to the extent provided by the order; or (d) A day on which the court is closed before the end of the normal hours during which pleadings and other documents may be filed.",
          "citation": "ORS 174.120(2)",
          "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
          "sourceId": "or-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-19"
        },
        {
          "id": "or-q25",
          "text": "Any act authorized, required or permitted to be performed on a holiday as designated in this section may be performed on the next succeeding business day; and no liability or loss of rights of any kind shall result from such delay.",
          "citation": "ORS 187.010(3)",
          "url": "https://web.archive.org/web/20260606100201id_/https://www.oregonlegislature.gov/bills_laws/ors/ors187.html",
          "sourceId": "or-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-06"
        },
        {
          "id": "or-q26",
          "text": "The following days are legal holidays in this state: (a) Each Sunday. (b) New Years Day on January 1. (c) Martin Luther King, Jr.s Birthday on the third Monday in January. (d) Presidents Day, for the purpose of commemorating Presidents Washington and Lincoln, on the third Monday in February. (e) Memorial Day on the last Monday in May. (f) Juneteenth on June 19. (g) Independence Day on July 4. (h) Labor Day on the first Monday in September. (i) Veterans Day on November 11. (j) Thanksgiving Day on the fourth Thursday in November. (k) Christmas Day on December 25.",
          "citation": "ORS 187.010(1)",
          "url": "https://web.archive.org/web/20260606100201id_/https://www.oregonlegislature.gov/bills_laws/ors/ors187.html",
          "sourceId": "or-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-06"
        },
        {
          "id": "or-q27",
          "text": "Each time a holiday, other than Sunday, listed in subsection (1) of this section falls on Sunday, the succeeding Monday shall be a legal holiday. Each time a holiday listed in subsection (1) of this section falls on Saturday, the preceding Friday shall be a legal holiday.",
          "citation": "ORS 187.010(2)",
          "url": "https://web.archive.org/web/20260606100201id_/https://www.oregonlegislature.gov/bills_laws/ors/ors187.html",
          "sourceId": "or-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-06"
        },
        {
          "id": "or-q28",
          "text": "In addition to those specified in ORS 187.010, the following days are legal holidays in this state: (1) Every day appointed by the Governor as a holiday. (2) Every day appointed by the President of the United States as a day of mourning, rejoicing or other special observance only when the Governor also appoints that day as a holiday.",
          "citation": "ORS 187.020",
          "url": "https://web.archive.org/web/20260606100201id_/https://www.oregonlegislature.gov/bills_laws/ors/ors187.html",
          "sourceId": "or-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-06"
        },
        {
          "id": "or-q29",
          "text": "Notwithstanding ORCP 10 and ORS 174.120 (1), if a time period is prescribed or allowed for personal service of a document or notice on a public officer or the filing of a document or notice with a public office, other than a time period subject to ORS 174.120 (2), and if the last day falls on a day when that particular office is closed before the end of or for all of the normal work day, the last day shall be excluded in computing the period of time within which the document or notice is to be filed. If the last day is so excluded, the time period runs until the close of office hours on the next day the office is open for business.",
          "citation": "ORS 174.125",
          "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
          "sourceId": "or-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-19"
        },
        {
          "id": "or-q30",
          "text": "If the last day of a designated period is excluded under the provisions of subsection (2) of this section, the act must be performed on the next day that the court is open for the purpose of filing pleadings and other documents.",
          "citation": "ORS 174.120(3)",
          "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
          "sourceId": "or-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-19"
        },
        {
          "id": "or-q31",
          "text": "The provisions of subsections (2) and (3) of this section apply to time limitations established by statutes of limitation and other procedural statutes governing civil and criminal proceedings.",
          "citation": "ORS 174.120(4)",
          "url": "https://web.archive.org/web/20260219082727id_/https://www.oregonlegislature.gov/bills_laws/ors/ors174.html",
          "sourceId": "or-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-02-19"
        }
      ],
      "rules": [
        {
          "id": "or-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At any time during the progress of the improvement, for materials, equipment and labor or services provided after a date which is eight days, not including Saturdays, Sundays and other holidays, before the notice is delivered or mailed"
          },
          "consequence": "A lien may be perfected only to the extent that the notice is given.",
          "recipients": [
            "The owner of the site"
          ],
          "delivery": "In writing, delivered in person or by registered or certified mail",
          "quoteIds": [
            "or-q1",
            "or-q2",
            "or-q3",
            "or-q4"
          ]
        },
        {
          "id": "or-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a lien for materials or supplies to have priority over a recorded mortgage or trust deed on either the land or improvement",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Not later than eight days, not including Saturdays, Sundays and other holidays as defined in ORS 187.010, after the date of delivery of material or supplies"
          },
          "consequence": "Without it, no lien for materials or supplies has priority over any recorded mortgage or trust deed on either the land or improvement.",
          "recipients": [
            "The mortgagee"
          ],
          "delivery": null,
          "quoteIds": [
            "or-q5"
          ]
        },
        {
          "id": "or-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person who performs labor upon a commercial improvement, provides labor and material for a commercial improvement, or rents equipment used in the construction of a commercial improvement",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "or-q6"
          ]
        },
        {
          "id": "or-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "or-q1"
          ]
        },
        {
          "id": "or-preliminary-notice-4",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a residential construction or improvement contract for which the aggregate contract price exceeds $2,000, unless the owner is a contractor licensed with the Construction Contractors Board under ORS chapter 701",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "At the time of signing a residential construction or improvement contract with the owner"
          },
          "consequence": "If the original contractor does not deliver the Information Notice to Owner as required, it may not claim any lien created under ORS 87.010 for labor, services or materials supplied under that contract.",
          "recipients": [
            "The owner or an agent of the owner, other than an original contractor"
          ],
          "delivery": "Personally, by registered or certified mail or by first class mail with certificate of mailing",
          "quoteIds": [
            "or-q7",
            "or-q8",
            "or-q9",
            "or-q10",
            "or-q11"
          ]
        },
        {
          "id": "or-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Not later than 10 days prior to commencement of the suit"
          },
          "consequence": "No costs, disbursements or attorney fees otherwise allowable under ORS 87.060 are allowed to any party failing to comply.",
          "recipients": [
            "The owner of the property upon which the lien is claimed",
            "The mortgagee"
          ],
          "delivery": "In writing, delivered in person or by registered or certified mail",
          "quoteIds": [
            "or-q12",
            "or-q13",
            "or-q4"
          ]
        },
        {
          "id": "or-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 75
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 75
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "or-q14",
            "or-q15",
            "or-q16",
            "or-q17"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person has ceased to provide labor, rent equipment or furnish materials"
            },
            {
              "event": "completion",
              "clause": "completion of construction"
            }
          ]
        },
        {
          "id": "or-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "No costs, disbursements or attorney fees otherwise allowable under ORS 87.060 are allowed to any party failing to comply.",
          "recipients": [
            "The owner",
            "The mortgagee"
          ],
          "delivery": "A notice in writing that the claim has been filed, mailed with a copy of the claim of lien attached",
          "quoteIds": [
            "or-q18",
            "or-q19"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ]
        },
        {
          "id": "or-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "The lien does not bind the improvement for a longer period unless suit is brought in a proper court within that time to enforce it, and no agreement to extend payment continues it in force for longer than two years from the time the claim of lien is filed.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "or-q20"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed"
            }
          ],
          "mayChangeIf": "extended payment is provided and its terms are stated in the claim of lien",
          "mayChangeDirection": "later"
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Completion of construction occurs when the improvement is substantially complete, when a completion notice is posted and recorded, or when the improvement is abandoned. When all original contractors have substantially performed their contracts, any original contractor, the owner or mortgagee, or an agent of any of them may post a completion notice and record it within five days from the date of posting. An improvement is abandoned on the 75th day after work on its construction ceases, or when the owner or mortgagee or an agent of either posts and records an abandonment notice, unless a nonabandonment notice is posted and recorded.",
          "quoteIds": [
            "or-q16",
            "or-q21",
            "or-q22",
            "or-q17"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "or-q23",
            "or-q24"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "or-q25",
            "or-q26"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "or-q26",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr.'s Birthday",
            "quoteId": "or-q26",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents Day",
            "quoteId": "or-q26",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "or-q26",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "or-q26",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "or-q26",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "or-q26",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "or-q26",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "or-q26",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "or-q26",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "or-q26",
          "or-q27",
          "or-q28"
        ],
        "closure": {
          "clause": "for filing a document or notice with a public office that falls on a day when that office is closed before the end of or for all of the normal work day",
          "place": "the office",
          "quoteIds": [
            "or-q29"
          ]
        },
        "conditionalMove": {
          "day": "saturday",
          "condition": "when the time to do the act is provided in the civil and criminal procedure statutes, or the act is to be performed in a circuit court, the Oregon Tax Court, the Court of Appeals or the Supreme Court",
          "unknown": "whether ORS 174.120 reaches the act at this stage",
          "quoteIds": [
            "or-q23",
            "or-q24",
            "or-q30",
            "or-q31"
          ]
        }
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the person has ceased to provide labor, rent equipment or furnish materials",
          "input": "Ceased to provide labor, rent equipment or furnish materials on",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "completion of construction",
          "input": "Completion of construction on",
          "hint": "Under ORS 87.045, completion of construction occurs when the improvement is substantially complete, when a completion notice is posted and recorded, or when the improvement is abandoned."
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is filed",
          "input": "Claim of lien filed on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "or-0",
        "or-1",
        "or-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "RI",
      "name": "Rhode Island",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "R.I. Gen. Laws ch. 34-28",
      "statuteUrl": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
      "summary": "Except as section 34-28-7 provides for architects, engineers and their subcontractors, Rhode Island makes a mechanics' lien void and wholly lost unless the claimant, before or within two hundred days after doing the work or furnishing the materials, mails a notice of intention to the owner of record by registered or certified mail and files a copy in the land evidence records, and the lien is perfected only for work done and materials furnished during the two hundred days before the filing and after it. A complaint to enforce the lien and a notice of lis pendens must be filed within forty days of the recording of the notice of intention, and a person contracting directly with the owner, other than a material supplier, gives the owner a notice of possible mechanic's lien before commencing work or delivering materials.",
      "effectiveOrAmended": "Sections 34-28-4 (notice of intention) and 34-28-9 (effective period of notice) were last amended by P.L. 2008, ch. 75 and ch. 345, section 34-28-4.1 (contractors) by P.L. 2015, ch. 258 and ch. 279, and sections 34-28-7 (architects and engineers) and 34-28-10 (complaint and lis pendens) by P.L. 2006, ch. 630.",
      "quotes": [
        {
          "id": "ri-q1",
          "text": "No person contracting directly with either the owner of the land, lessee, or tenant of the land, or owner of less than the fee simple, other than material suppliers, as those terms are referred to in §§ 34-28-1, 34-28-2, 34-28-3, shall be entitled to claim a lien under this chapter unless that person shall have provided the following notice to the owner, lessee, or tenant, or owner of less than the fee simple, either incorporated conspicuously in a written contract or sent by certified mail, return receipt requested, any time prior to commencing work or delivery of materials for construction, erection, alteration or repair as set forth in this chapter.",
          "citation": "R.I. Gen. Laws § 34-28-4.1",
          "url": "https://web.archive.org/web/20251109223838id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.1.htm",
          "sourceId": "ri-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q2",
          "text": "However, such person failing to file such notice shall indemnify and hold harmless any owner, lessee or tenant, or owner of less than the fee simple from any payment or costs incurred on account of any liens claims by those not in privity with them, unless such owner, lessee or tenant, or owner of less than the fee simple shall not have paid such person.",
          "citation": "R.I. Gen. Laws § 34-28-4.1",
          "url": "https://web.archive.org/web/20251109223838id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.1.htm",
          "sourceId": "ri-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q3",
          "text": "The failure of such person contracting directly to give such notice shall not affect the right of any other person performing work or furnishing materials of claiming a lien pursuant to this chapter, provided that the procedures set forth in this chapter are followed.",
          "citation": "R.I. Gen. Laws § 34-28-4.1",
          "url": "https://web.archive.org/web/20251109223838id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.1.htm",
          "sourceId": "ri-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q4",
          "text": "(a) Except as provided in § 34-28-7, any and all liens claimed or that could be claimed under §§ 34-28-1, 34-28-2 or 34-28-3 shall be void and wholly lost to any person claiming under those sections unless the person shall, before or within two hundred (200) days after the doing of such work or the furnishing of such materials, mail by prepaid registered or certified mail, in either case return receipt requested, a notice of intention, hereinafter described, to do work or furnish material, or both, together with a statement that the person so mailing may within two hundred (200) days after the doing of the work or the furnishing of the materials, file a copy of such notice of intention in the records of land evidence in the city or town in which the land generally described in such notice of intention is located and a further statement that the mailing of the notice of intention and the filing of the copy will perfect a lien of the person so mailing against the land under and subject to the provisions of this chapter, to the owner of record of the land at the time of the mailing, or, in the case of a lien against the interest of any lessee or tenant, to the lessee or tenant,",
          "citation": "R.I. Gen. Laws § 34-28-4(a)",
          "url": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
          "sourceId": "ri-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q5",
          "text": "the mailing to be addressed to the last known residence or place of business of the owner or lessee or tenant, but if no residence or place of business is known or ascertainable by the person making the mailing by inquiry of the person with whom the person making the mailing is directly dealing or otherwise, then the mailing under this section shall be to the address of the land, and also shall before or within two hundred (200) days after the doing of the work or the furnishing of the materials file a copy of the notice of intention in the records of land evidence in the city or town in which the land generally described in the notice of lien is located.",
          "citation": "R.I. Gen. Laws § 34-28-4(a)",
          "url": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
          "sourceId": "ri-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q6",
          "text": "The mailing of the notice of intention and the filing of the copy in the land evidence records together with the mailing of another copy thereof as herein below provided shall perfect, subject to other sections of this chapter, the lien of the person so mailing and filing as to work done or materials furnished by the person during the two hundred (200) days prior to the filing and thereafter, but not as to work done or materials furnished by the person before the two hundred (200) days prior to the filing, any lien for which shall be void and wholly lost.",
          "citation": "R.I. Gen. Laws § 34-28-4(a)",
          "url": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
          "sourceId": "ri-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q7",
          "text": "A notice of lien recorded in the land evidence records pursuant to § 34-28-4 shall be effective for two hundred (200) days prior to the date of filing.",
          "citation": "R.I. Gen. Laws § 34-28-9",
          "url": "https://web.archive.org/web/20260919171153id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-9.htm",
          "sourceId": "ri-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-09-19"
        },
        {
          "id": "ri-q8",
          "text": "The lien, under §§ 34-28-1, 34-28-2 or 34-28-3, of any architect or engineer, or of any immediate or mediate subcontractor thereto, for work done in connection with the construction, erection, alteration, or reparation, the result of which is used therein, shall be valid and enforceable under the provisions of this chapter if and only if a notice of intention provided for in § 34-28-4, is mailed and filed in accordance therewith by the architect, engineer, or such subcontractor thereto, the mailing and filing in the land evidence records to be before the later of two hundred (200) days of the performance of the work or ten (10) days after the actual and visible commencement, by excavation or otherwise, of the construction, erection, alteration or reparation.",
          "citation": "R.I. Gen. Laws § 34-28-7",
          "url": "https://web.archive.org/web/20260609132607id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-7.htm",
          "sourceId": "ri-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-06-09"
        },
        {
          "id": "ri-q9",
          "text": "In the event that the notice of intention, having been mailed, shall be returned to the person mailing the notice, not having been delivered for any reason, the lien of the person so mailing shall be void and wholly lost, notwithstanding any other provision of this section, unless such person shall, within thirty (30) days after the return of the notice of intention, and in no event more than two hundred (200) days after the mailing of the notice, file the notice together with the envelope in which the notice was returned, in the place and manner and with the consequences hereinbefore provided for the filing of a copy of the notice of intention, and the filing shall be in lieu of any filing required at any other time under this section.",
          "citation": "R.I. Gen. Laws § 34-28-4(a)",
          "url": "https://web.archive.org/web/20251109212632id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-4.htm",
          "sourceId": "ri-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q10",
          "text": "(a) Any and all liens under the provisions of § 34-28-1, 34-28-2, 34-28-3, or 34-28-7 regardless of the mailing and filing of a notice of intention under § 34-28-4 or any exemption therefrom, shall be void and wholly lost to any person claiming a lien under those sections, unless the person shall file a complaint to enforce the lien, described in § 34-28-13, in the superior court for the county in which is situated the land upon which the building, canal, turnpike, railroad, or other improvement is being or has been constructed, erected, altered, or repaired, and unless such person shall also file in the records of land evidence in the city or town in which such land is located a notice of lis pendens, described in § 34-28-11, the complaint to be filed on the same day as the notice of lis pendens, or within seven (7) days thereafter, and both the complaint and the notice of lis pendens to be filed within forty (40) days of the date of the recording of the notice of intention provided in § 34-28-4 and § 34-28-7.",
          "citation": "R.I. Gen. Laws § 34-28-10(a)",
          "url": "https://web.archive.org/web/20251109224126id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-10.htm",
          "sourceId": "ri-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q11",
          "text": "The lien of any person under § 34-28-1, 34-28-2, 34-28-3 or 34-28-7 who fails to file a complaint and notice of lis pendens under this section within the required forty (40) day period, shall be void and wholly lost as to work done or materials furnished prior to the two hundred (200) day period, regardless of the fact that the person may thereafter do other work or furnish other materials in the course of the same construction, erection, alteration, or reparation.",
          "citation": "R.I. Gen. Laws § 34-28-10(a)",
          "url": "https://web.archive.org/web/20251109224126id_/https://webserver.rilegislature.gov/Statutes/TITLE34/34-28/34-28-10.htm",
          "sourceId": "ri-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-09"
        },
        {
          "id": "ri-q12",
          "text": "Whenever time is to be reckoned from any day, date, or act done, or the time of any act done, the day, date, or the day when the act is done shall not be included in the computation.",
          "citation": "R.I. Gen. Laws § 43-3-13",
          "url": "https://web.archive.org/web/20250502060313id_/https://webserver.rilegislature.gov/Statutes/TITLE43/43-3/43-3-13.htm",
          "sourceId": "ri-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-05-02"
        }
      ],
      "rules": [
        {
          "id": "ri-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Any time prior to commencing work or delivery of materials"
          },
          "consequence": "Without the notice, that person may not claim a lien under the chapter, and a person failing to give it indemnifies and holds harmless the owner, lessee or tenant, or owner of less than the fee simple from any payment or costs incurred on account of liens claimed by those not in privity with them, unless that owner has not paid that person. The failure does not affect any other person's claim of a lien under the chapter, provided that the procedures set forth in the chapter are followed.",
          "recipients": [
            "The owner, lessee, or tenant, or owner of less than the fee simple"
          ],
          "delivery": "Incorporated conspicuously in a written contract, or sent by certified mail, return receipt requested",
          "quoteIds": [
            "ri-q1",
            "ri-q2",
            "ri-q3"
          ]
        },
        {
          "id": "ri-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ri-q4",
            "ri-q5"
          ]
        },
        {
          "id": "ri-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before or within two hundred (200) days after the doing of the work or the furnishing of the materials"
          },
          "consequence": "Unless the notice is mailed, and a copy filed in the land evidence records, within that time, the lien is void and wholly lost.",
          "recipients": [
            "The owner of record of the land at the time of the mailing, or, for a lien against the interest of a lessee or tenant, the lessee or tenant"
          ],
          "delivery": "Prepaid registered or certified mail, return receipt requested, addressed to the last known residence or place of business, or to the address of the land if none is known or ascertainable",
          "quoteIds": [
            "ri-q4",
            "ri-q5"
          ]
        },
        {
          "id": "ri-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before or within two hundred (200) days after the doing of the work or the furnishing of the materials"
          },
          "consequence": "The mailing and the filing, together with the mailing of another copy \"as herein below provided\", perfect the lien, subject to the chapter's other sections, as to work done or materials furnished during the two hundred days prior to the filing and thereafter, and any lien for work done or materials furnished before those two hundred days is void and wholly lost.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ri-q4",
            "ri-q5",
            "ri-q6",
            "ri-q7"
          ]
        },
        {
          "id": "ri-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the lien of any architect or engineer, or of any immediate or mediate subcontractor thereto, for work done in connection with the construction, erection, alteration, or reparation, the result of which is used therein",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Before the later of two hundred (200) days of the performance of the work or ten (10) days after the actual and visible commencement, by excavation or otherwise, of the construction, erection, alteration or reparation"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ri-q8"
          ]
        },
        {
          "id": "ri-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If the mailed notice of intention is returned to the person mailing it, not having been delivered for any reason",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within thirty (30) days after the return of the notice of intention, and in no event more than two hundred (200) days after the mailing of the notice"
          },
          "consequence": "Otherwise the lien of the person so mailing is void and wholly lost. The notice is filed together with the envelope in which it was returned.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ri-q9"
          ]
        },
        {
          "id": "ri-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 40
            }
          },
          "notComputed": null,
          "consequence": "Unless both are filed within that time, the lien is void and wholly lost, and for a person who fails to file them within the forty days it is void and wholly lost as to work done or materials furnished prior to the two hundred day period.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ri-q10",
            "ri-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of intention is recorded"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ri-q12"
          ]
        },
        "rolling": null,
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": []
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the notice of intention is recorded",
          "input": "Notice of intention recorded in the land evidence records on",
          "hint": null
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "ri-0",
        "ri-1",
        "ri-2",
        "ri-3",
        "ri-4",
        "ri-5"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "SC",
      "name": "South Carolina",
      "status": "verified",
      "releaseBatch": 4,
      "statute": "S.C. Code tit. 29, ch. 5",
      "statuteUrl": "https://www.scstatehouse.gov/code/t29c005.php",
      "summary": "South Carolina dissolves a mechanics' lien unless, within ninety days after the person ceases to labor on or furnish labor or materials for the building or structure, the person serves a statement of account on the owner, or on the person in possession if the owner cannot be found, and files it with the register of deeds or clerk of court. The lien is also dissolved unless a suit to enforce it is commenced and a notice of pendency of the action filed within six months after the person ceases to labor on or furnish labor or material.",
      "effectiveOrAmended": "Section 29-5-120 (time for bringing suit) was amended by 2009 Act No. 40, effective June 2, 2009. Section 29-5-10 was last amended by 2003 Act No. 51, section 29-5-20 by 1999 Act No. 83 and section 29-5-23 (notice of project commencement) by 2000 Act No. 240. Section 29-5-90 (serving and filing the statement) was last amended in 1957.",
      "quotes": [
        {
          "id": "sc-q1",
          "text": "(B) In no event shall the aggregate amount of any liens filed by a sub-subcontractor or supplier exceed the amount due by the contractor to the subcontractor to whom the sub-subcontractor or supplier has supplied labor, material, or services unless the sub-subcontractor or supplier has provided notice of furnishing labor or materials by certified or registered mail to the contractor.",
          "citation": "S.C. Code § 29-5-20(B)",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q2",
          "text": "After receiving such notice, no payment by the contractor to the subcontractor will lessen the amount recoverable by the person so giving notice.",
          "citation": "S.C. Code § 29-5-20(B)",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q3",
          "text": "The failure to file a notice of project commencement shall render the provisions of Sections 29-5-20(B) and 29-5-60(B) inapplicable.",
