Dataset · 51 jurisdictions

Mechanics lien deadlines by state

By Sami Chicha, EditorUpdated Checked against primary sources · not yet reviewed by a licensed professional

Of the 51 jurisdictions, 48 are published with what their statutes say about the preliminary notice, the lien filing and the deadline to sue, and 3 are listed as not yet verified. Each line in a cell is one rule with its statute; a rule limited to some roles or to one project type names them, and a rule that turns on a condition names the condition. A row marked not yet verified says nothing about that state's law.

What this table shows · as of 2026-10-03

Each row is one jurisdiction: what its statute says about the preliminary notice, the lien filing and the deadline to sue, one line per rule with its statute. The 48 published rows are in the downloads; the other 3 are listed as not yet verified, with nothing else.

All 51 jurisdictions

Mechanics lien deadlines by state: preliminary notice, lien filing and deadline to sue, with the statute
StatePreliminary noticeLien filingDeadline to suePageVerified
Alabama
  • Direct contractor: 6 months after the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished (Ala. Code § 35-11-215)
  • For every journeyman and day laborer: Laborer: 30 days after the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished (Ala. Code § 35-11-215)
  • Subcontractor, Sub-subcontractor, Supplier: 4 months after the last item of work or labor has been performed or the last item of any material, fixture, engine, boiler, or machinery has been furnished (Ala. Code § 35-11-215)
  • Six months after the maturity of the entire indebtedness secured by the lien, except as otherwise provided in the division (Ala. Code § 35-11-221)
State page2026-10-03
Alaska
  • If a notice of completion is not recorded by the owner as provided in AS 34.35.071: 120 days after the claimant completes the construction contract or ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property (AS 34.35.068(a); AS 34.35.068(c))
  • If a notice of completion is recorded by the owner, for a claimant who has received advance notification of the date it is recorded or who has not given a notice of right to lien, to record a claim of lien or a notice of right to lien: 15 days after a notice of completion is recorded (AS 34.35.068(b); AS 34.35.068(c))
  • If a notice of completion is recorded by the owner, for a claimant who records a notice of right to lien before or within that 15-day period, or who has given a notice of right to lien but has not received advance notice of the date the notice of completion is recorded: 120 days after the claimant completes the construction contract or ceases to furnish labor, material, services, or equipment for the construction, alteration, or repair of the owner's property (AS 34.35.068(b); AS 34.35.068(a); AS 34.35.068(c))
State page2026-10-03
Arizona
Other rules (1)
State page2026-10-03