          "citation": "S.C. Code § 29-5-23",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q4",
          "text": "Whenever work is done or material is furnished for the improvement of real estate upon the employment of a contractor or some other person than the owner and such laborer, mechanic, contractor or materialman shall in writing notify the owner of the furnishing of such labor or material and the amount or value thereof, the lien given by SECTION 29-5-20 shall attach upon the real estate improved as against the true owner for the amount of the work done or material furnished. But in no event shall the aggregate amount of liens set up hereby exceed the amount due by the owner on the contract price of the improvement made.",
          "citation": "S.C. Code § 29-5-40",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q5",
          "text": "(a) A person to whom a debt is due for labor performed or furnished or for materials furnished and actually used in the erection, alteration, or repair of a building or structure upon real estate or the boring and equipping of wells, by virtue of an agreement with, or by consent of, the owner of the building or structure, or a person having authority from, or rightfully acting for, the owner in procuring or furnishing the labor or materials shall have a lien upon the building or structure and upon the interest of the owner of the building or structure in the lot of land upon which it is situated to secure the payment of the debt due to him.",
          "citation": "S.C. Code § 29-5-10(a)",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q6",
          "text": "(A) Every laborer, mechanic, subcontractor, or person furnishing material for the improvement of real estate when the improvement has been authorized by the owner has a lien thereon, subject to existing liens of which he has actual or constructive notice, to the value of the labor or material so furnished, including the costs of the action and a reasonable attorney's fee which must be determined by the court in which the action is brought but only if the party seeking to enforce the lien prevails.",
          "citation": "S.C. Code § 29-5-20(A)",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q7",
          "text": "Such a lien shall be dissolved unless the person desiring to avail himself thereof, within ninety days after he ceases to labor on or furnish labor or materials for such building or structure, serves upon the owner or, in the event the owner cannot be found, upon the person in possession and files in the office of the register of deeds or clerk of court of the county in which the building or structure is situated a statement of a just and true account of the amount due him, with all just credits given, together with a description of the property intended to be covered by the lien sufficiently accurate for identification, with the name of the owner of the property, if known, which certificate shall be subscribed and sworn to by the person claiming the lien or by someone in his behalf and shall be recorded in a book kept for the purpose by the register or clerk who shall be entitled to the same fees therefor as for recording mortgages of equal length.",
          "citation": "S.C. Code § 29-5-90",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q8",
          "text": "Provided, that in the event neither the owner nor the person in possession can be located after diligent search, and this fact is verified by affidavit of the sheriff or his deputy, the lien may be preserved by filing the statement together with the affidavit.",
          "citation": "S.C. Code § 29-5-90",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q9",
          "text": "(A) Unless a suit for enforcing the lien is commenced and notice of pendency of the action is filed within six months after the person desiring to avail himself of it ceases to labor on or furnish labor or material for the building or structure, the lien must be dissolved.",
          "citation": "S.C. Code § 29-5-120(A)",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q10",
          "text": "Any person entering into a direct agreement with, or with the consent of, an owner for the improvement of real property may file with the clerk of court or register of deeds in the county or counties where the real property is situate a notice of project commencement.",
          "citation": "S.C. Code § 29-5-23",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "sc-q11",
          "text": "The notice must be filed within fifteen days of the commencement of work and must be accompanied by a filing fee of fifteen dollars to be deposited in that county's general fund.",
          "citation": "S.C. Code § 29-5-23",
          "url": "https://www.scstatehouse.gov/code/t29c005.php",
          "sourceId": "sc-0",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "sc-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "Where a notice of project commencement is filed, for a notice of furnishing labor or materials sent to the contractor",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "Without the notice, the aggregate amount of any liens filed by a sub-subcontractor or supplier may not exceed the amount due by the contractor to the subcontractor to whom it supplied labor, material, or services. After the contractor receives the notice, no payment by the contractor to the subcontractor lessens the amount recoverable by the person giving it.",
          "recipients": [
            "The contractor"
          ],
          "delivery": "Certified or registered mail",
          "quoteIds": [
            "sc-q1",
            "sc-q2",
            "sc-q3"
          ]
        },
        {
          "id": "sc-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a written notice to the owner of the furnishing of labor or material and its amount or value, where the work is done or material furnished upon the employment of a contractor or some other person than the owner",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "On that notice, the lien given by section 29-5-20 attaches upon the real estate improved as against the true owner for the amount of the work done or material furnished, but the aggregate amount of liens may not exceed the amount due by the owner on the contract price of the improvement.",
          "recipients": [
            "The owner"
          ],
          "delivery": "In writing",
          "quoteIds": [
            "sc-q4"
          ]
        },
        {
          "id": "sc-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sc-q5",
            "sc-q6",
            "sc-q7"
          ]
        },
        {
          "id": "sc-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the lien is dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sc-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person ceases to labor on or furnish labor or materials for the building or structure"
            }
          ]
        },
        {
          "id": "sc-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the lien is dissolved.",
          "recipients": [
            "The owner or, if the owner cannot be found, the person in possession"
          ],
          "delivery": "Served upon the owner or the person in possession. If neither can be located after diligent search, and this is verified by affidavit of the sheriff or a deputy, the lien may be preserved by filing the statement together with the affidavit.",
          "quoteIds": [
            "sc-q7",
            "sc-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person ceases to labor on or furnish labor or materials for the building or structure"
            }
          ]
        },
        {
          "id": "sc-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "Otherwise the lien must be dissolved.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sc-q9"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person ceases to labor on or furnish labor or material for the building or structure"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Any person entering into a direct agreement with, or with the consent of, an owner may file a notice of project commencement with the clerk of court or register of deeds, within fifteen days of the commencement of work. If no notice of project commencement is filed, section 29-5-20(B), which limits the liens of a sub-subcontractor or supplier who has not sent a notice of furnishing to the contractor, does not apply.",
          "quoteIds": [
            "sc-q10",
            "sc-q11",
            "sc-q3"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the person ceases to labor on or furnish labor or materials for the building or structure",
          "input": "Ceased to labor on or furnish labor or materials on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "sc-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "SD",
      "name": "South Dakota",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "SDCL ch. 44-9",
      "statuteUrl": "https://sdlegislature.gov/api/Statutes/44-9-15.html",
      "summary": "South Dakota ends the lien at the end of one hundred twenty days after doing the last of such work, or furnishing the last item of such skill, services, material, or machinery, unless a statement of the claim is filed with the register of deeds within that period, and the person claiming the lien mails a copy of the lien statement to the property owner by registered or certified mail before filing it. No lien may be enforced unless its holder asserts it within six years after the date of the last item of the claim as set forth in the filed and entered lien statement, and where a notice of project commencement is filed and posted, a sub-subcontractor or supplier to subcontractors gives a notice of furnishing not later than sixty days after the last work or item.",
      "effectiveOrAmended": "Section 44-9-15 was last amended by SL 1961, ch 200, section 44-9-24 by SL 2014, ch 212, section 44-9-26 by SL 2007, ch 254, and section 44-9-50 by SL 2012, ch 51. Section 44-9-17 was added by SL 1967, ch 153, and sections 44-9-51 and 44-9-53 come from SL 1999, ch 217.",
      "quotes": [
        {
          "id": "sd-q1",
          "text": "If the provisions of §§ 44-9-50 and 44-9-51 are first invoked, no sub-subcontractor or supplier to subcontractors is entitled to extend, pursuant to § 44-9-15, a lien created pursuant to subdivision 44-9-1(1), unless the sub-subcontractor or supplier has first provided notice of furnishing labor or materials by certified or registered mail to the contractor identified in the notice of project commencement and has provided a copy of the notice to the owner of record.",
          "citation": "SDCL 44-9-53",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-53.html",
          "sourceId": "sd-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q2",
          "text": "Notice pursuant to this section shall be made not later than sixty days after doing the last of such work, or furnishing the last item of such skill, services, material, or machinery, and the post office receipt for mailing such notice shall be attached to the lien and filed in the office of register of deeds.",
          "citation": "SDCL 44-9-53",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-53.html",
          "sourceId": "sd-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q3",
          "text": "Any person who gives notice in accordance with this section may extend a lien as provided in § 44-9-15.",
          "citation": "SDCL 44-9-53",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-53.html",
          "sourceId": "sd-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q4",
          "text": "This section does not apply to claims of individual laborers when the amount of their lien is less than two thousand dollars.",
          "citation": "SDCL 44-9-53",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-53.html",
          "sourceId": "sd-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q5",
          "text": "Any person furnishing any of the items for which a lien may be claimed under the provisions of § 44-9-1 under a contract, either express or implied between the owner of the property or his duly authorized agent or representative, and any contractor working upon or about such property may serve upon the owner, or his duly authorized agent or representative at any time, a sworn account and notice of his claim showing the items and amounts and the dates that the same were furnished, and thereupon the owner shall withhold from his contractor so much of the contract price as may be necessary to meet the claims of persons who have served such accounts and notices.",
          "citation": "SDCL 44-9-10",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-10.html",
          "sourceId": "sd-1",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q6",
          "text": "Before filing such lien statement, the person claiming the lien shall mail to the property owner at his last known post office address, by registered or certified mail, a copy of such lien statement and the post office receipt for such mailing shall be attached to the lien statement and filed in the office of register of deeds.",
          "citation": "SDCL 44-9-17",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-17.html",
          "sourceId": "sd-2",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q7",
          "text": "The lien shall cease at the end of one hundred twenty days after doing the last of such work, or furnishing the last item of such skill, services, material, or machinery, unless within such period a statement of the claim therefor be filed with the register of deeds of the county in which the improved premises are situated, or of the county to which such county is attached for judicial purposes, or if the claim be under the provisions of subdivision 44-9-1(2), with the secretary of state.",
          "citation": "SDCL 44-9-15",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-15.html",
          "sourceId": "sd-3",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q8",
          "text": "No lien may be enforced in any case unless the holder of the lien asserts the lien, either by complaint or answer, within six years after the date of the last item of the lien holder's claim as set forth in the filed and entered lien statement.",
          "citation": "SDCL 44-9-24",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-24.html",
          "sourceId": "sd-4",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q9",
          "text": "If no action or suit has been commenced to enforce the lien during the six-year period, the owner of the property, the owner's agent, or contractor may file an affidavit with the register of deeds stating that the lien holder has not commenced suit to enforce the lien within the six-year period and requesting that the lien be cancelled.",
          "citation": "SDCL 44-9-24",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-24.html",
          "sourceId": "sd-4",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q10",
          "text": "The register of deeds shall cancel the lien of record within thirty days of the filing of the affidavit.",
          "citation": "SDCL 44-9-24",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-24.html",
          "sourceId": "sd-4",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q11",
          "text": "Upon written demand by the owner, the owner's agent, or contractor, served on any person holding a lien, requiring the person to commence suit to enforce the lien, the person shall commence suit within thirty days after such service or the lien is forfeited.",
          "citation": "SDCL 44-9-26",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-26.html",
          "sourceId": "sd-5",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q12",
          "text": "Any owner or any person entering into a direct agreement with the owner, or the duly authorized agent or representative of the owner, may file with the register of deeds of the county in which the improved premises are situated a notice of project commencement.",
          "citation": "SDCL 44-9-50",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-50.html",
          "sourceId": "sd-6",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q13",
          "text": "The notice shall be filed within thirty days of the commencement of work and shall be accompanied by a filing fee as provided in subdivision 7-9-15(3).",
          "citation": "SDCL 44-9-50",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-50.html",
          "sourceId": "sd-6",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q14",
          "text": "Any person filing a notice of project commencement shall post the name and address of the contractor and location notice at the job site.",
          "citation": "SDCL 44-9-51",
          "url": "https://sdlegislature.gov/api/Statutes/44-9-51.html",
          "sourceId": "sd-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q15",
          "text": "The time in which any act provided by law is to be done is computed by excluding the first day and including the last, unless the last is a holiday and then it also is excluded.",
          "citation": "SDCL 2-14-14",
          "url": "https://sdlegislature.gov/api/Statutes/2-14-14.html",
          "sourceId": "sd-8",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q16",
          "text": "The first day of every week, known as Sunday; the first day of January, commonly known as New Year's Day; the third Monday in January, commonly known as Martin Luther King, Jr. Day; the third Monday in February, the anniversary of the birthdays of Lincoln and Washington; the last Monday of May, commonly known as Memorial Day; the nineteenth day of June, commonly known as Juneteenth; the fourth day of July, commonly known as Independence Day; the first Monday in September, commonly known as Labor Day; the second Monday in October, commonly known as Native Americans' Day; the eleventh day of November, known as Veterans' Day; the fourth Thursday in November, commonly known as Thanksgiving Day; and the twenty-fifth day of December, commonly known as Christmas Day; and every day appointed by the President of the United States, or by the Governor of this state for a public fast, thanksgiving, or holiday shall be observed in this state as a legal holiday.",
          "citation": "SDCL 1-5-1",
          "url": "https://sdlegislature.gov/api/Statutes/1-5-1.html",
          "sourceId": "sd-9",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "sd-q17",
          "text": "If the first day of January, the nineteenth day of June, the fourth day of July, the eleventh day of November, or the twenty-fifth day of December falls upon a Sunday, the Monday following is a legal holiday and shall be so observed; and if any such day falls upon a Saturday, the preceding Friday is a legal holiday and shall be so observed.",
          "citation": "SDCL 1-5-1",
          "url": "https://sdlegislature.gov/api/Statutes/1-5-1.html",
          "sourceId": "sd-9",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "sd-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-commencement",
          "branchNote": "If a notice of project commencement is filed and posted under §§ 44-9-50 and 44-9-51, for a sub-subcontractor or a supplier to subcontractors, other than an individual laborer whose lien is less than two thousand dollars",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "Without this notice, a sub-subcontractor or supplier to subcontractors may not extend the lien pursuant to § 44-9-15. The section does not apply to claims of individual laborers when the amount of their lien is less than two thousand dollars.",
          "recipients": [
            "The contractor identified in the notice of project commencement",
            "The owner of record (a copy of the notice)"
          ],
          "delivery": "Certified or registered mail. The post office receipt for mailing the notice is attached to the lien and filed in the office of register of deeds.",
          "quoteIds": [
            "sd-q1",
            "sd-q2",
            "sd-q3",
            "sd-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "doing the last of such work, or furnishing the last item of such skill, services, material, or machinery"
            }
          ]
        },
        {
          "id": "sd-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "A person furnishing items under a contract between the owner and a contractor may serve on the owner, at any time, a sworn account and notice of claim, and the owner then withholds from the contractor so much of the contract price as may be necessary to meet the claims of persons who have served such accounts and notices.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sd-q5"
          ]
        },
        {
          "id": "sd-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before filing such lien statement"
          },
          "consequence": null,
          "recipients": [
            "The property owner, at the owner's last known post office address"
          ],
          "delivery": "A copy of the lien statement, by registered or certified mail. The post office receipt for the mailing is attached to the lien statement and filed in the office of register of deeds.",
          "quoteIds": [
            "sd-q6"
          ]
        },
        {
          "id": "sd-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": "The lien ceases at the end of that period unless a statement of the claim is filed within it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sd-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "doing the last of such work, or furnishing the last item of such skill, services, material, or machinery"
            }
          ]
        },
        {
          "id": "sd-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within six years after the date of the last item of the lien holder's claim as set forth in the filed and entered lien statement"
          },
          "consequence": "No lien may be enforced unless its holder asserts it, by complaint or answer, within that time. If no action or suit is commenced within the six-year period, the owner, the owner's agent, or contractor may file an affidavit asking the register of deeds to cancel the lien, and the register of deeds cancels it of record within thirty days of the filing of the affidavit.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sd-q8",
            "sd-q9",
            "sd-q10"
          ]
        },
        {
          "id": "sd-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Upon written demand by the owner, the owner's agent, or contractor, served on the person holding the lien, requiring the person to commence suit to enforce it",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within thirty days after such service"
          },
          "consequence": "If suit is not commenced within that time, the lien is forfeited.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "sd-q11"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "Any owner, any person entering into a direct agreement with the owner, or the owner's duly authorized agent or representative may file a notice of project commencement with the register of deeds of the county in which the improved premises are situated, within thirty days of the commencement of work, and the person filing it posts the name and address of the contractor and a location notice at the job site. Once a notice of project commencement is filed and posted, § 44-9-53 requires a notice of furnishing from sub-subcontractors and suppliers to subcontractors.",
          "quoteIds": [
            "sd-q12",
            "sd-q13",
            "sd-q14",
            "sd-q1"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "sd-q15"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "sd-q15",
            "sd-q16"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "sd-q16",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr. Day",
            "quoteId": "sd-q16",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "The third Monday in February",
            "quoteId": "sd-q16",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "sd-q16",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "sd-q16",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "sd-q16",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "sd-q16",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Native Americans' Day",
            "quoteId": "sd-q16",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "sd-q16",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "sd-q16",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "sd-q16",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "sd-q16",
          "sd-q17"
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "doing the last of such work, or furnishing the last item of such skill, services, material, or machinery",
          "input": "Last of such work done, or last item furnished, on",
          "hint": null
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "sd-0",
        "sd-1",
        "sd-2",
        "sd-3",
        "sd-4",
        "sd-5",
        "sd-6",
        "sd-7",
        "sd-8",
        "sd-9"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "TN",
      "name": "Tennessee",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "Tenn. Code Ann. title 66, ch. 11",
      "statuteUrl": "https://www.lexisnexis.com/hottopics/tncode/",
      "summary": "In Tennessee a prime contractor's lien continues for one year after the date the improvement is complete or is abandoned, and until the final decision of any suit properly brought within that time, while a remote contractor serves a notice of lien on the owner within ninety days after the improvement is complete or is abandoned, and its lien then continues for ninety days from service and until the final termination of any suit properly brought within that period. Recording a sworn statement within those ninety days preserves the lien's priority as concerns subsequent purchasers or encumbrancers, a remote contractor on an improvement other than one-family to four-family residential units serves a notice of nonpayment within ninety days of the last day of each month of work, and after a notice of completion is recorded, a claimant that has not recorded its contract or a sworn statement and served a copy of the registration on the owner serves written notice of its claim within ten or thirty days.",
      "effectiveOrAmended": "Sections 66-11-106, 66-11-112, 66-11-115 and 66-11-145 were last amended by Acts 2007, ch. 189, sections 66-11-143 and 66-11-146 by Acts 2008, ch. 811, and sections 66-11-126 and 66-11-203 by Acts 2020, ch. 749. Section 15-1-101, which lists the legal holidays, was last amended by Acts 2023, ch. 337. The code text is current through the 2026 Regular Session and the 2026 2nd Extraordinary Session.",
      "quotes": [
        {
          "id": "tn-q1",
          "text": "(a) Every remote contractor with respect to an improvement, except one-family, two-family, three-family and four-family residential units, shall serve, within ninety (90) days of the last day of each month within which work or labor was provided or materials, services, equipment, or machinery furnished and for which the remote contractor intends to claim a lien under this chapter, a notice of nonpayment for the work, labor, materials, services, machinery, or equipment to the owner and prime contractor in contractual privity with the remote contractor if its account is, in fact, unpaid.",
          "citation": "Tenn. Code Ann. § 66-11-145(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q2",
          "text": "(b) A remote contractor who fails to provide the notice of nonpayment in compliance with this section shall have no right to claim a lien under this chapter, except this section shall not apply to a certain amount or percentage of the contract amount retained to guarantee performance of the remote contractor.",
          "citation": "Tenn. Code Ann. § 66-11-145(b)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q3",
          "text": "Any contractor who is about to enter into a contract, either written or oral, for improving residential real property, as that term is defined by § 66-11-146, with the owner or owners thereof shall, prior to commencing the improvement of the residential real property or making of the contract, deliver, by registered mail or otherwise, to the owner or owners of the residential real property to be improved written notice in substantially the following form:",
          "citation": "Tenn. Code Ann. § 66-11-203",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q4",
          "text": "The above-captioned contractor hereby gives notice to the owner of the property to be improved, that the contractor is about to begin improving the property according to the terms and conditions of the contract and that under the provisions of the state law (§§ 66-11-101 — 66-11-141) there shall be a lien upon the real property and building for the improvements made in favor of the above-mentioned contractor who does the work or furnishes the materials for such improvements for a duration of one (1) year after the work is finished or materials furnished.",
          "citation": "Tenn. Code Ann. § 66-11-203",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q5",
          "text": "(a) In order to preserve the priority of the lien provided by this chapter as of the date of its attachment, as concerns subsequent purchasers or encumbrancers for a valuable consideration without notice of the lien, though not as concerns the owner, the lienor, who has not recorded the lienor's contract pursuant to § 66-11-111, is required to record in the office of the register of deeds of the county where the real property, or any part affected, lies, a sworn statement of the amount for, and a reasonably certain description of the real property on, which the lien is claimed.",
          "citation": "Tenn. Code Ann. § 66-11-112(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q6",
          "text": "Recordation is required to be done no later than ninety (90) days after the date the improvement is complete or is abandoned, prior to which time the lien shall be effective as against the purchasers or encumbrancers without the recordation.",
          "citation": "Tenn. Code Ann. § 66-11-112(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q7",
          "text": "If the sworn statement is not recorded within that time, the lien's priority as to subsequent purchasers or encumbrancers shall be determined as if it attached as of the time the sworn statement is recorded.",
          "citation": "Tenn. Code Ann. § 66-11-112(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q8",
          "text": "(b) A building, structure or improvement shall be deemed to have been abandoned for purposes of this chapter when there is a cessation of operation for a period of ninety (90) days and an intent on the part of the owner or prime contractor to cease operations permanently, or at least for an indefinite period.",
          "citation": "Tenn. Code Ann. § 66-11-112(b)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q9",
          "text": "(a) Every remote contractor shall have the lien provided by this part for work or labor performed or materials, services, equipment, or machinery furnished by the remote contractor in furtherance of the improvement; provided, that the remote contractor:",
          "citation": "Tenn. Code Ann. § 66-11-115(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q10",
          "text": "(1) Satisfies all of the requirements set forth in § 66-11-145, if applicable; and",
          "citation": "Tenn. Code Ann. § 66-11-115(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q11",
          "text": "(2) Within the time provided for recording sworn statements set out in § 66-11-112(a), serves a notice of lien, in writing, on the owner of the property on which the improvement is being made.",
          "citation": "Tenn. Code Ann. § 66-11-115(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q12",
          "text": "A prime contractor's lien shall continue for one (1) year after the date the improvement is complete or is abandoned, and until the final decision of any suit properly brought within that time for its enforcement.",
          "citation": "Tenn. Code Ann. § 66-11-106",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q13",
          "text": "(1) Any prime contractor or remote contractor claiming a lien under this chapter on the property described in the notice of completion, who has not previously registered the person's contract as provided in § 66-11-111 or registered a sworn statement as provided in § 66-11-112 and served a copy of the registration to the owner, shall serve written notice, addressed to the person, firm or organization and at the address designated in the notice of completion for receiving notice of claim, stating the amount of the claim and certifying that the claim does not include any amount owed to the claimant on any other job or under any other contract.",
          "citation": "Tenn. Code Ann. § 66-11-143(e)(1)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q14",
          "text": "(A) For improvements to or on real property for one-family, two-family, three-family and four-family residential units, the written notice shall be served not more than ten (10) days from the date of the recording of the notice of completion in the register's office, and if notice is not served within that time, the lien rights of the claimant shall expire.",
          "citation": "Tenn. Code Ann. § 66-11-143(e)(2)(A)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q15",
          "text": "If a prime contractor is entitled to be served with a copy of any notice of completion recorded with the register of deeds, then the lien rights of the prime contractor not so served a copy shall not be affected by the notice of completion.",
          "citation": "Tenn. Code Ann. § 66-11-143(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q16",
          "text": "(d) If a remote contractor has served a required notice of nonpayment pursuant to § 66-11-145, then any party recording a notice of completion shall simultaneously serve a copy of the notice of completion on the remote contractor.",
          "citation": "Tenn. Code Ann. § 66-11-143(d)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q17",
          "text": "The lien rights of a remote contractor that has not been served a copy, shall not be affected by the notice of completion.",
          "citation": "Tenn. Code Ann. § 66-11-143(d)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q18",
          "text": "(B) For all other contracts for improvements to or on real property, the written notice shall be served not more than thirty (30) days from the date of the recording of the notice of completion in the register's office, and if notice is not served within that time, the lien rights of the claimant shall expire.",
          "citation": "Tenn. Code Ann. § 66-11-143(e)(2)(B)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q19",
          "text": "The remote contractor shall have thirty (30) days from the date of the recording of the notice of completion to serve a written notice in response to the notice of completion in accordance with subsection (e).",
          "citation": "Tenn. Code Ann. § 66-11-143(d)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q20",
          "text": "(3) A complaint, petition, or civil warrant under this chapter is timely filed if a suit seeking the issuance of an attachment is filed within the applicable period of time, even if the attachment is not issued or served within the applicable period.",
          "citation": "Tenn. Code Ann. § 66-11-126(3)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q21",
          "text": "(b) The lien shall continue for the period of ninety (90) days from the date of service of notice in favor of the remote contractor, and until the final termination of any suit for its enforcement properly brought pursuant to § 66-11-126 within that period.",
          "citation": "Tenn. Code Ann. § 66-11-115(b)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q22",
          "text": "(1) As used in this subsection (a), “residential real property” means a building consisting of one (1) dwelling unit in which the owner of the real property intends to reside or resides as the owner's principal place of residence, including improvements to or on the parcel of property where the residential building is located, and also means a building consisting of two (2), three (3) or four (4) dwelling units where the owner of the real property intends to reside or resides in one (1) of the units as the owner's principal place of residence, including improvements to or on the parcel of property where the residential building is located.",
          "citation": "Tenn. Code Ann. § 66-11-146(a)(1)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q23",
          "text": "(2) Notwithstanding any other law to the contrary, except as provided in subsection (b), on contracts to improve residential real property, a lien or right of lien on the property shall exist only in favor of a prime contractor.",
          "citation": "Tenn. Code Ann. § 66-11-146(a)(2)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q24",
          "text": "(A) “General contractor” means the person responsible for the supervision or performance of substantially all of the work, labor, and the furnishing of materials in furtherance of the improvement to the property; and",
          "citation": "Tenn. Code Ann. § 66-11-146(b)(1)(A)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q25",
          "text": "(B) “Residential real property” means improvements to or on a parcel of property upon which a building is constructed or is to be constructed consisting of one (1) dwelling unit intended as the principal place of residence of a person or family.",
          "citation": "Tenn. Code Ann. § 66-11-146(b)(1)(B)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q26",
          "text": "(2) When the owner of residential real property and the general contractor are one and the same person, or a person controls entities owning the property and a general contracting business, a lien or right of lien upon the property shall exist only in favor of the lienors in contractual privity with the owner or general contractor.",
          "citation": "Tenn. Code Ann. § 66-11-146(b)(2)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q27",
          "text": "(a) In order to be protected from lien claims that have not previously been recorded, as provided in § 66-11-111 or § 66-11-112, the owner or purchaser of improved real property or their agent or attorney may, upon the completion of the improvement, record in the office of the register of deeds in the county where the real property or any affected part of the real property is located a notice of completion, or the owner or purchaser may require a person or organization with whom the owner or purchaser has contracted for the improvement to do so upon the completion of the improvement, and the owner or purchaser of improved real property or any other authorized party shall simultaneously serve a copy of any notice of completion recorded with the register of deeds on the prime contractor; provided, however, that no copy of the notice of completion is required to be served on any prime contractor when the owner, or an entity controlled by the owner, also acts as the general contractor, as defined in § 66-11-146(b)(1), in furtherance of the improvement to the property.",
          "citation": "Tenn. Code Ann. § 66-11-143(a)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q28",
          "text": "(f) Any notice of completion recorded as provided in this section before the completion of the improvement or the demolition is void and of no effect whatsoever.",
          "citation": "Tenn. Code Ann. § 66-11-143(f)",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q29",
          "text": "The time within which any act provided by law is to be done shall be computed by excluding the first day and including the last, unless the last day is a Saturday, a Sunday, or a legal holiday, and then it shall also be excluded.",
          "citation": "Tenn. Code Ann. § 1-3-102",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q30",
          "text": "January 1; the third Monday in January, “Martin Luther King, Jr. Day”; the third Monday in February, known as “Washington Day”; the last Monday in May, known as “Memorial” or “Decoration Day”; June 19, known as “Juneteenth”; July 4; the first Monday in September, known as “Labor Day”; the second Monday in October, known as “Columbus Day”; November 11, known as “Veterans' Day”; the fourth Thursday in November, known as “Thanksgiving Day”; December 25; and Good Friday;",
          "citation": "Tenn. Code Ann. § 15-1-101",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tn-q31",
          "text": "and when any one (1) of these days falls on Sunday, then the following Monday shall be substituted; and when any of these days falls on Saturday, then the preceding Friday shall be substituted; also, all days appointed by the governor or by the president of the United States as days of fasting or thanksgiving, and all days set apart by law for holding county, state, or national elections, throughout this state, are made legal holidays, and the period from twelve o'clock (12:00) noon to twelve o'clock (12:00) midnight of each Saturday which is not a holiday is made a half-holiday, on which holidays and half-holidays all public offices of this state may be closed and business of every character, at the option of the parties in interest of the same, may be suspended.",
          "citation": "Tenn. Code Ann. § 15-1-101",
          "url": "https://www.lexisnexis.com/hottopics/tncode/",
          "sourceId": "tn-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "tn-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a remote contractor on an improvement other than one-family, two-family, three-family and four-family residential units, if its account is, in fact, unpaid",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Within ninety (90) days of the last day of each month within which work or labor was provided or materials, services, equipment, or machinery furnished"
          },
          "consequence": "A remote contractor who fails to provide the notice of nonpayment has no right to claim a lien under the chapter, except as to a certain amount or percentage of the contract amount retained to secure the remote contractor's performance.",
          "recipients": [
            "The owner",
            "The prime contractor in contractual privity with the remote contractor"
          ],
          "delivery": null,
          "quoteIds": [
            "tn-q1",
            "tn-q2"
          ]
        },
        {
          "id": "tn-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a contractor about to enter into a contract with the owner for improving residential real property, as § 66-11-146 defines that term",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Prior to commencing the improvement of the residential real property or making of the contract"
          },
          "consequence": null,
          "recipients": [
            "The owner or owners of the residential real property to be improved"
          ],
          "delivery": "Written notice, by registered mail or otherwise, in substantially the form the section sets out.",
          "quoteIds": [
            "tn-q3",
            "tn-q4"
          ]
        },
        {
          "id": "tn-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "To preserve the lien's priority as of its attachment as concerns subsequent purchasers or encumbrancers for a valuable consideration without notice of the lien, though not as concerns the owner, for a lienor who has not recorded its contract under § 66-11-111",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "If the sworn statement is not recorded within that time, the lien's priority as to subsequent purchasers or encumbrancers is determined as if it attached as of the time the sworn statement is recorded.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tn-q5",
            "tn-q6",
            "tn-q7",
            "tn-q8"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the improvement is complete or is abandoned"
            }
          ]
        },
        {
          "id": "tn-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "A remote contractor has the lien provided by the part only if it serves this notice within that time and satisfies the requirements of § 66-11-145, if applicable.",
          "recipients": [
            "The owner of the property on which the improvement is being made"
          ],
          "delivery": "A notice of lien, in writing.",
          "quoteIds": [
            "tn-q9",
            "tn-q10",
            "tn-q11",
            "tn-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the improvement is complete or is abandoned"
            }
          ]
        },
        {
          "id": "tn-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": "A prime contractor's lien continues for one year after the date the improvement is complete or is abandoned, and until the final decision of any suit properly brought within that time for its enforcement. Recording a sworn statement concerns the lien's priority as to subsequent purchasers or encumbrancers, though not as concerns the owner.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tn-q12",
            "tn-q5"
          ]
        },
        {
          "id": "tn-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "After a notice of completion is recorded, for improvements to or on real property for one-family, two-family, three-family and four-family residential units, for a prime contractor or remote contractor that has not previously recorded its contract or a sworn statement and served a copy of the registration on the owner",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 10
            }
          },
          "notComputed": null,
          "consequence": "If the notice is not served within that time, the claimant can no longer claim the lien. A prime contractor due a copy of the notice of completion that was not served one, and a remote contractor that served a notice of nonpayment and was not served a copy, are not affected by the notice of completion.",
          "recipients": [
            "The person, firm or organization designated in the notice of completion for receiving notice of claim, at the address designated there"
          ],
          "delivery": "Written notice stating the amount of the claim and certifying that the claim does not include any amount owed to the claimant on any other job or under any other contract.",
          "quoteIds": [
            "tn-q13",
            "tn-q14",
            "tn-q15",
            "tn-q16",
            "tn-q17"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "the notice of completion is recorded"
            }
          ]
        },
        {
          "id": "tn-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "notice-of-completion",
          "branchNote": "After a notice of completion is recorded, for all other contracts for improvements to or on real property, for a prime contractor or remote contractor that has not previously recorded its contract or a sworn statement and served a copy of the registration on the owner",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "notice-of-completion"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "If the notice is not served within that time, the claimant can no longer claim the lien. A prime contractor due a copy of the notice of completion that was not served one, and a remote contractor that served a notice of nonpayment and was not served a copy, are not affected by the notice of completion.",
          "recipients": [
            "The person, firm or organization designated in the notice of completion for receiving notice of claim, at the address designated there"
          ],
          "delivery": "Written notice stating the amount of the claim and certifying that the claim does not include any amount owed to the claimant on any other job or under any other contract.",
          "quoteIds": [
            "tn-q13",
            "tn-q18",
            "tn-q15",
            "tn-q16",
            "tn-q19",
            "tn-q17"
          ],
          "eventWording": [
            {
              "event": "notice-of-completion",
              "clause": "the notice of completion is recorded"
            }
          ]
        },
        {
          "id": "tn-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "years",
              "n": 1
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tn-q12",
            "tn-q20"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the improvement is complete or is abandoned"
            }
          ]
        },
        {
          "id": "tn-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tn-q21",
            "tn-q20"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of lien is served"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "On contracts to improve residential real property, meaning a building of one dwelling unit in which the owner intends to reside or resides as the owner's principal place of residence, or a building of two, three or four dwelling units where the owner intends to reside or resides in one of the units as the owner's principal place of residence, with the improvements on its parcel, a lien exists only in favor of a prime contractor, except as § 66-11-146(b) provides. Under § 66-11-146(b), when the owner of residential real property (a building of one dwelling unit intended as the principal place of residence of a person or family) and the general contractor are one and the same person, or a person controls entities owning the property and a general contracting business, a lien exists only in favor of the lienors in contractual privity with the owner or general contractor.",
          "quoteIds": [
            "tn-q22",
            "tn-q23",
            "tn-q24",
            "tn-q25",
            "tn-q26"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "Upon the completion of the improvement, the owner or purchaser of improved real property, or their agent or attorney, may record a notice of completion with the register of deeds, or require a person or organization with whom the owner or purchaser has contracted for the improvement to do so, and a copy is served on the prime contractor at the same time, unless the owner, or an entity controlled by the owner, also acts as the general contractor. A notice of completion recorded before the completion of the improvement is void and of no effect.",
          "quoteIds": [
            "tn-q27",
            "tn-q28"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "tn-q29"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "tn-q29",
            "tn-q30"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "January 1",
            "quoteId": "tn-q30",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr. Day",
            "quoteId": "tn-q30",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Washington Day",
            "quoteId": "tn-q30",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial or Decoration Day",
            "quoteId": "tn-q30",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "tn-q30",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "July 4",
            "quoteId": "tn-q30",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "tn-q30",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "tn-q30",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "tn-q30",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "tn-q30",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "December 25",
            "quoteId": "tn-q30",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "tn-q30",
          "tn-q31"
        ],
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "Tenn. Code Ann. § 15-1-101 lists it by name, and its date changes each year with Easter Sunday"
          },
          {
            "name": "the days set apart by law for holding county, state, or national elections",
            "reason": "Tenn. Code Ann. § 15-1-101 names them without stating their dates"
          }
        ]
      },
      "eventWording": [
        {
          "event": "completion",
          "clause": "the improvement is complete or is abandoned",
          "input": "Improvement complete or abandoned on",
          "hint": "Under § 66-11-112(b), an improvement is deemed abandoned when there is a cessation of operation for a period of ninety days and an intent on the part of the owner or prime contractor to cease operations permanently, or at least for an indefinite period."
        },
        {
          "event": "notice-of-completion",
          "clause": "the notice of completion is recorded",
          "input": "Notice of completion recorded with the register of deeds on",
          "hint": "Leave empty if no notice of completion has been recorded."
        },
        {
          "event": "lien-recorded",
          "clause": "the notice of lien is served",
          "input": "Notice of lien served on the owner on",
          "hint": "Leave empty if no notice of lien has been served."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "tn-0"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "TX",
      "name": "Texas",
      "status": "verified",
      "releaseBatch": 1,
      "statute": "Tex. Prop. Code ch. 53",
      "statuteUrl": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
      "summary": "Texas sets the lien affidavit deadline, and the deadline for each monthly notice of claim, on the 15th day of a later month after the month of the work, with shorter periods for residential construction projects. A claimant other than an original contractor must give monthly notices of claim for the lien to be valid.",
      "effectiveOrAmended": "The deadlines in Chapter 53 were rewritten by Acts 2021, 87th Legislature, Chapter 690 (H.B. 2237), effective January 1, 2022. Section 53.003 was amended by Acts 2025, 89th Legislature, Chapter 98 (S.B. 929), effective May 21, 2025.",
      "quotes": [
        {
          "id": "tx-q1",
          "text": "a claimant other than an original contractor must give the notice prescribed by Subsections (a-1) and (a-2) for the lien to be valid",
          "citation": "Tex. Prop. Code § 53.056(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q2",
          "text": "for projects other than residential construction projects, not later than the 15th day of the third month after the month during which: (A) the labor or materials were provided; or (B) the undelivered specially fabricated materials would normally have been delivered",
          "citation": "Tex. Prop. Code § 53.056(a-1)(1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q3",
          "text": "for residential construction projects, not later than the 15th day of the second month after the month during which: (A) the labor or materials were provided; or (B) the undelivered specially fabricated materials would normally have been delivered.",
          "citation": "Tex. Prop. Code § 53.056(a-1)(2)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q4",
          "text": "The claimant must send the notice of claim for unpaid retainage to the owner or reputed owner and the original contractor not later than the earlier of: (1) the 30th day after the date the claimant's contract is completed, terminated, or abandoned; or (2) the 30th day after the date the original contract is terminated or abandoned.",
          "citation": "Tex. Prop. Code § 53.057(a-1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q5",
          "text": "not later than the 15th day of the fourth month after the month in which the original contractor's work was completed, terminated, or abandoned",
          "citation": "Tex. Prop. Code § 53.052(a)(1)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q6",
          "text": "for residential construction projects, not later than the 15th day of the third month after the month in which the original contractor's work was completed, terminated, or abandoned",
          "citation": "Tex. Prop. Code § 53.052(a)(2)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q7",
          "text": "(b) Except as provided by Subsection (c) or (d), a claimant other than an original contractor claiming the lien must file an affidavit with the county clerk not later than the 15th day of the fourth month after the later of: (1) the month the claimant last provided labor or materials; or (2) the month the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered.",
          "citation": "Tex. Prop. Code § 53.052(b)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q8",
          "text": "(c) A claimant other than an original contractor claiming a lien arising from a residential construction project must file an affidavit with the county clerk not later than the 15th day of the third month after the later of: (1) the month the claimant last provided labor or materials; or (2) the month the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered.",
          "citation": "Tex. Prop. Code § 53.052(c)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q9",
          "text": "A claimant other than an original contractor claiming a lien for retainage must file an affidavit with the county clerk not later than the 15th day of the third month after the month in which the original contract under which the claimant performed was completed, terminated, or abandoned.",
          "citation": "Tex. Prop. Code § 53.052(d)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q10",
          "text": "A person who files an affidavit must send a copy of the affidavit to the owner or reputed owner at the owner's last known business or residence address not later than the fifth day after the date the affidavit is filed with the county clerk.",
          "citation": "Tex. Prop. Code § 53.055(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q11",
          "text": "If the person is not an original contractor, the person must also send a copy of the affidavit to the original contractor at the original contractor's last known business or residence address within the same period.",
          "citation": "Tex. Prop. Code § 53.055(b)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q12",
          "text": "suit must be brought to foreclose the lien not later than the first anniversary of the last day a claimant may file the lien affidavit under Section 53.052",
          "citation": "Tex. Prop. Code § 53.158(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q13",
          "text": "\"Residential construction project\" means a project for the construction or repair of a new or existing residence, including improvements appurtenant to the residence, as provided by a residential construction contract.",
          "citation": "Tex. Prop. Code § 53.001(10)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q14",
          "text": "\"Residential construction contract\" means a contract between an owner and a contractor in which the contractor agrees to construct or repair the owner's residence, including improvements appurtenant to the residence.",
          "citation": "Tex. Prop. Code § 53.001(9)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q15",
          "text": "\"Residence\" means the real property and improvements for a single-family house, duplex, triplex, or quadruplex or a unit in a multiunit structure used for residential purposes in which title to the individual units is transferred to the owners under a condominium or cooperative system that is: (A) owned by one or more adult persons; and (B) used or intended to be used as a dwelling by one of the owners.",
          "citation": "Tex. Prop. Code § 53.001(8)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q16",
          "text": "To fix a lien on a homestead, the person who is to furnish material or perform labor and the owner must execute a written contract",
          "citation": "Tex. Prop. Code § 53.254(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q17",
          "text": "Before a residential construction contract is executed by the owner, the original contractor shall deliver to the owner a disclosure statement",
          "citation": "Tex. Prop. Code § 53.255(a)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q18",
          "text": "If the affidavit is filed after the 10th day after the date of completion, the date of completion for purposes of this subchapter is the date the affidavit is filed.",
          "citation": "Tex. Prop. Code § 53.106(d)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q19",
          "text": "In computing a period of days, the first day is excluded and the last day is included.",
          "citation": "Tex. Gov't Code § 311.014(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.311.htm",
          "sourceId": "tx-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q20",
          "text": "The Code Construction Act (Chapter 311, Government Code) applies to the construction of each provision in this code, except as otherwise expressly provided by this code.",
          "citation": "Tex. Prop. Code § 1.002",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.1.htm",
          "sourceId": "tx-2",
          "retrievedAt": "2026-10-01",
          "capturedAt": null
        },
        {
          "id": "tx-q21",
          "text": "In determining the deadline or computing the period of days in which to provide a notice or to take any action required under this chapter, if the deadline or the last day of the period is a Saturday, Sunday, or legal holiday, the period is extended to include the next day that is not a Saturday, Sunday, or legal holiday.",
          "citation": "Tex. Prop. Code § 53.003(e)",
          "url": "https://tcss.legis.texas.gov/resources/PR/htm/PR.53.htm",
          "sourceId": "tx-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q22",
          "text": "A national holiday includes only the following days:",
          "citation": "Tex. Gov't Code § 662.003(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q23",
          "text": "A state holiday includes only the following days:",
          "citation": "Tex. Gov't Code § 662.003(b)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "tx-q24",
          "text": "(1) the first day of January, \"New Year's Day\"; (2) the third Monday in January, \"Martin Luther King, Jr., Day\" in observance of the birthday of Dr. Martin Luther King, Jr.; (3) the third Monday in February, \"Presidents' Day\"; (4) the last Monday in May, \"Memorial Day\"; (5) the fourth day of July, \"Independence Day\"; (6) the first Monday in September, \"Labor Day\"; (7) the 11th day of November, \"Veterans Day,\" dedicated to the cause of world peace and to honoring the veterans of all wars in which Texans and other Americans have fought; (8) the fourth Thursday in November, \"Thanksgiving Day\"; and (9) the 25th day of December, \"Christmas Day.\"",
          "citation": "Tex. Gov't Code § 662.003(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "tx-q25",
          "text": "(1) the 19th day of January, \"Confederate Heroes Day,\" in honor of Jefferson Davis, Robert E. Lee, and other Confederate heroes; (2) the second day of March, \"Texas Independence Day\"; (3) the 21st day of April, \"San Jacinto Day\"; (4) the 19th day of June, \"Emancipation Day in Texas,\" in honor of the emancipation of the slaves in Texas in 1865; (5) the 27th day of August, \"Lyndon Baines Johnson Day,\" in observance of the birthday of Lyndon Baines Johnson; (6) the Friday after Thanksgiving Day; (7) the 24th day of December; and (8) the 26th day of December.",
          "citation": "Tex. Gov't Code § 662.003(b)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "tx-q26",
          "text": "(a) A state agency and an institution of higher education as defined by Section 61.003, Education Code, shall have enough employees on duty during a state holiday to conduct the public business of the agency or institution.",
          "citation": "Tex. Gov't Code § 662.004(a)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        },
        {
          "id": "tx-q27",
          "text": "(b) This section does not apply to a state holiday that falls on a Saturday or Sunday, the Friday after Thanksgiving Day, or the 24th or 26th day of December.",
          "citation": "Tex. Gov't Code § 662.004(b)",
          "url": "https://tcss.legis.texas.gov/resources/GV/htm/GV.662.htm",
          "sourceId": "tx-3",
          "retrievedAt": "2026-10-02",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "tx-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the third month after that month."
          },
          "consequence": "A claimant other than an original contractor must give the notice for the lien to be valid.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q1",
            "tx-q2"
          ]
        },
        {
          "id": "tx-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the second month after that month."
          },
          "consequence": "A claimant other than an original contractor must give the notice for the lien to be valid.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q3",
            "tx-q1"
          ]
        },
        {
          "id": "tx-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a claim for unpaid retainage",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The earlier of the 30th day after the claimant's contract is completed, terminated or abandoned and the 30th day after the original contract is terminated or abandoned."
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q4"
          ]
        },
        {
          "id": "tx-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q5"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contractor's work was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q6"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contractor's work was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "commercial",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 4
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later"
            }
          ]
        },
        {
          "id": "tx-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later"
            }
          ]
        },
        {
          "id": "tx-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a lien claim for retainage",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "completion"
            },
            "period": {
              "unit": "day-of-month",
              "day": 15,
              "monthsAfter": 3
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q9"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the original contract under which the claimant performed was completed, terminated, or abandoned"
            }
          ]
        },
        {
          "id": "tx-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 5
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner or reputed owner",
            "The original contractor as well, when the claimant is not an original contractor"
          ],
          "delivery": null,
          "quoteIds": [
            "tx-q10",
            "tx-q11"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien affidavit is filed"
            }
          ]
        },
        {
          "id": "tx-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "The first anniversary of the last day a claimant may file the lien affidavit under Section 53.052"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "tx-q12"
          ]
        }
      ],
      "residential": [
        {
          "text": "To fix a lien on a homestead, the person who is to furnish material or perform labor and the owner must execute a written contract.",
          "quoteIds": [
            "tx-q16"
          ]
        },
        {
          "text": "Before the owner executes a residential construction contract, the original contractor must deliver a disclosure statement to the owner.",
          "quoteIds": [
            "tx-q17"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "If an owner's affidavit of completion is filed after the 10th day after completion, the date it is filed is the date of completion for the purposes of Subchapter E, on funds the owner must reserve, except as to a person to whom the owner did not send a copy as the section requires.",
          "quoteIds": [
            "tx-q18"
          ]
        }
      ],
      "residentialDefinition": {
        "text": "A residential construction project is a project for the construction or repair of a new or existing residence, including improvements appurtenant to it, under a contract between the owner and a contractor to construct or repair the owner's residence. A residence is the real property and improvements for a single-family house, duplex, triplex or quadruplex, or a condominium or cooperative unit, owned by one or more adults and used or intended to be used as a dwelling by one of the owners.",
        "quoteIds": [
          "tx-q13",
          "tx-q14",
          "tx-q15"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "tx-q19",
            "tx-q20"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "tx-q21"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr., Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "tx-q22",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "tx-q22",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "tx-q22",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Friday after Thanksgiving Day",
            "quoteId": "tx-q23",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": "The day after Thanksgiving Day, the fourth Thursday of November. It is the fifth Friday of November in a year whose November 1 is a Friday, such as 2030."
          },
          {
            "name": "December 24",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 12,
            "day": 24,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "December 26",
            "quoteId": "tx-q23",
            "kind": "fixed",
            "month": 12,
            "day": 26,
            "observed": "none",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "tx-q22",
          "tx-q24",
          "tx-q23",
          "tx-q25",
          "tx-q26",
          "tx-q27"
        ],
        "holidaysNotModeled": [
          {
            "name": "Confederate Heroes Day",
            "reason": "state holidays on which Tex. Gov't Code § 662.004 requires state agencies to have enough employees on duty to conduct the public business"
          },
          {
            "name": "Texas Independence Day",
            "reason": "state holidays on which Tex. Gov't Code § 662.004 requires state agencies to have enough employees on duty to conduct the public business"
          },
          {
            "name": "San Jacinto Day",
            "reason": "state holidays on which Tex. Gov't Code § 662.004 requires state agencies to have enough employees on duty to conduct the public business"
          },
          {
            "name": "Emancipation Day in Texas",
            "reason": "state holidays on which Tex. Gov't Code § 662.004 requires state agencies to have enough employees on duty to conduct the public business"
          },
          {
            "name": "Lyndon Baines Johnson Day",
            "reason": "state holidays on which Tex. Gov't Code § 662.004 requires state agencies to have enough employees on duty to conduct the public business"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered",
          "input": "Last labor or materials provided, or specially fabricated materials due, on",
          "hint": "The later of the day the claimant last provided labor or materials and the day the claimant would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered."
        },
        {
          "event": "completion",
          "clause": "the original contractor's work was completed, terminated, or abandoned",
          "input": "Original contractor's work completed, terminated, or abandoned on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the lien affidavit is filed",
          "input": "Lien affidavit filed on",
          "hint": "Leave empty if no lien affidavit has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-02",
      "publishable": true,
      "sourceIds": [
        "tx-0",
        "tx-1",
        "tx-2",
        "tx-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "UT",
      "name": "Utah",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "Utah Code Title 38, Chapter 1a",
      "statuteUrl": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
      "summary": "Utah requires a person who desires to claim a construction lien to file a preliminary notice with the registry no later than 20 days after the day on which the person commences providing construction work on the real property, and, except as § 38-1a-502(1)(b) provides for a subcontractor who provides substantial work after a certificate of occupancy is issued or a required final inspection is completed, to submit a notice of construction lien for recording no later than 180 days after final completion of the original contract, or 90 days after a notice of completion is filed but not later than those 180 days. A copy of the notice goes to the reputed owner or the record owner within 30 days after it is filed, and an action to enforce the lien is filed within 180 days after the notice of construction lien is filed, or, if an owner files for protection under the bankruptcy laws of the United States before those 180 days expire, within 90 days after the automatic stay is lifted or expires, with a notice of the pendency of the action filed for record in the same period.",
      "effectiveOrAmended": "Section 38-1a-501 was amended by Chapter 293, 2014 General Session, and sections 38-1a-502, 38-1a-507 and 38-1a-701 were renumbered and amended by Chapter 278, 2012 General Session. Section 68-3-7 was amended by Chapter 236, 2012 General Session. Section 63G-1-301, which lists the legal holidays, was amended by Chapter 124, 2026 General Session, and Chapter 126, 2026 General Session amends it again effective January 1, 2027.",
      "quotes": [
        {
          "id": "ut-q1",
          "text": "(a) A person who desires to claim a construction lien on real property shall file a preliminary notice with the registry no later than 20 days after the day on which the person commences providing construction work on the real property.",
          "citation": "Utah Code § 38-1a-501(1)(a)",
          "url": "https://web.archive.org/web/20170216155206id_/http://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S501_2014040320140513.pdf",
          "sourceId": "ut-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-02-16"
        },
        {
          "id": "ut-q2",
          "text": "(c) (i) A person who desires to claim a construction lien on real property but fails to file a timely preliminary notice within the period specified in Subsection (1)(a) may, subject to Subsection (1)(d), file a preliminary notice with the registry after the period specified in Subsection (1)(a). (ii) A person who files a preliminary notice under Subsection (1)(c)(i) may not claim a construction lien for construction work the person provides to the construction project before the date that is five days after the preliminary notice is filed.",
          "citation": "Utah Code § 38-1a-501(1)(c)",
          "url": "https://web.archive.org/web/20170216155206id_/http://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S501_2014040320140513.pdf",
          "sourceId": "ut-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-02-16"
        },
        {
          "id": "ut-q3",
          "text": "(d) Notwithstanding Subsections (1)(a) and (c), a preliminary notice has no effect if it is filed more than 10 days after the filing of a notice of completion under Section 38-1a-507 for the construction project for which the preliminary notice is filed.",
          "citation": "Utah Code § 38-1a-501(1)(d)",
          "url": "https://web.archive.org/web/20170216155206id_/http://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S501_2014040320140513.pdf",
          "sourceId": "ut-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-02-16"
        },
        {
          "id": "ut-q4",
          "text": "(e) A person who fails to file a preliminary notice as required in this section may not claim a construction lien.",
          "citation": "Utah Code § 38-1a-501(1)(e)",
          "url": "https://web.archive.org/web/20170216155206id_/http://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S501_2014040320140513.pdf",
          "sourceId": "ut-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-02-16"
        },
        {
          "id": "ut-q5",
          "text": "(a) A person who desires to claim a construction lien shall submit for recording in the office of each applicable county recorder a notice of construction lien no later than, except as provided in Subsection (1)(b): (i) 180 days after the date on which final completion of the original contract occurs, if no notice of completion is filed under Section 38-1a-507; or (ii) 90 days after the date on which a notice of completion is filed under Section 38-1a-507, but not later than 180 days after the date on which final completion of the original contract occurs.",
          "citation": "Utah Code § 38-1a-502(1)(a)",
          "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
          "sourceId": "ut-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q6",
          "text": "(b) A subcontractor who provides substantial work after a certificate of occupancy is issued or a required final inspection is completed and desires to claim a construction lien shall submit for recording in the office of each applicable county recorder a notice of construction lien no later than 180 days after final completion of that subcontractor's work.",
          "citation": "Utah Code § 38-1a-502(1)(b)",
          "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
          "sourceId": "ut-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q7",
          "text": "(a) Within 30 days after filing a notice of construction lien, the claimant shall deliver or mail by certified mail a copy of the notice to the reputed owner or the record owner.",
          "citation": "Utah Code § 38-1a-502(4)(a)",
          "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
          "sourceId": "ut-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q8",
          "text": "(b) If the record owner's current address is not readily available to the claimant, the claimant may mail a copy of the notice to the last known address of the record owner, using the names and addresses appearing on the last completed real property assessment rolls of the county where the project property is located.",
          "citation": "Utah Code § 38-1a-502(4)(b)",
          "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
          "sourceId": "ut-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q9",
          "text": "(c) Failure to deliver or mail the notice of lien to the reputed owner or record owner precludes the claimant from an award of costs and attorney fees against the reputed owner or record owner in an action to enforce the construction lien.",
          "citation": "Utah Code § 38-1a-502(4)(c)",
          "url": "https://web.archive.org/web/20170303133543id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S502_1800010118000101.pdf",
          "sourceId": "ut-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q10",
          "text": "(2) In order to enforce a preconstruction lien or construction lien, a claimant shall file an action to enforce the lien: (a) except as provided in Subsection (2)(b), within 180 days after the day on which the claimant files: (i) a notice of preconstruction lien under Section 38-1a-402, for a preconstruction lien; or (ii) a notice of construction lien under Section 38-1a-502, for a construction lien; or (b) if an owner files for protection under the bankruptcy laws of the United States before the expiration of the 180-day period under Subsection (2)(a), within 90 days after the automatic stay under the bankruptcy proceeding is lifted or expires.",
          "citation": "Utah Code § 38-1a-701(2)",
          "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
          "sourceId": "ut-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q11",
          "text": "(3) (a) (i) Within the time period provided in Subsection (2) for filing an action, a claimant shall file for record with each applicable county recorder a notice of the pendency of the action, in the manner provided for actions affecting the title or right to possession of real property. (ii) If a claimant fails to file for record a notice of the pendency of the action, as required in Subsection (3)(a)(i), the preconstruction lien or construction lien, as applicable, is void, except as to persons who have been made parties to the action and persons having actual knowledge of the commencement of the action.",
          "citation": "Utah Code § 38-1a-701(3)(a)",
          "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
          "sourceId": "ut-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q12",
          "text": "(4) (a) A preconstruction lien or construction lien is automatically and immediately void if an action to enforce the lien is not filed within the time required by this section.",
          "citation": "Utah Code § 38-1a-701(4)(a)",
          "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
          "sourceId": "ut-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q13",
          "text": "(6) (a) If a claimant files an action to enforce a preconstruction or construction lien involving a residence, the claimant shall include with the service of the complaint on the owner of the residence: (i) instructions to the owner of the residence relating to the owner's rights under Title 38, Chapter 11, Residence Lien Restriction and Lien Recovery Fund Act; and (ii) a form to enable the owner of the residence to specify the grounds upon which the owner may exercise available rights under Title 38, Chapter 11, Residence Lien Restriction and Lien Recovery Fund Act.",
          "citation": "Utah Code § 38-1a-701(6)(a)",
          "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
          "sourceId": "ut-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q14",
          "text": "(c) If a claimant fails to provide to the owner of the residence the instructions and form required by Subsection (6)(a), the claimant is barred from maintaining or enforcing the preconstruction or construction lien upon the residence.",
          "citation": "Utah Code § 38-1a-701(6)(c)",
          "url": "https://web.archive.org/web/20170303133554id_/http://le.utah.gov/xcode/Title38/Chapter1a/C38-1a-S701_1800010118000101.pdf",
          "sourceId": "ut-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-03-03"
        },
        {
          "id": "ut-q15",
          "text": "(a) Upon final completion of a construction project, a notice of completion may be filed with the registry by: (i) an owner; (ii) an original contractor for construction work; (iii) a lender that has provided financing for the construction project; (iv) a surety that has provided bonding for the construction project; or (v) a title company issuing a title insurance policy on the construction project.",
          "citation": "Utah Code § 38-1a-507(1)(a)",
          "url": "https://web.archive.org/web/20170217013047id_/https://le.utah.gov/xcode/Title38/Chapter1A/C38-1a-S507_1800010118000101.pdf",
          "sourceId": "ut-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2017-02-17"
        },
        {
          "id": "ut-q16",
          "text": "(1) A person shall compute the period of time provided by law to perform an act by: (a) excluding the first day; and (b) except as provided in Subsection (2), including the last day. (2) If the last day is a legal holiday, a Saturday, or a Sunday, then a person shall: (a) exclude the day described in this Subsection (2) from the time computation described in Subsection (1); and (b) compute the period of time to include the end of the next day that is not a legal holiday, a Saturday, or a Sunday.",
          "citation": "Utah Code § 68-3-7",
          "url": "https://web.archive.org/web/20250402062522id_/https://le.utah.gov/xcode/Title68/Chapter3/C68-3-S7_1800010118000101.html",
          "sourceId": "ut-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-04-02"
        },
        {
          "id": "ut-q17",
          "text": "(1) The following days are legal holidays in Utah: (a) except as provided in Subsection (2)(a) or (b): (i) January 1, New Year's Day; (ii) July 4, Independence Day; (iii) July 24, Pioneer Day; (iv) November 11, Veterans Day; (v) December 25, Christmas; and (vi) a day designated by proclamation issued by the president of the United States or the governor as a day of fasting or thanksgiving; (b) (i) the third Monday of January, Dr. Martin Luther King, Jr. Day; (ii) the third Monday of February, Presidents' Day; (iii) subject to Subsection (6), the Friday preceding Easter Sunday, Good Friday; (iv) the first Sunday after the first full moon that occurs on or after the spring equinox, Easter Sunday; (v) the last Monday of May, Memorial Day; (vi) the first Monday of September, Labor Day; (vii) the second Monday of October, Columbus Day; (viii) the fourth Thursday of November, Thanksgiving Day; and (ix) except as provided in Subsection (2)(c) or (d), June 19, Juneteenth National Freedom Day; and (c) except as provided in Subsection (3), every Sunday.",
          "citation": "Utah Code § 63G-1-301(1) (superseded January 1, 2027)",
          "url": "https://web.archive.org/web/20260708192127id_/https://le.utah.gov/xcode/Title63G/Chapter1/C63G-1-P3_1800010118000101.pdf",
          "sourceId": "ut-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-07-08"
        },
        {
          "id": "ut-q18",
          "text": "(1) The following days are legal holidays in Utah: (a) except as provided in Subsection (2): (i) January 1, New Year's Day; (ii) June 19, Juneteenth National Freedom Day; (iii) July 4, Independence Day; (iv) July 24, Pioneer Day; (v) November 11, Veterans Day; (vi) December 25, Christmas; and (vii) a day designated by proclamation issued by the president of the United States or the governor as a day of fasting or thanksgiving; (b) (i) the third Monday of January, Dr. Martin Luther King, Jr. Day; (ii) the third Monday of February, Presidents' Day; (iii) subject to Subsection (6), the Friday preceding Easter Sunday, Good Friday; (iv) the first Sunday after the first full moon that occurs on or after the spring equinox, Easter Sunday; (v) the last Monday of May, Memorial Day; (vi) the first Monday of September, Labor Day; (vii) the second Monday of October, Columbus Day; and (viii) the fourth Thursday of November, Thanksgiving Day; and (c) except as provided in Subsection (3), every Sunday.",
          "citation": "Utah Code § 63G-1-301(1) (effective January 1, 2027)",
          "url": "https://web.archive.org/web/20260708192127id_/https://le.utah.gov/xcode/Title63G/Chapter1/C63G-1-P3_1800010118000101.pdf",
          "sourceId": "ut-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-07-08"
        },
        {
          "id": "ut-q19",
          "text": "(2) (a) If a day described in Subsection (1)(a) falls on a Saturday, the preceding Friday is the legal holiday. (b) If a day described in Subsection (1)(a) falls on a Sunday, the following Monday is the legal holiday. (c) If June 19 falls on a Tuesday, Wednesday, Thursday, or Friday, the preceding Monday is the legal holiday. (d) If June 19 falls on Saturday or Sunday, the following Monday is the legal holiday.",
          "citation": "Utah Code § 63G-1-301(2) (superseded January 1, 2027)",
          "url": "https://web.archive.org/web/20260708192127id_/https://le.utah.gov/xcode/Title63G/Chapter1/C63G-1-P3_1800010118000101.pdf",
          "sourceId": "ut-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-07-08"
        },
        {
          "id": "ut-q20",
          "text": "(2) (a) If a day described in Subsection (1)(a) falls on a Saturday, the preceding Friday is the legal holiday. (b) If a day described in Subsection (1)(a) falls on a Sunday, the following Monday is the legal holiday.",
          "citation": "Utah Code § 63G-1-301(2) (effective January 1, 2027)",
          "url": "https://web.archive.org/web/20260708192127id_/https://le.utah.gov/xcode/Title63G/Chapter1/C63G-1-P3_1800010118000101.pdf",
          "sourceId": "ut-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-07-08"
        }
      ],
      "rules": [
        {
          "id": "ut-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 20
            }
          },
          "notComputed": null,
          "consequence": "A person who fails to file a preliminary notice as required may not claim a construction lien. A person who files late may not claim a construction lien for construction work provided before the date that is five days after the notice is filed, and a preliminary notice has no effect if it is filed more than 10 days after the filing of a notice of completion.",
          "recipients": [
            "The registry"
          ],
          "delivery": null,
          "quoteIds": [
            "ut-q1",
            "ut-q2",
            "ut-q3",
            "ut-q4"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the person commences providing construction work on the real property"
            }
          ]
        },
        {
          "id": "ut-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 180
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "notice-of-completion"
                },
                "period": {
                  "unit": "days",
                  "n": 90
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ut-q5"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "final completion of the original contract occurs"
            },
            {
              "event": "notice-of-completion",
              "clause": "a notice of completion is filed"
            }
          ]
        },
        {
          "id": "ut-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "sub"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a subcontractor who provides substantial work after a certificate of occupancy is issued or a required final inspection is completed",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "No later than 180 days after final completion of that subcontractor's work"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ut-q6"
          ]
        },
        {
          "id": "ut-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Failure to deliver or mail the notice precludes the claimant from an award of costs and attorney fees against the reputed owner or record owner in an action to enforce the construction lien.",
          "recipients": [
            "The reputed owner or the record owner"
          ],
          "delivery": "Delivered, or mailed by certified mail. If the record owner's current address is not readily available, the copy may be mailed to the record owner's last known address, using the names and addresses on the last completed real property assessment rolls of the county.",
          "quoteIds": [
            "ut-q7",
            "ut-q8",
            "ut-q9"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of construction lien is filed"
            }
          ]
        },
        {
          "id": "ut-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": "A construction lien is automatically and immediately void if an action to enforce it is not filed within that time. Within the same period the claimant files for record a notice of the pendency of the action, or the lien is void except as to persons who have been made parties to the action and persons having actual knowledge of the commencement of the action.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "ut-q10",
            "ut-q11",
            "ut-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice of construction lien is filed"
            }
          ],
          "mayChangeIf": "an owner files for bankruptcy under the laws of the United States before the 180-day period expires"
        }
      ],
      "residential": [
        {
          "text": "In an action to enforce a lien involving a residence, the claimant includes with the service of the complaint on the owner of the residence instructions relating to the owner's rights under the Residence Lien Restriction and Lien Recovery Fund Act and a form for the owner to specify the grounds upon which the owner may exercise them. A claimant who fails to provide them is barred from maintaining or enforcing the lien upon the residence.",
          "quoteIds": [
            "ut-q13",
            "ut-q14"
          ]
        }
      ],
      "commencementCompletion": [
        {
          "text": "Upon final completion of a construction project, an owner, an original contractor, a lender that has provided financing for the project, a surety that has provided bonding for it, or a title company issuing a title insurance policy on it may file a notice of completion with the registry. Once one is filed, the notice of construction lien is due, except as § 38-1a-502(1)(b) provides, no later than 90 days after its filing, but not later than 180 days after final completion of the original contract, and a preliminary notice filed more than 10 days after it has no effect.",
          "quoteIds": [
            "ut-q15",
            "ut-q5",
            "ut-q3"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "ut-q16"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "ut-q16",
            "ut-q17",
            "ut-q18"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "ut-q17",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Dr. Martin Luther King, Jr. Day",
            "quoteId": "ut-q17",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "ut-q17",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "ut-q17",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth National Freedom Day",
            "quoteId": "ut-q18",
            "validFrom": "2027-01-01",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "ut-q17",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Pioneer Day",
            "quoteId": "ut-q17",
            "kind": "fixed",
            "month": 7,
            "day": 24,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "ut-q17",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "ut-q17",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "ut-q17",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "ut-q17",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas",
            "quoteId": "ut-q17",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "ut-q17",
          "ut-q19",
          "ut-q18",
          "ut-q20"
        ],
        "holidaysNotModeled": [
          {
            "name": "Good Friday",
            "reason": "Utah Code § 63G-1-301(1) sets it as the Friday preceding Easter Sunday, whose date changes each year"
          },
          {
            "name": "Juneteenth National Freedom Day before January 1, 2027",
            "reason": "Utah Code § 63G-1-301(2), in the version superseded on that day, moves it to a Monday whenever June 19 falls on a day other than a Monday"
          }
        ]
      },
      "eventWording": [
        {
          "event": "first-furnishing",
          "clause": "the person commences providing construction work on the real property",
          "input": "Construction work first provided on the real property on",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "final completion of the original contract occurs",
          "input": "Final completion of the original contract on",
          "hint": null
        },
        {
          "event": "notice-of-completion",
          "clause": "a notice of completion is filed",
          "input": "Notice of completion filed with the registry on",
          "hint": "Leave empty if no notice of completion has been filed."
        },
        {
          "event": "lien-recorded",
          "clause": "the notice of construction lien is filed",
          "input": "Notice of construction lien filed on",
          "hint": "Leave empty if no notice of construction lien has been filed."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "ut-0",
        "ut-1",
        "ut-2",
        "ut-3",
        "ut-4",
        "ut-5"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "VA",
      "name": "Virginia",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "Va. Code tit. 43, ch. 1",
      "statuteUrl": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4/",
      "summary": "Virginia requires a memorandum of lien to be filed not later than 90 days from the last day of the month in which the claimant last performs labor or furnishes material, and in no event later than 90 days after the building, structure or railroad is completed or the work on it otherwise terminated. A suit to enforce the lien may not be brought after six months from the recording of the memorandum or sixty days from that completion or termination, whichever is later.",
      "effectiveOrAmended": "Section 43-4 as amended in 2019 (c. 243), section 43-4.01 as amended in 2013 (c. 293), section 43-7 as amended in 1984 (c. 521) and section 43-17 as amended in 1956 (c. 399).",
      "quotes": [
        {
          "id": "va-q1",
          "text": "Except as provided otherwise in this subsection, no person other than a person claiming a lien under subsection B of § 43-3 may claim a lien under this title or file a memorandum or otherwise perfect and enforce a lien under this title with respect to a one or two family residential dwelling unit if such person fails to notify any mechanics' lien agent identified on the building permit in accordance with subsection B above (i) within 30 days of the first date that he performs labor or furnishes material to or for the building or structure or (ii) within 30 days of the date such a permit is issued, if such labor or materials are first performed or furnished by such person prior to the issuance of a building permit.",
          "citation": "Va. Code § 43-4.01(C)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
          "sourceId": "va-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q2",
          "text": "However, the failure to give any such notices within the appropriate 30-day period as required by the previous sentence shall not bar a person from claiming a lien under this title or from filing a memorandum or otherwise perfecting and enforcing a lien under this title, provided that such lien is limited to labor performed or materials furnished on or after the date a notice is given by such person to the mechanics' lien agent in accordance with subsection B above.",
          "citation": "Va. Code § 43-4.01(C)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
          "sourceId": "va-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q3",
          "text": "No person shall be required to comply with this subsection as to any memorandum of lien which is recorded prior to the issuance of a building permit nor shall any person be required to comply with this subsection when the building permit does not designate a mechanics' lien agent.",
          "citation": "Va. Code § 43-4.01(C)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
          "sourceId": "va-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q4",
          "text": "If the building permit contains the name, mailing address, and telephone number of the mechanics' lien agent as defined in § 43-1, any person entitled to claim a lien under this title may notify the mechanics' lien agent then named on the permit or amended permit that he seeks payment for labor performed or material furnished by registered or certified mail or by physical delivery.",
          "citation": "Va. Code § 43-4.01(B)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
          "sourceId": "va-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q5",
          "text": "Any subcontractor, in order to perfect the lien given him by § 43-3 shall comply with § 43-4, and in addition give notice in writing to the owner of the property or his agent of the amount and character of his claim.",
          "citation": "Va. Code § 43-7(A)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-7/",
          "sourceId": "va-1",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q6",
          "text": "But the amount for which a subcontractor may perfect a lien under this section shall not exceed the amount in which the owner is indebted to the general contractor at the time the notice is given, or shall thereafter become indebted to the general contractor upon his contract with the general contractor for such structure or building or railroad.",
          "citation": "Va. Code § 43-7(A)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-7/",
          "sourceId": "va-1",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q7",
          "text": "As used in this chapter, the term \"general contractor\" includes contractors, laborers, mechanics, and persons furnishing materials, who contract directly with the owner, and the term \"subcontractor\" includes all such contractors, laborers, mechanics, and persons furnishing materials, who do not contract with the owner but with the general contractor.",
          "citation": "Va. Code § 43-1",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-1/",
          "sourceId": "va-2",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q8",
          "text": "Any person performing labor or furnishing materials for a subcontractor, in order to perfect the lien given him by § 43-3, shall comply with the provisions of § 43-4, and in addition thereto give notice in writing to the owner of the property, or his agent, and to the general contractor, or his agent, of the amount and character of his claim.",
          "citation": "Va. Code § 43-9",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-9/",
          "sourceId": "va-3",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q9",
          "text": "But the amount for which a lien may be perfected by such person shall not exceed the amount for which such subcontractor could himself claim a lien under § 43-7.",
          "citation": "Va. Code § 43-9",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-9/",
          "sourceId": "va-3",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q10",
          "text": "A general contractor, or any other lien claimant under §§ 43-7 and 43-9, in order to perfect the lien given by § 43-3, provided such lien has not been barred by § 43-4.01 C, shall file a memorandum of lien at any time after the work is commenced or material furnished, but not later than 90 days from the last day of the month in which he last performs labor or furnishes material, and in no event later than 90 days from the time such building, structure, or railroad is completed, or the work thereon otherwise terminated.",
          "citation": "Va. Code § 43-4",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4/",
          "sourceId": "va-4",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q11",
          "text": "A lien claimant who is a general contractor, and not lien claimants under §§ 43-7 and 43-9, also shall file along with the memorandum of lien, a certification of mailing of a copy of the memorandum of lien on the owner of the property at the owner's last known address.",
          "citation": "Va. Code § 43-4",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4/",
          "sourceId": "va-4",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q12",
          "text": "No suit to enforce any lien perfected under §§ 43-4, 43-5 and 43-7 to 43-10 shall be brought after six months from the time when the memorandum of lien was recorded or after sixty days from the time the building, structure or railroad was completed or the work thereon otherwise terminated, whichever time shall last occur; provided, however, that the filing of a petition to enforce any such lien in any suit wherein such petition may be properly filed shall be regarded as the institution of a suit under this section; and, provided further, that nothing herein shall extend the time within which such lien may be perfected.",
          "citation": "Va. Code § 43-17",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-17/",
          "sourceId": "va-5",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q13",
          "text": "The building permit for any one- or two-family residential dwelling unit issued pursuant to the Uniform Statewide Building Code shall be conspicuously and continuously posted on the property for which the permit is issued until all work is completed on the property. The permit shall be posted on the property before any labor is performed or any material furnished on the property for which the building permit is issued.",
          "citation": "Va. Code § 43-4.01(A)",
          "url": "https://law.lis.virginia.gov/vacode/title43/chapter1/section43-4.01/",
          "sourceId": "va-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q14",
          "text": "When an act of the General Assembly or rule of court requires that an act be performed within a prescribed amount of time after any event or judgment, the day on which the event or judgment occurred shall not be counted against the time allowed.",
          "citation": "Va. Code § 1-210(A)",
          "url": "https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-210/",
          "sourceId": "va-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "va-q15",
          "text": "When an act of the General Assembly or local governing body, order of the court, or administrative regulation or order requires, either by specification of a date or by a prescribed period of time, that an act be performed or an action be filed on a Saturday, Sunday, or legal holiday or on any day or part of a day on which the state or local government office where the act to be performed or the action to be filed is closed, the act may be performed or the action may be filed on the next business day that is not a Saturday, Sunday, legal holiday, or day on which the state or local government office is closed.",
          "citation": "Va. Code § 1-210(E)",
          "url": "https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-210/",
          "sourceId": "va-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "va-q16",
          "text": "When an act of the General Assembly specifies a maximum period of time in which a legal action may be brought and the last day of that period falls on a Saturday, Sunday, legal holiday, or day or part of a day on which the clerk's office is closed as authorized by an act of the General Assembly, the action may be brought on the next day that is not a Saturday, Sunday, legal holiday, or day or part of a day on which the clerk's office is closed as authorized by an act of the General Assembly.",
          "citation": "Va. Code § 1-210(C)",
          "url": "https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-210/",
          "sourceId": "va-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "va-q17",
          "text": "For the purposes of this section, any day on which the Governor authorizes the closing of the state government shall be considered a legal holiday.",
          "citation": "Va. Code § 1-210(F)",
          "url": "https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-210/",
          "sourceId": "va-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "va-q18",
          "text": "January 1 — New Year's Day. The third Monday in January — Martin Luther King, Jr., Day to honor Martin Luther King, Jr., (1929-1968), defender of causes. The third Monday in February — George Washington Day to honor George Washington (1732-1799), the first President of the United States.",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q19",
          "text": "The last Monday in May — Memorial Day to honor all persons who made the supreme sacrifice in giving their lives in defense of Virginia and the United States in the following wars and engagements and otherwise: Indian Uprising (1622), French and Indian Wars (1754-1763), Revolutionary War (1775-1783), War of 1812 (1812-1815), Mexican War (1846-1848), Civil War (1861-1865), Spanish-American War (1898), World War I (1917-1918), World War II (1941-1945), Korean War (1950-1953), Vietnam War (1965-1973), Operation Desert Shield-Desert Storm (1990-1991), Global War on Terrorism (2000- ), Operation Enduring Freedom (2001- ), and Operation Iraqi Freedom (2003- ). On this day all flags, national, state, and local, shall be flown at half-staff or half-mast to honor and acknowledge respect for those who made the supreme sacrifice.",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q20",
          "text": "June 19 — Juneteenth to commemorate the announcement of the abolition of slavery in Texas, the last of the former Confederate States of America to abolish slavery, and to recognize the significant roles and many contributions of African Americans to the Commonwealth and the nation. July 4 — Independence Day to honor the signing of the Declaration of Independence. The first Monday in September — Labor Day to honor all people who work in Virginia. The second Monday in October — Columbus Day and Yorktown Victory Day to honor Christopher Columbus (1451-1506), a discoverer of the Americas, and the final victory at Yorktown on October 19, 1781, in the Revolutionary War. The Tuesday following the first Monday in November — Election Day for the right of citizens of a free society to exercise the right to vote.",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q21",
          "text": "November 11 — Veterans Day to honor all persons who served in the Armed Forces of Virginia and the United States in the following wars and engagements and otherwise: Indian Uprising (1622), French and Indian Wars (1754-1763), Revolutionary War (1775-1783), War of 1812 (1812-1815), Mexican War (1846-1848), Civil War (1861-1865), Spanish American War (1898), World War I (1917-1918), World War II (1941-1945), Korean War (1950-1953), Vietnam War (1965-1973), Operation Desert Shield-Desert Storm (1990-1991), Global War on Terrorism (2000- ), Operation Enduring Freedom (2001- ), and Operation Iraqi Freedom (2003- ).",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q22",
          "text": "The fourth Thursday in November and the Friday next following — Thanksgiving Day to honor and give thanks in each person's own manner for the blessings bestowed upon the people of Virginia and honoring the first Thanksgiving in 1619. December 25 — Christmas Day.",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "va-q23",
          "text": "In each year, the following days are designated as legal holidays:",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "va-q24",
          "text": "Whenever any of such days falls on Saturday, the Friday next preceding such day, or whenever any of such days falls on Sunday, the Monday next following such day, and any day so appointed by the Governor of the Commonwealth or the President of the United States, shall be a legal holiday as to the transaction of all business.",
          "citation": "Va. Code § 2.2-3300",
          "url": "https://law.lis.virginia.gov/vacode/title2.2/chapter33/section2.2-3300/",
          "sourceId": "va-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "va-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "residential",
          "branch": "other",
          "branchNote": "Where the building permit names a mechanics' lien agent, except for a lien claimed under subsection B of § 43-3 or a memorandum of lien recorded before the permit is issued",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Without the notice, no lien may be claimed or perfected with respect to the dwelling unit. A late notice does not bar the lien, but the lien is then limited to labor performed or materials furnished on or after the date the notice is given.",
          "recipients": [
            "The mechanics' lien agent named on the building permit or amended permit"
          ],
          "delivery": "By registered or certified mail or by physical delivery.",
          "quoteIds": [
            "va-q1",
            "va-q2",
            "va-q3",
            "va-q4"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the first date that he performs labor or furnishes material to or for the building or structure"
            }
          ],
          "mayChangeIf": "the labor or materials were first performed or furnished before the building permit was issued",
          "mayChangeDirection": "later"
        },
        {
          "id": "va-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a subcontractor, which includes contractors, laborers, mechanics and persons furnishing materials who contract with the general contractor and not with the owner",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "In addition to complying with § 43-4, with no period stated"
          },
          "consequence": "The lien may not exceed the amount the owner owes the general contractor when the notice is given, or later comes to owe the general contractor under the contract.",
          "recipients": [
            "The owner of the property or his agent"
          ],
          "delivery": "In writing, stating the amount and character of the claim.",
          "quoteIds": [
            "va-q5",
            "va-q6",
            "va-q7"
          ]
        },
        {
          "id": "va-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a person performing labor or furnishing materials for a subcontractor",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "In addition to complying with § 43-4, with no period stated"
          },
          "consequence": "The lien may not exceed the amount for which the subcontractor could claim a lien under § 43-7.",
          "recipients": [
            "The owner of the property, or his agent",
            "The general contractor, or his agent"
          ],
          "delivery": "In writing, stating the amount and character of the claim.",
          "quoteIds": [
            "va-q8",
            "va-q9"
          ]
        },
        {
          "id": "va-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Not later than 90 days from the last day of the month in which the claimant last performs labor or furnishes material, and in no event later than 90 days from the time the building, structure, or railroad is completed, or the work thereon otherwise terminated"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "va-q10"
          ]
        },
        {
          "id": "va-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a general contractor, which includes contractors, laborers, mechanics and persons furnishing materials who contract directly with the owner",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "other",
            "note": "Along with the memorandum of lien"
          },
          "consequence": null,
          "recipients": [
            "The owner of the property, at the owner's last known address"
          ],
          "delivery": "A copy of the memorandum of lien is mailed to the owner, and a certification of that mailing is filed along with the memorandum.",
          "quoteIds": [
            "va-q11",
            "va-q7"
          ]
        },
        {
          "id": "va-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "later-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "lien-recorded"
                },
                "period": {
                  "unit": "months",
                  "n": 6
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 60
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "va-q12"
          ],
          "eventWording": [
            {
              "event": "completion",
              "clause": "the building, structure or railroad was completed or the work thereon otherwise terminated"
            },
            {
              "event": "lien-recorded",
              "clause": "the memorandum of lien was recorded"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "The building permit for a one- or two-family residential dwelling unit must be posted on the property before any labor is performed or material furnished, and must stay posted until all work on the property is completed.",
          "quoteIds": [
            "va-q13"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": {
        "text": "In these rules, residential means a one or two family residential dwelling unit.",
        "quoteIds": [
          "va-q1"
        ]
      },
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "va-q14"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "rollTo": "businessDay",
          "quoteIds": [
            "va-q15",
            "va-q16",
            "va-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "va-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr., Day",
            "quoteId": "va-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "George Washington Day",
            "quoteId": "va-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "va-q19",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "va-q20",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "va-q20",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "va-q20",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day and Yorktown Victory Day",
            "quoteId": "va-q20",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Election Day",
            "quoteId": "va-q20",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 1,
            "nth": 1,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "va-q21",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "va-q22",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "the Friday next following the fourth Thursday in November",
            "quoteId": "va-q22",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "va-q22",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "va-q23",
          "va-q18",
          "va-q19",
          "va-q20",
          "va-q21",
          "va-q22",
          "va-q24"
        ],
        "closure": {
          "clause": "on any day or part of a day on which the state or local government office where the act is to be performed or the action is to be filed is closed",
          "place": "the state or local government office",
          "quoteIds": [
            "va-q15"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "any day appointed by the Governor of the Commonwealth or the President of the United States",
            "reason": "Va. Code § 2.2-3300 makes it a legal holiday without stating its date"
          },
          {
            "name": "any day on which the Governor authorizes the closing of the state government",
            "reason": "Va. Code § 1-210(F) makes it a legal holiday for computing time without stating its date"
          }
        ]
      },
      "eventWording": [
        {
          "event": "completion",
          "clause": "the building, structure, or railroad is completed, or the work thereon otherwise terminated",
          "input": "Building, structure or railroad completed, or work otherwise terminated, on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the memorandum of lien is recorded",
          "input": "Memorandum of lien recorded on",
          "hint": "Leave empty if no memorandum of lien has been recorded."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "va-0",
        "va-1",
        "va-2",
        "va-3",
        "va-4",
        "va-5",
        "va-6",
        "va-7"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "VT",
      "name": "Vermont",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "9 V.S.A. ch. 51, subch. 1",
      "statuteUrl": "https://legislature.vermont.gov/statutes/section/09/051/01921",
      "summary": "Vermont gives a lien to the person proceeding under a contract for erecting, repairing, moving, or altering improvements to real property, or for furnishing labor or material for them, and to a person who contracts with an agent, contractor, or subcontractor of the owner by giving written notice to the owner or the owner's agent having charge of the property that the person claims a lien. The lien does not continue in force for more than 180 days from the time payment became due for the last labor performed or materials furnished unless a notice of the lien is filed in the office of the town clerk, and the action to enforce it may be commenced within 180 days from filing the memorandum if payment is then due, or within 180 days from the time payment becomes due if it is not.",
      "effectiveOrAmended": "Section 1921 was amended by 1985, No. 128 (Adj. Sess.) and 2003, No. 144 (Adj. Sess.), and section 1924 by 2003, No. 144 (Adj. Sess.). The statutes as published include the actions of the 2025 session of the General Assembly.",
      "quotes": [
        {
          "id": "vt-q1",
          "text": "(b) A person who by virtue of a contract or agreement, either in writing or parol, with an agent, contractor, or subcontractor of the owner thereof, performs labor or furnishes materials for erecting, repairing, moving, or altering such improvements shall have a lien, to secure the payment of the same upon such improvements and the lot of land upon which the same stand, by giving notice in writing to such owner or his or her agent having charge of such property that he or she shall claim a lien for labor or material.",
          "citation": "9 V.S.A. § 1921(b)",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
          "sourceId": "vt-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q2",
          "text": "The notice shall include the date that payment is due, if known.",
          "citation": "9 V.S.A. § 1921(b)",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
          "sourceId": "vt-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q3",
          "text": "Such lien shall extend to the portions of the contract price remaining unpaid at the time such notice is received.",
          "citation": "9 V.S.A. § 1921(b)",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
          "sourceId": "vt-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q4",
          "text": "(a) When a contract or agreement is made, whether in writing or not, for erecting, repairing, moving, or altering improvements to real property or for furnishing labor or material therefor, the person proceeding in pursuance of such contract or agreement shall have a lien upon such improvements and the lot of land on which the same stand to secure the payment of the same.",
          "citation": "9 V.S.A. § 1921(a)",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
          "sourceId": "vt-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q5",
          "text": "(c) A lien herein provided for shall not continue in force for more than 180 days from the time when payment became due for the last of such labor performed or materials furnished unless a notice of such lien is filed in the office of the town clerk as hereinafter provided.",
          "citation": "9 V.S.A. § 1921(c)",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01921",
          "sourceId": "vt-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q6",
          "text": "A person claiming a lien under section 1921 of this title shall file for record in the clerk’s office of the town where such real estate is situated a written memorandum, signed by him or her, asserting his or her claim, which shall charge such real estate with such lien as of the visible commencement of work or delivery of material to the extent and subject to the exceptions provided in sections 1921 and 1922 of this title.",
          "citation": "9 V.S.A. § 1923",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01923",
          "sourceId": "vt-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q7",
          "text": "Within 180 days from the time of filing such memorandum, if such payment is due at the time of such filing and within 180 days from the time such payment becomes due, if not due at the time of such filing, such person may commence his or her action for the same and cause such real estate or other property to be attached thereon.",
          "citation": "9 V.S.A. § 1924",
          "url": "https://legislature.vermont.gov/statutes/section/09/051/01924",
          "sourceId": "vt-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "vt-q8",
          "text": "When time is to be reckoned from a day, date, or an act done, such day, date, or day when such act is done shall not be included in the computation, unless otherwise provided.",
          "citation": "1 V.S.A. § 138",
          "url": "https://legislature.vermont.gov/statutes/section/01/003/00138",
          "sourceId": "vt-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "vt-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Written notice to the owner or the owner's agent having charge of the property, with no period stated"
          },
          "consequence": "The lien extends to the portions of the contract price remaining unpaid at the time the notice is received.",
          "recipients": [
            "The owner or the owner's agent having charge of the property"
          ],
          "delivery": "In writing, stating that the person claims a lien for labor or material and including the date that payment is due, if known.",
          "quoteIds": [
            "vt-q1",
            "vt-q2",
            "vt-q3"
          ]
        },
        {
          "id": "vt-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "vt-q4"
          ]
        },
        {
          "id": "vt-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 180 days from the time when payment became due for the last of such labor performed or materials furnished"
          },
          "consequence": "The lien does not continue in force for more than that time unless a notice of the lien is filed in the office of the town clerk.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "vt-q5",
            "vt-q6"
          ]
        },
        {
          "id": "vt-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If payment is due at the time the memorandum is filed",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "vt-q7"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the memorandum is filed"
            }
          ]
        },
        {
          "id": "vt-enforcement-1",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "If payment is not due at the time the memorandum is filed",
          "required": null,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Within 180 days from the time such payment becomes due"
          },
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "vt-q7"
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "vt-q8"
          ]
        },
        "rolling": null,
        "businessDays": null,
        "holidays": [],
        "holidaysComplete": false,
        "holidayQuoteIds": []
      },
      "eventWording": [
        {
          "event": "lien-recorded",
          "clause": "the memorandum is filed",
          "input": "Memorandum of lien filed with the town clerk on",
          "hint": "Leave empty if no memorandum has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "vt-0",
        "vt-1",
        "vt-2",
        "vt-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "WA",
      "name": "Washington",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "RCW ch. 60.04",
      "statuteUrl": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
      "summary": "Washington requires a notice of claim of lien to be filed for recording not later than ninety days after the claimant has ceased to furnish labor, professional services, materials, or equipment, and the lien binds the property no longer than eight calendar months after recording unless an action is filed within that time and the owner is served within ninety days of filing it. A person furnishing professional services, materials, or equipment who does not contract directly with the owner gives the owner a notice of the right to claim a lien unless RCW 60.04.031(2) excuses it, and the notice reaches only what was supplied after sixty days before it, or ten days for new construction of a single-family residence.",
      "effectiveOrAmended": "Sections 60.04.031, 60.04.091 and 60.04.141 as amended by Laws of 1992, ch. 126, and section 60.04.101 as enacted by Laws of 1991, ch. 281.",
      "quotes": [
        {
          "id": "wa-q1",
          "text": "Except as otherwise provided in this section, every person furnishing professional services, materials, or equipment for the improvement of real property shall give the owner or reputed owner notice in writing of the right to claim a lien.",
          "citation": "RCW 60.04.031(1)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q2",
          "text": "If the prime contractor is in compliance with the requirements of RCW 19.27.095, 60.04.230, and 60.04.261, this notice shall also be given to the prime contractor as described in this subsection unless the potential lien claimant has contracted directly with the prime contractor.",
          "citation": "RCW 60.04.031(1)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q3",
          "text": "The notice may be given at any time but only protects the right to claim a lien for professional services, materials, or equipment supplied after the date which is sixty days before: (a) Mailing the notice by certified or registered mail to the owner or reputed owner; or (b) Delivering or serving the notice personally upon the owner or reputed owner and obtaining evidence of delivery in the form of a receipt or other acknowledgment signed by the owner or reputed owner or an affidavit of service.",
          "citation": "RCW 60.04.031(1)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q4",
          "text": "A lien authorized by this chapter shall not be enforced unless the lien claimant has complied with the applicable provisions of this section.",
          "citation": "RCW 60.04.031(6)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q5",
          "text": "In the case of new construction of a single-family residence, the notice of a right to claim a lien may be given at any time but only protects the right to claim a lien for professional services, materials, or equipment supplied after a date which is ten days before the notice is given as described in this subsection.",
          "citation": "RCW 60.04.031(1)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q6",
          "text": "Persons who furnish professional services, materials, or equipment in connection with the repair, alteration, or remodel of an existing owner-occupied single-family residence or appurtenant garage: (a) Who contract directly with the owner-occupier or their common law agent shall not be required to send a written notice of the right to claim a lien and shall have a lien for the full amount due under their contract, as provided in RCW 60.04.021; or (b) Who do not contract directly with the owner-occupier or their common law agent shall give notice of the right to claim a lien to the owner-occupier.",
          "citation": "RCW 60.04.031(3)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q7",
          "text": "Liens of persons furnishing professional services, materials, or equipment who do not contract directly with the owner-occupier or their common law agent may only be satisfied from amounts not yet paid to the prime contractor by the owner at the time the notice described in this section is received, regardless of whether amounts not yet paid to the prime contractor are due.",
          "citation": "RCW 60.04.031(3)(b)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q8",
          "text": "For the purposes of this subsection \"received\" means actual receipt of notice by personal service, or registered or certified mail, or three days after mailing by registered or certified mail, excluding Saturdays, Sundays, or legal holidays.",
          "citation": "RCW 60.04.031(3)(b)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q9",
          "text": "Notices of a right to claim a lien shall not be required of: (a) Persons who contract directly with the owner or the owner's common law agent; (b) Laborers whose claim of lien is based solely on performing labor; or (c) Subcontractors who contract for the improvement of real property directly with the prime contractor, except as provided in subsection (3)(b) of this section.",
          "citation": "RCW 60.04.031(2)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q10",
          "text": "Every person claiming a lien under RCW 60.04.021 shall file for recording, in the county where the subject property is located, a notice of claim of lien not later than ninety days after the person has ceased to furnish labor, professional services, materials, or equipment or the last date on which employee benefit contributions were due.",
          "citation": "RCW 60.04.091",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q11",
          "text": "The period provided for recording the claim of lien is a period of limitation and no action to foreclose a lien shall be maintained unless the claim of lien is filed for recording within the ninety-day period stated.",
          "citation": "RCW 60.04.091",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q12",
          "text": "When furnishing labor, professional services, materials, or equipment for the construction of two or more separate residential units, the time for filing claims of lien against each separate residential unit shall commence to run upon the cessation of the furnishing of labor, professional services, materials, or equipment on each residential unit, as provided in this chapter.",
          "citation": "RCW 60.04.101",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q13",
          "text": "For the purposes of this section a separate residential unit is defined as consisting of one residential structure together with any garages or other outbuildings appurtenant thereto.",
          "citation": "RCW 60.04.101",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q14",
          "text": "The lien claimant shall give a copy of the claim of lien to the owner or reputed owner by mailing it by certified or registered mail or by personal service within fourteen days of the time the claim of lien is filed for recording.",
          "citation": "RCW 60.04.091",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "wa-q15",
          "text": "Failure to do so results in a forfeiture of any right the claimant may have to attorneys' fees and costs against the owner under RCW 60.04.181.",
          "citation": "RCW 60.04.091",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q16",
          "text": "No lien created by this chapter binds the property subject to the lien for a longer period than eight calendar months after the claim of lien has been recorded unless an action is filed by the lien claimant within that time in the superior court in the county where the subject property is located to enforce the lien, and service is made upon the owner of the subject property within ninety days of the date of filing the action; or, if credit is given and the terms thereof are stated in the claim of lien, then eight calendar months after the expiration of such credit; and in case the action is not prosecuted to judgment within two years after the commencement thereof, the court, in its discretion, may dismiss the action for want of prosecution, and the dismissal of the action or a judgment rendered thereon that no lien exists shall constitute a cancellation of the lien.",
          "citation": "RCW 60.04.141",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q17",
          "text": "This is a period of limitation, which shall be tolled by the filing of any petition seeking protection under Title Eleven, United States Code by an owner of any property subject to the lien established by this chapter.",
          "citation": "RCW 60.04.141",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=60.04&full=true",
          "sourceId": "wa-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q18",
          "text": "The time within which an act is to be done, as herein provided, shall be computed by excluding the first day, and including the last, unless the last day is a holiday, Saturday, or Sunday, and then it is also excluded.",
          "citation": "RCW 1.12.040",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=1.12.040",
          "sourceId": "wa-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        },
        {
          "id": "wa-q19",
          "text": "(1) The following are state legal holidays: (a) Sunday; (b) The first day of January, commonly called New Year's Day; (c) The third Monday of January, celebrated as the anniversary of the birth of Martin Luther King, Jr.; (d) The third Monday of February, to be known as Presidents' Day and celebrated as the anniversary of the births of Abraham Lincoln and George Washington; (e) The last Monday of May, commonly known as Memorial Day; (f) The nineteenth day of June, recognized as Juneteenth, a day of remembrance for the day the African slaves learned of their freedom; (g) The fourth day of July, the anniversary of the Declaration of Independence; (h) The first Monday in September, to be known as Labor Day; (i) The eleventh day of November, to be known as Veterans Day; (j) The fourth Thursday in November, to be known as Thanksgiving Day; (k) The Friday immediately following the fourth Thursday in November, to be known as Native American Heritage Day; and (l) The twenty-fifth day of December, commonly called Christmas Day.",
          "citation": "RCW 1.16.050(1)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=1.16.050",
          "sourceId": "wa-2",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wa-q20",
          "text": "(5) Whenever any state legal holiday: (a) Other than Sunday, falls upon a Sunday, the following Monday is the legal holiday; or (b) Falls upon a Saturday, the preceding Friday is the legal holiday.",
          "citation": "RCW 1.16.050(5)",
          "url": "https://app.leg.wa.gov/RCW/default.aspx?cite=1.16.050",
          "sourceId": "wa-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "wa-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At any time, for professional services, materials, or equipment supplied after the date which is sixty days before the notice is mailed or delivered"
          },
          "consequence": "A lien may be claimed only for professional services, materials, or equipment supplied after the date sixty days before the notice is mailed or delivered, and a lien may not be enforced unless the claimant has complied with the applicable provisions of RCW 60.04.031.",
          "recipients": [
            "The owner or reputed owner",
            "The prime contractor, if the prime contractor is in compliance with RCW 19.27.095, 60.04.230 and 60.04.261, unless the claimant contracted directly with the prime contractor"
          ],
          "delivery": "By certified or registered mail to the owner or reputed owner, or by delivering or serving the notice personally and obtaining a receipt or other acknowledgment signed by the owner or reputed owner, or an affidavit of service.",
          "quoteIds": [
            "wa-q1",
            "wa-q2",
            "wa-q3",
            "wa-q4"
          ]
        },
        {
          "id": "wa-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "In the case of new construction of a single-family residence",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At any time, for professional services, materials, or equipment supplied after a date which is ten days before the notice is given"
          },
          "consequence": "A lien may be claimed only for professional services, materials, or equipment supplied after the date ten days before the notice is given.",
          "recipients": [
            "The owner or reputed owner",
            "The prime contractor, if the prime contractor is in compliance with RCW 19.27.095, 60.04.230 and 60.04.261, unless the claimant contracted directly with the prime contractor"
          ],
          "delivery": "By certified or registered mail to the owner or reputed owner, or by delivering or serving the notice personally and obtaining a receipt or other acknowledgment signed by the owner or reputed owner, or an affidavit of service.",
          "quoteIds": [
            "wa-q5",
            "wa-q1",
            "wa-q3"
          ]
        },
        {
          "id": "wa-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the repair, alteration, or remodel of an existing owner-occupied single-family residence or appurtenant garage, by a person who does not contract directly with the owner-occupier or their common law agent",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "no-fixed-period",
            "note": "Given to the owner-occupier, with no period stated"
          },
          "consequence": "The liens of these persons may only be satisfied from amounts not yet paid to the prime contractor by the owner when the notice is received, whether or not those amounts are due.",
          "recipients": [
            "The owner-occupier"
          ],
          "delivery": "The notice is received on actual receipt by personal service, or registered or certified mail, or three days after mailing by registered or certified mail, excluding Saturdays, Sundays, or legal holidays.",
          "quoteIds": [
            "wa-q6",
            "wa-q7",
            "wa-q8"
          ]
        },
        {
          "id": "wa-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wa-q9"
          ]
        },
        {
          "id": "wa-preliminary-notice-4",
          "stage": "preliminary-notice",
          "roles": [
            "sub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wa-q9"
          ]
        },
        {
          "id": "wa-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": "The recording period is a period of limitation, and no action to foreclose a lien may be maintained unless the claim of lien is filed for recording within the ninety days.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wa-q10",
            "wa-q11"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the person has ceased to furnish labor, professional services, materials, or equipment"
            }
          ]
        },
        {
          "id": "wa-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For the construction of two or more separate residential units, for each unit",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 90
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wa-q12",
            "wa-q13",
            "wa-q10"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the cessation of the furnishing of labor, professional services, materials, or equipment on each residential unit"
            }
          ]
        },
        {
          "id": "wa-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 14
            }
          },
          "notComputed": null,
          "consequence": "Failure to do so results in a forfeiture of any right the claimant may have to attorneys' fees and costs against the owner under RCW 60.04.181.",
          "recipients": [
            "The owner or reputed owner"
          ],
          "delivery": "By certified or registered mail or by personal service.",
          "quoteIds": [
            "wa-q14",
            "wa-q15"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is filed for recording"
            }
          ]
        },
        {
          "id": "wa-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 8
            }
          },
          "notComputed": null,
          "consequence": "The lien does not bind the property longer than eight calendar months after the claim of lien is recorded unless an action to enforce it is filed within that time in the superior court of the county where the property is located and service is made on the owner within ninety days of the date of filing the action.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wa-q16",
            "wa-q17"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim of lien is recorded"
            }
          ],
          "mayChangeIf": "credit is given and its terms are stated in the claim of lien, or an owner of the property files a petition under Title Eleven, United States Code",
          "mayChangeDirection": "later"
        }
      ],
      "residential": [],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "wa-q18"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "wa-q18"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "wa-q19",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King, Jr. birthday",
            "quoteId": "wa-q19",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "wa-q19",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "wa-q19",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Juneteenth",
            "quoteId": "wa-q19",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "wa-q19",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "wa-q19",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans Day",
            "quoteId": "wa-q19",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "wa-q19",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Native American Heritage Day",
            "quoteId": "wa-q19",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "wa-q19",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": true,
        "holidayQuoteIds": [
          "wa-q19",
          "wa-q20"
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the person has ceased to furnish labor, professional services, materials, or equipment",
          "input": "Ceased to furnish labor, professional services, materials, or equipment on",
          "hint": "For a claim of employee benefit contributions, RCW 60.04.091 counts instead from the last date on which they were due."
        },
        {
          "event": "lien-recorded",
          "clause": "the claim of lien is recorded",
          "input": "Claim of lien recorded on",
          "hint": "Leave empty if no claim of lien has been recorded."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "wa-0",
        "wa-1",
        "wa-2"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "WI",
      "name": "Wisconsin",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "Wis. Stat. ch. 779, subch. I",
      "statuteUrl": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
      "summary": "Wisconsin requires a claim for a lien to be filed within 6 months from the date the claimant last performed, furnished, or procured labor, services, materials, plans, or specifications, after a written notice of intent served on the owner at least 30 days before, and an action brought within 2 years from the filing. On a wholly residential improvement that provides or adds no more than 4 family living units, a prime contractor that has contracted or will contract with subcontractors, suppliers, or service providers includes a notice in its written contract with the owner, or serves it within 10 days where there is none, and other claimants, apart from the exceptions in section 779.02(1), serve the owner a notice within 60 days after first furnishing.",
      "effectiveOrAmended": "Sections 779.02 and 779.06 as amended by 2005 Wis. Act 204.",
      "quotes": [
        {
          "id": "wi-q1",
          "text": "Every prime contractor who enters into a contract with the owner for a work of improvement on the owner’s land and who has contracted or will contract with any subcontractors, suppliers, or service providers to perform, furnish, or procure labor, services, materials, plans, or specifications for the work of improvement shall include in any written contract with the owner the notice required by this paragraph, and shall provide the owner with a copy of the written contract.",
          "citation": "Wis. Stat. § 779.02(2)(a)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q2",
          "text": "If no written contract for the work of improvement is entered into, the notice shall be prepared separately and served on the owner or authorized agent within 10 days after the first labor, services, materials, plans, or specifications are performed, furnished, or procured for the improvement by or pursuant to the authority of the prime contractor.",
          "citation": "Wis. Stat. § 779.02(2)(a)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q3",
          "text": "The notice, whether included in a written contract or separately given, shall be in at least 8-point bold type, if printed, or in capital letters, if typewritten.",
          "citation": "Wis. Stat. § 779.02(2)(a)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q4",
          "text": "If any prime contractor required to give the notice prescribed in par. (a) fails to give notice as required, the prime contractor does not have the lien and remedy provided by this subchapter unless the prime contractor pays all of the prime contractor’s obligations to its subcontractors, suppliers, and service providers in respect to the work of improvement within the time periods under s. 779.06 and until the time for notice under par. (b) has elapsed and either none of its subcontractors, suppliers, or service providers gives notice as a lien claimant under par. (b) or all of its subcontractors, suppliers, and service providers have waived all lien rights in full under s. 779.05.",
          "citation": "Wis. Stat. § 779.02(2)(c)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q5",
          "text": "The notice required to be given by lien claimants under sub. (2) shall not be required to be given in the following cases only: (a) By any laborer or mechanic employed by any prime contractor or subcontractor. (b) By any lien claimant who has contracted directly with the owner for the labor, services, materials, plans, or specifications performed, furnished, or procured, unless the claimant is a prime contractor subject to the notice requirement of sub. (2) (a). (c) By any lien claimant performing, furnishing, or procuring labor, services, materials, plans, or specifications for an improvement in any case where more than 4 family living units are to be provided or added by such work of improvement, if the improvement is wholly residential in character, or in any case where the improvement is partly or wholly nonresidential in character.",
          "citation": "Wis. Stat. § 779.02(1)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q6",
          "text": "By any prime contractor who is personally an owner of the land to be improved, by any corporate prime contractor of which an owner of the land is an officer or controlling shareholder, by any prime contractor who is an officer or controlling shareholder of a corporation which is an owner of the land or by any corporate prime contractor managed or controlled by substantially the same persons who manage or control a corporation which is an owner of the land. (e) By any lien claimant, other than a prime contractor, who performs, furnishes, or procures labor, services, materials, plans, or specifications for an improvement on a project on which the prime contractor is not required to give notice under this section.",
          "citation": "Wis. Stat. § 779.02(1)(d), (e)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q7",
          "text": "Every person other than a prime contractor who performs, furnishes, or procures labor, materials, plans, or specifications for an improvement shall have the lien and remedy under this subchapter only if within 60 days after performing, furnishing, or procuring the first labor, services, materials, plans, or specifications the person serves a written notice, in 2 signed copies, on the owner or authorized agent at the last-known post-office address.",
          "citation": "Wis. Stat. § 779.02(2)(b)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q8",
          "text": "Any lien claimant, other than the prime contractor, who fails to give a notice as required by sub. (2) (b) shall have no lien on the land or improvement to which the failure relates.",
          "citation": "Wis. Stat. § 779.02(3)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q9",
          "text": "Any claimant who serves a late but otherwise proper notice on the owner or authorized agent shall have the lien provided by s. 779.01 for any labor, services, materials, plans, or specifications performed, furnished, or procured after the late notice is actually received by the owner.",
          "citation": "Wis. Stat. § 779.02(3)",
          "url": "https://web.archive.org/web/20251214080314id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/02",
          "sourceId": "wi-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-14"
        },
        {
          "id": "wi-q10",
          "text": "No lien claim may be filed or action brought thereon unless, at least 30 days before timely filing of the lien claim, the lien claimant serves on the owner a written notice of intent to file a lien claim.",
          "citation": "Wis. Stat. § 779.06(2)",
          "url": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
          "sourceId": "wi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-14"
        },
        {
          "id": "wi-q11",
          "text": "The notice is required to be given whether or not the claimant has been required to and has given a previous notice pursuant to s. 779.02.",
          "citation": "Wis. Stat. § 779.06(2)",
          "url": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
          "sourceId": "wi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-14"
        },
        {
          "id": "wi-q12",
          "text": "No lien under s. 779.01 shall exist and no action to enforce a lien under s. 779.01 shall be maintained unless within 6 months from the date the lien claimant performed, furnished, or procured the last labor, services, materials, plans, or specifications, a claim for the lien is filed in the office of the clerk of circuit court of the county in which the lands affected by the lien lie, and unless within 2 years from the date of filing a claim for lien an action is brought and summons and complaint filed.",
          "citation": "Wis. Stat. § 779.06(1)",
          "url": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
          "sourceId": "wi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-14"
        },
        {
          "id": "wi-q13",
          "text": "A lien claimant shall serve a copy of the claim for lien on the owner of the property on which the lien is placed within 30 days after filing the claim.",
          "citation": "Wis. Stat. § 779.06(1)",
          "url": "https://web.archive.org/web/20260314193730id_/https://docs.legis.wisconsin.gov/statutes/statutes/779/i/06",
          "sourceId": "wi-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-14"
        },
        {
          "id": "wi-q14",
          "text": "The time within which an act is to be done or proceeding had or taken shall be computed by excluding the first day and including the last; and when any such time is expressed in hours the whole of Sunday and of any legal holiday, from midnight to midnight, shall be excluded.",
          "citation": "Wis. Stat. § 990.001(4)(a)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        },
        {
          "id": "wi-q15",
          "text": "Regardless of whether the time limited in any statute for the taking of any proceeding or the doing of an act is measured from an event or from the date or day on which such event occurs, the day on which such event took place shall be excluded in the computation of such time.",
          "citation": "Wis. Stat. § 990.001(4)(d)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        },
        {
          "id": "wi-q16",
          "text": "If the last day within which an act is to be done or proceeding had or taken falls on a Sunday or legal holiday the act may be done or the proceeding had or taken on the next secular day.",
          "citation": "Wis. Stat. § 990.001(4)(b)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        },
        {
          "id": "wi-q17",
          "text": "“Legal holiday” as used in this section means any statewide legal holiday provided in s. 995.20.",
          "citation": "Wis. Stat. § 990.001(4)(e)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        },
        {
          "id": "wi-q18",
          "text": "January 1, the 3rd Monday in January (which shall be the day of celebration for January 15), the 3rd Monday in February (which shall be the day of celebration for February 12 and 22), the last Monday in May (which shall be the day of celebration for May 30), June 19, which shall be the day of observation for Juneteenth Day, July 4, the 1st Monday in September which shall be known as Labor day, the 2nd Monday in October, November 11, the 4th Thursday in November (which shall be the day of celebration for Thanksgiving), December 25, the day of holding the partisan primary election, and the day of holding the general election in November are legal holidays.",
          "citation": "Wis. Stat. § 995.20",
          "url": "https://web.archive.org/web/20260303050923id_/https://docs.legis.wisconsin.gov/statutes/statutes/995/20",
          "sourceId": "wi-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-03"
        },
        {
          "id": "wi-q19",
          "text": "Whenever any legal holiday falls on Sunday, the succeeding Monday shall be the legal holiday.",
          "citation": "Wis. Stat. § 995.20",
          "url": "https://web.archive.org/web/20260303050923id_/https://docs.legis.wisconsin.gov/statutes/statutes/995/20",
          "sourceId": "wi-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-03-03"
        },
        {
          "id": "wi-q20",
          "text": "When an act is permitted to be done by the use of the postal service, and the last day within the time prescribed by law for performing such act falls on a legal public holiday under federal law, or other holiday designated by the president such that the postal service does not receive registered mail or make regular deliveries on that day, the day shall be considered a legal holiday for purposes of this section.",
          "citation": "Wis. Stat. § 990.001(4)(e)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        },
        {
          "id": "wi-q21",
          "text": "When the last day within which a proceeding is to be had or taken or an act done, which consists of any payment to or the service upon or the filing with any officer, agent, agency, department or division of the state or of any county, city, village, town, school district or other subdivision of the state, of any money, return, statement, report, notice or other document, falls on a Saturday and the duly established official office hours of such officer, agent, agency, department or division to which such payment is to be made or upon which such service is to be made or with which such return, statement, report, notice or other document is required to be filed, do not include any office hours thereof on such Saturday, said proceeding may be had or taken or such act may be done on the next succeeding day that is not a Sunday or a legal holiday.",
          "citation": "Wis. Stat. § 990.001(4)(c)",
          "url": "https://web.archive.org/web/20260419111345id_/https://docs.legis.wisconsin.gov/statutes/statutes/990/001",
          "sourceId": "wi-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2026-04-19"
        }
      ],
      "rules": [
        {
          "id": "wi-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a prime contractor who has contracted or will contract with any subcontractors, suppliers, or service providers, if no written contract for the work of improvement is entered into, except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 10
            }
          },
          "notComputed": null,
          "consequence": "A prime contractor required to give the notice who fails to give it does not have the lien unless it pays all its obligations to its subcontractors, suppliers, and service providers on the improvement within the periods under section 779.06 and until the time for their notices has elapsed, and either none of them gives notice as a lien claimant or all of them have waived in full.",
          "recipients": [
            "The owner or authorized agent"
          ],
          "delivery": "Prepared separately and served, in at least 8-point bold type if printed, or in capital letters if typewritten.",
          "quoteIds": [
            "wi-q1",
            "wi-q2",
            "wi-q3",
            "wi-q4",
            "wi-q5",
            "wi-q6"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "the first labor, services, materials, plans, or specifications are performed, furnished, or procured for the improvement by or pursuant to the authority of the prime contractor"
            }
          ]
        },
        {
          "id": "wi-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character, where the prime contractor is not required to give notice under section 779.02, or where the claimant contracted directly with the owner",
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 60
            }
          },
          "notComputed": null,
          "consequence": "A claimant who fails to give the notice has no lien on the land or improvement to which the failure relates. A claimant who serves a late but otherwise proper notice has the lien for labor, services, materials, plans, or specifications performed, furnished, or procured after the owner actually receives the late notice.",
          "recipients": [
            "The owner or authorized agent, at the last-known post-office address"
          ],
          "delivery": "A written notice, in 2 signed copies, served on the owner or authorized agent.",
          "quoteIds": [
            "wi-q7",
            "wi-q8",
            "wi-q9",
            "wi-q5",
            "wi-q6"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "performing, furnishing, or procuring the first labor, services, materials, plans, or specifications"
            }
          ]
        },
        {
          "id": "wi-preliminary-notice-2",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a prime contractor who has contracted or will contract with any subcontractors, suppliers, or service providers, where a written contract for the work of improvement is entered into, except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character",
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "trigger-not-an-input",
            "note": "Included in any written contract with the owner, with a copy of the written contract provided to the owner"
          },
          "consequence": "A prime contractor required to give the notice who fails to give it does not have the lien unless it pays all its obligations to its subcontractors, suppliers, and service providers on the improvement within the periods under section 779.06 and until the time for their notices has elapsed, and either none of them gives notice as a lien claimant or all of them have waived in full.",
          "recipients": [
            "The owner"
          ],
          "delivery": null,
          "quoteIds": [
            "wi-q1",
            "wi-q3",
            "wi-q4",
            "wi-q5",
            "wi-q6"
          ]
        },
        {
          "id": "wi-preliminary-notice-3",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "Where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wi-q5"
          ]
        },
        {
          "id": "wi-preliminary-notice-4",
          "stage": "preliminary-notice",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a laborer or mechanic employed by any prime contractor or subcontractor",
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wi-q5"
          ]
        },
        {
          "id": "wi-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "At least 30 days before timely filing of the lien claim"
          },
          "consequence": "No lien claim may be filed or action brought on it without the notice, whether or not the claimant was required to give, and gave, a notice under section 779.02.",
          "recipients": [
            "The owner"
          ],
          "delivery": "A written notice of intent to file a lien claim, served on the owner.",
          "quoteIds": [
            "wi-q10",
            "wi-q11"
          ]
        },
        {
          "id": "wi-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "No lien exists, and no action to enforce one may be maintained, unless the claim for the lien is filed within that time in the office of the clerk of circuit court of the county in which the lands affected by the lien lie.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wi-q12"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the lien claimant performed, furnished, or procured the last labor, services, materials, plans, or specifications"
            }
          ]
        },
        {
          "id": "wi-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": [
            "The owner of the property on which the lien is placed"
          ],
          "delivery": null,
          "quoteIds": [
            "wi-q13"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim for lien is filed"
            }
          ]
        },
        {
          "id": "wi-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "years",
              "n": 2
            }
          },
          "notComputed": null,
          "consequence": "No lien exists, and no action to enforce one may be maintained, unless an action is brought and summons and complaint filed within that time.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wi-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the claim for lien is filed"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "The notices of section 779.02(2) are not required where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character.",
          "quoteIds": [
            "wi-q5"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "wi-q14",
            "wi-q15"
          ]
        },
        "rolling": {
          "saturdays": false,
          "sundays": true,
          "holidays": true,
          "appliesTo": "all",
          "quoteIds": [
            "wi-q16",
            "wi-q17"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "January 1",
            "quoteId": "wi-q18",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "3rd Monday in January",
            "quoteId": "wi-q18",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "3rd Monday in February",
            "quoteId": "wi-q18",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Last Monday in May",
            "quoteId": "wi-q18",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "June 19 (Juneteenth Day)",
            "quoteId": "wi-q18",
            "kind": "fixed",
            "month": 6,
            "day": 19,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "July 4",
            "quoteId": "wi-q18",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor day",
            "quoteId": "wi-q18",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "2nd Monday in October",
            "quoteId": "wi-q18",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "November 11",
            "quoteId": "wi-q18",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "4th Thursday in November (Thanksgiving)",
            "quoteId": "wi-q18",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "December 25",
            "quoteId": "wi-q18",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "wi-q17",
          "wi-q18",
          "wi-q19",
          "wi-q20"
        ],
        "conditionalMove": {
          "day": "saturday",
          "condition": "when the act consists of a payment to, a service upon, or a filing with an officer, agent, agency, department or division of the state or of a subdivision of the state whose official office hours do not include that Saturday",
          "unknown": "whether the act at this stage is such a payment, service or filing, or the office hours on that Saturday",
          "quoteIds": [
            "wi-q21"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "the day of holding the partisan primary election",
            "reason": "Wis. Stat. § 995.20 names them without stating their dates"
          },
          {
            "name": "the day of holding the general election in November",
            "reason": "Wis. Stat. § 995.20 names them without stating their dates"
          },
          {
            "name": "a legal public holiday under federal law, or other holiday designated by the president, on which the postal service does not receive registered mail or make regular deliveries",
            "reason": "Wis. Stat. § 990.001(4)(e) counts it as a legal holiday only when an act is permitted to be done by the use of the postal service"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the lien claimant performed, furnished, or procured the last labor, services, materials, plans, or specifications",
          "input": "Last labor, services, materials, plans, or specifications performed, furnished, or procured on",
          "hint": null
        },
        {
          "event": "lien-recorded",
          "clause": "the claim for lien is filed",
          "input": "Claim for lien filed with the clerk of circuit court on",
          "hint": "Leave empty if no claim for lien has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "wi-0",
        "wi-1",
        "wi-2",
        "wi-3"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "WV",
      "name": "West Virginia",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "W. Va. Code ch. 38, art. 2",
      "statuteUrl": "https://web.archive.org/web/20251117192814id_/https://code.wvlegislature.gov/38-2-8/",
      "summary": "West Virginia requires a notice of lien to be recorded within one hundred days after a general contractor completes the work provided for in the contract, a subcontractor completes the subcontract, or a materialman or laborer ceases to furnish materials or equipment or to perform work, and a subcontractor, or a materialman or laborer under a contract with a contractor or subcontractor, also gives the owner a notice of lien within the same one hundred days. Unless an action to enforce the lien is commenced in a circuit court within six months after the notice is filed in the clerk's office, the lien is discharged.",
      "effectiveOrAmended": "Section 38-2-9 as amended by 2006 Enrolled House Bill 4698, sections 38-2-11 and 38-2-13 by 2003 Enrolled Committee Substitute for Senate Bill 387, and sections 38-2-8, 38-2-10 and 38-2-12 by 2002 Enrolled Committee Substitute for Senate Bill 407. Section 2-2-1, which lists the legal holidays and moves a last day, was amended by 2026 Enrolled Senate Bill 793, in effect June 11, 2026.",
      "quotes": [
        {
          "id": "wv-q1",
          "text": "The failure of any person claiming a lien under this article to give such notice as is required by sections nine, eleven and thirteen of this article, or to record such notice as is required by sections eight, nine, ten, eleven, twelve and thirteen of this article, in the manner and within the time specified in such sections, or the failure of any such claimant of any such lien to comply substantially with all of the requirements of this article for the perfecting and preservation of such lien, within the time provided therefor in this article, shall, except as provided in section twenty of this article, operate as a complete discharge of such owner and of such property from all liens for claims and charges of any such contractor, subcontractor, materialman or laborer, for any work claimed to have been performed and for any materials, machinery or other necessary equipment claimed to have been furnished in connection with such work.",
          "citation": "W. Va. Code § 38-2-14",
          "url": "https://web.archive.org/web/20251207221646id_/https://code.wvlegislature.gov/38-2-14/",
          "sourceId": "wv-0",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-07"
        },
        {
          "id": "wv-q2",
          "text": "For the purpose of perfecting and preserving his lien, any such general contractor as is mentioned in section one of this article shall, within one hundred days after the completion of his work provided for in such contract, cause to be recorded, in the office of the clerk of the county court of the county wherein such property is situate, a notice of such lien, which notice shall be sufficient if in form and effect as follows:",
          "citation": "W. Va. Code § 38-2-8",
          "url": "https://web.archive.org/web/20251117192814id_/https://code.wvlegislature.gov/38-2-8/",
          "sourceId": "wv-1",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-17"
        },
        {
          "id": "wv-q3",
          "text": "But the lien shall be discharged and avoided, unless, within one hundred days after the completion of his or her subcontract as aforesaid, the subcontractor shall cause to be recorded in the office of the clerk of the county commission of the county wherein the property is situate, a notice of the lien, which notice shall be sufficient if in form and effect as that provided in section eight of this article.",
          "citation": "W. Va. Code § 38-2-9",
          "url": "https://web.archive.org/web/20251118044727id_/https://code.wvlegislature.gov/38-2-9/",
          "sourceId": "wv-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "wv-q4",
          "text": "Every person, firm or corporation who, under and by virtue of a contract with such general contractor as is mentioned in section one of this article, or with a subcontractor for a part of such work, either for an agreed contract price or by day or by piece, or other basis of payment, shall furnish any part of the materials, machinery or other necessary supplies or equipment, or shall perform any labor, do any work or provide any services necessary to the completion of any general contract, such as is mentioned in section one of this article, shall have such a lien for his or her compensation, as is provided for in section one of this article.",
          "citation": "W. Va. Code § 38-2-2",
          "url": "https://web.archive.org/web/20251113172756id_/https://code.wvlegislature.gov/38-2-2/",
          "sourceId": "wv-3",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-13"
        },
        {
          "id": "wv-q5",
          "text": "For the purpose of perfecting and preserving his lien, every materialman or furnisher of machinery or other necessary equipment, under a contract with the owner, as mentioned in section three of this article, shall cause to be recorded in the office of the clerk of the county court of the county wherein such property is situate, within one hundred days from the date when he shall have ceased to furnish material or machinery or other necessary equipment, a notice of such lien, which notice shall be sufficient if in form and effect as that provided in section eight of this article.",
          "citation": "W. Va. Code § 38-2-10",
          "url": "https://web.archive.org/web/20251212174906id_/https://code.wvlegislature.gov/38-2-10/",
          "sourceId": "wv-4",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-12"
        },
        {
          "id": "wv-q6",
          "text": "The lien shall be discharged and avoided unless, within one hundred days after the materialman or other furnisher of machinery or other necessary equipment ceased to furnish the materials or machinery or other equipment, he or she recorded in the office of the clerk of the county commission of the county wherein the property is situate a notice of the lien.",
          "citation": "W. Va. Code § 38-2-11",
          "url": "https://web.archive.org/web/20251113052420id_/https://code.wvlegislature.gov/38-2-11/",
          "sourceId": "wv-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-13"
        },
        {
          "id": "wv-q7",
          "text": "For the purpose of perfecting and preserving his lien every such workman, artisan, mechanic, laborer or other person as is mentioned in section five of this article who shall have done any work or performed any labor upon any such building or improvement, under a contract with the owner thereof, shall cause to be recorded in the office of the clerk of the county court of the county wherein such property is situate, within one hundred days after he shall have ceased to perform any such work or labor, a notice of his lien, which notice shall be sufficient if in form and effect as that provided in section eight of this article.",
          "citation": "W. Va. Code § 38-2-12",
          "url": "https://web.archive.org/web/20251217034957id_/https://code.wvlegislature.gov/38-2-12/",
          "sourceId": "wv-6",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-17"
        },
        {
          "id": "wv-q8",
          "text": "The lien shall be discharged unless the workman, artisan, mechanic, laborer or other person shall record in the office of the clerk of the county commission wherein the property is situate, within one hundred days after he or she ceased to do work or perform labor upon the building or improvement thereto, a notice of the lien.",
          "citation": "W. Va. Code § 38-2-13",
          "url": "https://web.archive.org/web/20251116024630id_/https://code.wvlegislature.gov/38-2-13/",
          "sourceId": "wv-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-16"
        },
        {
          "id": "wv-q9",
          "text": "For the purpose of perfecting and preserving his or her lien, every subcontractor mentioned in section two of this article shall, within one hundred days after the completion of his or her subcontract, give to the owner or his or her authorized agent, by any of the methods provided by law for the service of a legal notice or summons, a notice of lien, which notice shall be sufficient if in form and effect as follows:",
          "citation": "W. Va. Code § 38-2-9",
          "url": "https://web.archive.org/web/20251118044727id_/https://code.wvlegislature.gov/38-2-9/",
          "sourceId": "wv-2",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-18"
        },
        {
          "id": "wv-q10",
          "text": "For the purpose of perfecting and preserving his or her lien, every materialman or furnisher of machinery or other necessary equipment who has furnished material, machinery or equipment under a contract with any contractor or with any subcontractor, as set forth in section four of this article, within one hundred days after he or she has ceased to furnish the material or machinery or other equipment shall give to the owner or his or her authorized agent, by any of the methods provided by law for the service of a legal notice or summons, a notice of the lien.",
          "citation": "W. Va. Code § 38-2-11",
          "url": "https://web.archive.org/web/20251113052420id_/https://code.wvlegislature.gov/38-2-11/",
          "sourceId": "wv-5",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-13"
        },
        {
          "id": "wv-q11",
          "text": "For the purpose of perfecting and preserving his or her lien, every workman, artisan, mechanic, laborer or other person who has performed any work or labor upon the building or improvement thereto, under a contract with any general contractor or with any subcontractor, as set forth in section six of this article, shall give to the owner, or his or her authorized agent, by any of the methods provided by law for the service of a legal notice or summons within one hundred days after he or she ceased to perform any work or labor a notice of the lien.",
          "citation": "W. Va. Code § 38-2-13",
          "url": "https://web.archive.org/web/20251116024630id_/https://code.wvlegislature.gov/38-2-13/",
          "sourceId": "wv-7",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-16"
        },
        {
          "id": "wv-q12",
          "text": "Unless an action to enforce any lien authorized by this article is commenced in a circuit court within six months after the person desiring to avail himself or herself of the court has filed his or her notice in the clerk's office, as provided in this article, the lien shall be discharged; but an action commenced by any person having a lien shall, for the purpose of preserving the same, inure to the benefit of all other persons having a lien under this article on the same property, and persons may intervene in the action for the purpose of enforcing their liens.",
          "citation": "W. Va. Code § 38-2-34(a)",
          "url": "https://web.archive.org/web/20251113181843id_/https://code.wvlegislature.gov/38-2-34/",
          "sourceId": "wv-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-13"
        },
        {
          "id": "wv-q13",
          "text": "(b) Notwithstanding any provisions of this code to the contrary, beginning on July 1, 2015, it is an affirmative defense, or an affirmative partial defense, as the case may be, in any action to enforce a lien pursuant to this article that the owner is not indebted to the contractor or is indebted to the contractor for less than the amount of the lien sought to be perfected, when: (1) The property is an existing single-family dwelling; (2) The property is a residence constructed by the owner or under a contract entered into by the owner prior to its occupancy as his or her primary residence; or (3) The property is a single-family, owner-occupied dwelling, including a residence constructed and sold for occupancy as a primary residence. This subdivision does not apply to a developer or builder of multiple residences except for the residence that is occupied as the primary residence of the developer or builder.",
          "citation": "W. Va. Code § 38-2-34(b)",
          "url": "https://web.archive.org/web/20251113181843id_/https://code.wvlegislature.gov/38-2-34/",
          "sourceId": "wv-8",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-11-13"
        },
        {
          "id": "wv-q14",
          "text": "In computing any period of time prescribed by any applicable provision of this code or any legislative rule or other administrative rule or regulation promulgated pursuant to the provisions of this code, the day of the act, event, default or omission from which the applicable period begins to run is not included.",
          "citation": "W. Va. Code § 2-2-1(d)",
          "url": "https://web.archive.org/web/20251201094423id_/https://code.wvlegislature.gov/2-2-1/",
          "sourceId": "wv-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-01"
        },
        {
          "id": "wv-q15",
          "text": "The last day of the period so computed is included, unless it is a Saturday, a Sunday, a legal holiday, or a designated day off in which event the prescribed period of time runs until the end of the next day that is not a Saturday, Sunday, legal holiday, or designated day off.",
          "citation": "W. Va. Code § 2-2-1(d)",
          "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
          "sourceId": "wv-10",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wv-q16",
          "text": "(a) The following days are legal holidays: (1) January 1 is \"New Year's Day\"; (2) The third Monday of January is \"Martin Luther King's Birthday\"; (3) The third Monday of February is \"Presidents' Day\"; (4) The last Monday in May is \"Memorial Day\"; (5) June 20 is \"West Virginia Day\"; (6) July 4 is \"Independence Day\"; (7) The first Monday of September is \"Labor Day\"; (8) The second Monday of October is \"Columbus Day\"; (9) November 11 is \"Veterans' Day\"; (10) The fourth Thursday of November is \"Thanksgiving Day\"; (11) The day after Thanksgiving Day is \"Lincoln's Day\"; (12) December 25 is \"Christmas Day\";",
          "citation": "W. Va. Code § 2-2-1(a)",
          "url": "https://web.archive.org/web/20251201094423id_/https://code.wvlegislature.gov/2-2-1/",
          "sourceId": "wv-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-01"
        },
        {
          "id": "wv-q17",
          "text": "(13) Any day on which a general, primary or special election is held is a holiday throughout the state, a political subdivision of the state, a district or an incorporated city, town or village in which the election is conducted; (14) General election day on even years shall be designated Susan B. Anthony Day, in accordance with the provisions of §2-2-1a(b) of this code; and (15) Any day proclaimed or ordered by the Governor as a day of special observance or Thanksgiving, or a day for the general cessation of business, is a holiday.",
          "citation": "W. Va. Code § 2-2-1(a)",
          "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
          "sourceId": "wv-10",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wv-q18",
          "text": "If a holiday otherwise described in subsection (a) of this section falls on a Sunday, then the following Monday is the legal holiday. If a holiday otherwise described in subsection (a) of this section falls on a Saturday, then the preceding Friday is the legal holiday: Provided, That this subsection shall not apply to subdivisions (13), (14), and (15), subsection (a) of this section.",
          "citation": "W. Va. Code § 2-2-1(b)",
          "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
          "sourceId": "wv-10",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wv-q19",
          "text": "Any day or part thereof designated by the Governor as time off, without charge against accrued annual leave, for state employees statewide may also be time off for county employees if the county commission elects to designate the day or part thereof as time off, without charge against accrued annual leave for county employees. Any entire or part statewide day off designated by the Governor may, for all courts, be treated as if it were a legal holiday.",
          "citation": "W. Va. Code § 2-2-1(c)",
          "url": "https://web.archive.org/web/20251201094423id_/https://code.wvlegislature.gov/2-2-1/",
          "sourceId": "wv-9",
          "retrievedAt": "2026-09-30",
          "capturedAt": "2025-12-01"
        },
        {
          "id": "wv-q20",
          "text": "(a) When a proceeding is directed to take place or any act to be done on any particular day of the month or within any period of time prescribed or allowed, including those provided by §55-2-1 et seq. of this code, if that day or the last day falls on a Saturday, Sunday, legal holiday, weather or other emergency day, or day of local significance, the next day that is not a Saturday, Sunday, legal holiday, weather or other emergency day, or day of local significance shall be deemed to be the one intended; and when the day upon which a term of court is directed by law to commence falls on a Saturday, Sunday, legal holiday, weather or other emergency day, or day of local significance, the following day that is not a Saturday, Sunday, legal holiday, weather or other emergency day, or day of local significance shall be deemed to be the day intended.",
          "citation": "W. Va. Code § 2-2-2(a)",
          "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
          "sourceId": "wv-10",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wv-q21",
          "text": "With regard to the courts of this state, the computation of periods of time, the specific dates or days when an act, event, default or omission is required or allowed to occur and the relationship of those time periods and dates to Saturdays, Sundays, legal holidays, or days designated as weather or other emergency days or as days of local significance pursuant to §2-2-2 of this code are governed by rules promulgated by the Supreme Court of Appeals.",
          "citation": "W. Va. Code § 2-2-1(f)",
          "url": "https://www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=sb793%20enr.htm&yr=2026&sesstype=RS&i=793",
          "sourceId": "wv-10",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "wv-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": false,
          "expr": null,
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q1"
          ]
        },
        {
          "id": "wv-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to record the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q2",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the completion of his work provided for in such contract"
            }
          ]
        },
        {
          "id": "wv-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Unless the notice is recorded within that time, the lien is discharged and avoided.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q3",
            "wv-q4"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the completion of his or her subcontract"
            }
          ]
        },
        {
          "id": "wv-lien-filing-2",
          "stage": "lien-filing",
          "roles": [
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a materialman or furnisher of machinery or other necessary equipment under a contract with the owner",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to record the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q5",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the date when he shall have ceased to furnish material or machinery or other necessary equipment"
            }
          ]
        },
        {
          "id": "wv-lien-filing-3",
          "stage": "lien-filing",
          "roles": [
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a materialman or furnisher of machinery or other necessary equipment under a contract with any contractor or with any subcontractor",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Unless the notice is recorded within that time, the lien is discharged and avoided.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q6"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the materialman or other furnisher of machinery or other necessary equipment ceased to furnish the materials or machinery or other equipment"
            }
          ]
        },
        {
          "id": "wv-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a workman, artisan, mechanic, laborer or other person under a contract with the owner",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to record the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q7",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "he shall have ceased to perform any such work or labor"
            }
          ]
        },
        {
          "id": "wv-lien-filing-5",
          "stage": "lien-filing",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a workman, artisan, mechanic, laborer or other person under a contract with any general contractor or with any subcontractor",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Unless the notice is recorded within that time, the lien is discharged.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q8"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "he or she ceased to do work or perform labor upon the building or improvement thereto"
            }
          ]
        },
        {
          "id": "wv-service-0",
          "stage": "service",
          "roles": [
            "sub",
            "subsub"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to give the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": [
            "The owner or his or her authorized agent"
          ],
          "delivery": "By any of the methods provided by law for the service of a legal notice or summons.",
          "quoteIds": [
            "wv-q9",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the completion of his or her subcontract"
            }
          ]
        },
        {
          "id": "wv-service-2",
          "stage": "service",
          "roles": [
            "supplier"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a materialman or furnisher of machinery or other necessary equipment under a contract with any contractor or with any subcontractor",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to give the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": [
            "The owner or his or her authorized agent"
          ],
          "delivery": "By any of the methods provided by law for the service of a legal notice or summons.",
          "quoteIds": [
            "wv-q10",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "he or she has ceased to furnish the material or machinery or other equipment"
            }
          ]
        },
        {
          "id": "wv-service-3",
          "stage": "service",
          "roles": [
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "For a workman, artisan, mechanic, laborer or other person under a contract with any general contractor or with any subcontractor",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 100
            }
          },
          "notComputed": null,
          "consequence": "Failure to give the notice in the manner and within the time specified operates, except as section 38-2-20 provides, as a complete discharge of the owner and the property from the lien.",
          "recipients": [
            "The owner or his or her authorized agent"
          ],
          "delivery": "By any of the methods provided by law for the service of a legal notice or summons.",
          "quoteIds": [
            "wv-q11",
            "wv-q1"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "he or she ceased to perform any work or labor"
            }
          ]
        },
        {
          "id": "wv-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "months",
              "n": 6
            }
          },
          "notComputed": null,
          "consequence": "Unless an action to enforce the lien is commenced in a circuit court within that time, the lien is discharged. An action commenced by any person having a lien inures to the benefit of all other persons having a lien under the article on the same property, who may intervene in it.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wv-q12"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the notice is filed in the clerk's office"
            }
          ]
        }
      ],
      "residential": [
        {
          "text": "Since July 1, 2015, in an action to enforce a lien, it is an affirmative defense, or an affirmative partial defense, that the owner is not indebted to the contractor or owes less than the lien, when the property is an existing single-family dwelling, a residence constructed by the owner or under the owner's contract before its occupancy as the owner's primary residence, or a single-family, owner-occupied dwelling. The last case does not apply to a developer or builder of multiple residences, except for the residence occupied as the developer's or builder's own primary residence.",
          "quoteIds": [
            "wv-q13"
          ]
        }
      ],
      "commencementCompletion": [],
      "residentialDefinition": null,
      "computation": {
        "counting": {
          "rule": "exclude-first-include-last",
          "quoteIds": [
            "wv-q14"
          ]
        },
        "rolling": {
          "saturdays": true,
          "sundays": true,
          "holidays": true,
          "appliesTo": [
            "lien-filing",
            "service"
          ],
          "quoteIds": [
            "wv-q15"
          ]
        },
        "businessDays": null,
        "holidays": [
          {
            "name": "New Year's Day",
            "quoteId": "wv-q16",
            "kind": "fixed",
            "month": 1,
            "day": 1,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Martin Luther King's Birthday",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 1,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Presidents' Day",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 2,
            "weekday": 1,
            "nth": 3,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Memorial Day",
            "quoteId": "wv-q16",
            "kind": "last-weekday",
            "month": 5,
            "weekday": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "West Virginia Day",
            "quoteId": "wv-q16",
            "kind": "fixed",
            "month": 6,
            "day": 20,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Independence Day",
            "quoteId": "wv-q16",
            "kind": "fixed",
            "month": 7,
            "day": 4,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Labor Day",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 9,
            "weekday": 1,
            "nth": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Columbus Day",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 10,
            "weekday": 1,
            "nth": 2,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Veterans' Day",
            "quoteId": "wv-q16",
            "kind": "fixed",
            "month": 11,
            "day": 11,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Thanksgiving Day",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Lincoln's Day",
            "quoteId": "wv-q16",
            "kind": "nth-weekday",
            "month": 11,
            "weekday": 4,
            "nth": 4,
            "offsetDays": 1,
            "datedByStatute": true,
            "modelNote": null
          },
          {
            "name": "Christmas Day",
            "quoteId": "wv-q16",
            "kind": "fixed",
            "month": 12,
            "day": 25,
            "observed": "saturday-to-friday-sunday-to-monday",
            "observedAddsTo": false,
            "datedByStatute": true,
            "modelNote": null
          }
        ],
        "holidaysComplete": false,
        "holidayQuoteIds": [
          "wv-q16",
          "wv-q17",
          "wv-q18",
          "wv-q19",
          "wv-q20"
        ],
        "conditionalMove": {
          "day": "weekend-or-holiday",
          "stages": [
            "enforcement"
          ],
          "condition": "when the rules promulgated by the Supreme Court of Appeals so provide",
          "unknown": "whether the rules of the Supreme Court of Appeals so provide for commencing the action",
          "quoteIds": [
            "wv-q21"
          ]
        },
        "holidaysNotModeled": [
          {
            "name": "any day on which a general, primary or special election is held",
            "reason": "W. Va. Code § 2-2-1(a)(13) makes it a holiday where the election is conducted, without stating its date"
          },
          {
            "name": "any day proclaimed or ordered by the Governor",
            "reason": "W. Va. Code § 2-2-1(a)(15) makes it a holiday without stating its date"
          },
          {
            "name": "a designated day off",
            "reason": "W. Va. Code § 2-2-1(c) and (d) leave it to the Governor to designate, without a date"
          },
          {
            "name": "a weather or other emergency day or day of local significance",
            "reason": "W. Va. Code § 2-2-2(a) moves a last day that falls on one to the next day that is not one, without stating its date"
          }
        ]
      },
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the claimant's contract or subcontract is completed, or the claimant ceases to furnish materials or equipment or to perform work or labor",
          "input": "Contract or subcontract completed, or furnishing or work ceased, on",
          "hint": "For a general contractor, the completion of the work provided for in the contract. For a subcontractor, the completion of the subcontract. For a materialman or a laborer, the day the claimant ceased to furnish material, machinery or equipment, or to perform work or labor."
        },
        {
          "event": "lien-recorded",
          "clause": "the notice of lien is recorded",
          "input": "Notice of lien recorded with the county clerk on",
          "hint": "Leave empty if no notice of lien has been recorded."
        }
      ],
      "confidence": "medium",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "wv-0",
        "wv-1",
        "wv-2",
        "wv-3",
        "wv-4",
        "wv-5",
        "wv-6",
        "wv-7",
        "wv-8",
        "wv-9",
        "wv-10"
      ],
      "openQuestions": null
    },
    {
      "jurisdiction": "WY",
      "name": "Wyoming",
      "status": "verified",
      "releaseBatch": 5,
      "statute": "Wyo. Stat. tit. 29, chs. 1 and 2",
      "statuteUrl": "https://wyoleg.gov/statutes/compress/title29.pdf",
      "summary": "Wyoming requires a contractor to file a lien statement within 150 days, and every other claimant within 120 days, of the earlier of the last day work was performed or materials furnished under contract and substantial completion of the project, after a notice of intention sent to the record owner no later than 20 days before, and an action to foreclose or enforce the lien commenced within 180 days after the lien statement is filed. The contractor sends a preliminary notice before receiving any payment from the owner, and a subcontractor or materialman within 30 days after first providing services or materials.",
      "effectiveOrAmended": null,
      "quotes": [
        {
          "id": "wy-q1",
          "text": "(i) The contractor, subcontractor and materialman shall send written notice to the record owner or his agent, of the right to assert a lien against the property for which services or materials are provided if the contractor, subcontractor or materialman is not paid, and the right of the owner or contractor to obtain a lien waiver upon payment for services or materials. Each subcontractor and materialman shall provide a copy of the written notice to the contractor for which the subcontractor or materialman is providing services or materials;",
          "citation": "W.S. 29-2-112(a)(i)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q2",
          "text": "(ii) Any notice required under this section shall be sent: (A) By the contractor prior to receiving any payment from owner, including advances; (B) By the subcontractor or materialman within thirty (30) days after first providing services or materials to the construction project.",
          "citation": "W.S. 29-2-112(a)(ii)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q3",
          "text": "(iii) Failure to send the notice required under this section within the time specified shall bar the right of a contractor, subcontractor or materialman to assert a lien;",
          "citation": "W.S. 29-2-112(a)(iii)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q4",
          "text": "(iv) The notice required under this section shall be in substantially the same format and contain the same information as the notice contained in W.S. 29-10-101.",
          "citation": "W.S. 29-2-112(a)(iv)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q5",
          "text": "(vi) \"Subcontractor\" means a person, other than a contractor performing work for a contractor or subcontractor under contract;",
          "citation": "W.S. 29-1-201(a)(vi)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q6",
          "text": "Before filing a lien pursuant to this chapter a lien claimant shall send written notice to the record owner or his agent of any claim against real property, a building or an improvement stating the amount of any claim and from whom it is due. The notice shall be sent no later than twenty (20) days prior to filing a lien statement.",
          "citation": "W.S. 29-2-107(a)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q7",
          "text": "(a) Except as provided in subsection (c) of this section, any contractor asserting a lien under this chapter shall file his lien statement within one hundred fifty (150) days and every other person asserting a lien under this chapter shall file within one hundred twenty (120) days: (i) Of the earlier of: (A) After the last day when work was performed or materials furnished under contract; (B) From the date of substantial completion of the project on which work was performed or materials were furnished under contract; or (ii) With respect to a subcontractor, after the last day he performed work at the direction of the contractor or other person authorized to provide direction.",
          "citation": "W.S. 29-2-106(a)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q8",
          "text": "Notice shall be sent by the lien claimant to the last record owner or his agent in the case of a real property lien within thirty (30) days after the lien statement is filed. The notice shall be in substantially the same format and contain the same information as the form of notice specified in W.S. 29-10-103. The notice forms shall be made available and may be obtained at the county clerk's office of each county. Failure to send the notice required under this subsection shall not affect the validity of the lien.",
          "citation": "W.S. 29-1-312(c)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q9",
          "text": "All actions to foreclose or enforce a lien under this chapter shall be commenced within one hundred eighty (180) days after the filing of the lien statement. No lien shall continue to exist except by virtue of the provisions of this chapter for more than one hundred eighty (180) days after the lien is filed unless an action to foreclose the lien is instituted.",
          "citation": "W.S. 29-2-109",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        },
        {
          "id": "wy-q10",
          "text": "The record owner may record a notice of substantial completion of the project in the records of the county clerk in the county where the project is located. If a notice of substantial completion of the project is recorded under this subsection, the date the notice is recorded shall be presumed to be the date of substantial completion of the project. After the notice has been duly recorded, the record owner shall send a copy of the notice within five (5) days to all contractors, subcontractors and materialmen who provided the record owner with preliminary notice pursuant to W.S. 29-2-112. The notice shall not extend the date by which a lien statement shall be filed as may otherwise be provided in this section. The time to file a lien statement by any contractor, subcontractor or materialman shall not be affected if the record owner fails to send the notice of substantial completion of the project.",
          "citation": "W.S. 29-2-106(c)",
          "url": "https://wyoleg.gov/statutes/compress/title29.pdf",
          "sourceId": "wy-0",
          "retrievedAt": "2026-10-03",
          "capturedAt": null
        }
      ],
      "rules": [
        {
          "id": "wy-preliminary-notice-0",
          "stage": "preliminary-notice",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "Before receiving any payment from the owner, including advances"
          },
          "consequence": "Failure to send the notice within the time specified bars the right of a contractor, subcontractor or materialman to assert a lien.",
          "recipients": [
            "The record owner or his agent"
          ],
          "delivery": "Written notice, in substantially the same format and with the same information as the notice in W.S. 29-10-101.",
          "quoteIds": [
            "wy-q1",
            "wy-q2",
            "wy-q3",
            "wy-q4"
          ]
        },
        {
          "id": "wy-preliminary-notice-1",
          "stage": "preliminary-notice",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "first-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Failure to send the notice within the time specified bars the right of a contractor, subcontractor or materialman to assert a lien.",
          "recipients": [
            "The record owner or his agent",
            "A copy to the contractor for which the subcontractor or materialman is providing services or materials"
          ],
          "delivery": "Written notice, in substantially the same format and with the same information as the notice in W.S. 29-10-101.",
          "quoteIds": [
            "wy-q1",
            "wy-q2",
            "wy-q3",
            "wy-q4",
            "wy-q5"
          ],
          "eventWording": [
            {
              "event": "first-furnishing",
              "clause": "first providing services or materials to the construction project"
            }
          ]
        },
        {
          "id": "wy-notice-of-intent-0",
          "stage": "notice-of-intent",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": true,
          "expr": null,
          "notComputed": {
            "reason": "counted-back-from-an-action",
            "note": "No later than twenty (20) days prior to filing a lien statement"
          },
          "consequence": null,
          "recipients": [
            "The record owner or his agent"
          ],
          "delivery": "Written notice of the claim, stating its amount and from whom it is due.",
          "quoteIds": [
            "wy-q6"
          ]
        },
        {
          "id": "wy-lien-filing-0",
          "stage": "lien-filing",
          "roles": [
            "direct"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 150
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 150
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wy-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day when work was performed or materials furnished under contract"
            },
            {
              "event": "completion",
              "clause": "the date of substantial completion of the project"
            }
          ]
        },
        {
          "id": "wy-lien-filing-1",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "earlier-of",
            "of": [
              {
                "kind": "period",
                "anchor": {
                  "event": "last-furnishing"
                },
                "period": {
                  "unit": "days",
                  "n": 120
                }
              },
              {
                "kind": "period",
                "anchor": {
                  "event": "completion"
                },
                "period": {
                  "unit": "days",
                  "n": 120
                }
              }
            ]
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wy-q7"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day when work was performed or materials furnished under contract"
            },
            {
              "event": "completion",
              "clause": "the date of substantial completion of the project"
            }
          ]
        },
        {
          "id": "wy-lien-filing-4",
          "stage": "lien-filing",
          "roles": [
            "sub",
            "subsub",
            "laborer"
          ],
          "projectType": "any",
          "branch": "other",
          "branchNote": "With respect to a subcontractor",
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "last-furnishing"
            },
            "period": {
              "unit": "days",
              "n": 120
            }
          },
          "notComputed": null,
          "consequence": null,
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wy-q7",
            "wy-q5"
          ],
          "eventWording": [
            {
              "event": "last-furnishing",
              "clause": "the last day he performed work at the direction of the contractor or other person authorized to provide direction"
            }
          ]
        },
        {
          "id": "wy-service-0",
          "stage": "service",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 30
            }
          },
          "notComputed": null,
          "consequence": "Failure to send the notice does not affect the validity of the lien.",
          "recipients": [
            "The last record owner or his agent"
          ],
          "delivery": "In substantially the same format, and with the same information, as the form of notice in W.S. 29-10-103.",
          "quoteIds": [
            "wy-q8"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien statement is filed"
            }
          ]
        },
        {
          "id": "wy-enforcement-0",
          "stage": "enforcement",
          "roles": [
            "direct",
            "sub",
            "subsub",
            "supplier",
            "laborer"
          ],
          "projectType": "any",
          "branch": "default",
          "branchNote": null,
          "required": null,
          "expr": {
            "kind": "period",
            "anchor": {
              "event": "lien-recorded"
            },
            "period": {
              "unit": "days",
              "n": 180
            }
          },
          "notComputed": null,
          "consequence": "No lien continues to exist under the chapter for more than 180 days after it is filed unless an action to foreclose the lien is instituted.",
          "recipients": null,
          "delivery": null,
          "quoteIds": [
            "wy-q9"
          ],
          "eventWording": [
            {
              "event": "lien-recorded",
              "clause": "the lien statement is filed"
            }
          ]
        }
      ],
      "residential": [],
      "commencementCompletion": [
        {
          "text": "The record owner may record a notice of substantial completion of the project with the county clerk. The date it is recorded is presumed to be the date of substantial completion, and the record owner sends a copy within five days to every contractor, subcontractor and materialman who gave the owner a preliminary notice. The notice does not extend the time to file a lien statement, and that time is not affected if the record owner fails to send the copy.",
          "quoteIds": [
            "wy-q10"
          ]
        }
      ],
      "residentialDefinition": null,
      "computation": null,
      "eventWording": [
        {
          "event": "last-furnishing",
          "clause": "the last day when work was performed or materials furnished under contract",
          "input": "Last day work was performed or materials furnished under contract",
          "hint": null
        },
        {
          "event": "completion",
          "clause": "the date of substantial completion of the project",
          "input": "Substantial completion of the project on",
          "hint": "If the record owner recorded a notice of substantial completion of the project, the date it was recorded is presumed to be the date of substantial completion."
        },
        {
          "event": "lien-recorded",
          "clause": "the lien statement is filed",
          "input": "Lien statement filed with the county clerk on",
          "hint": "Leave empty if no lien statement has been filed."
        }
      ],
      "confidence": "high",
      "verified": true,
      "verifiedAt": "2026-10-03",
      "publishable": true,
      "sourceIds": [
        "wy-0"
      ],
      "openQuestions": null
    }
  ]
}
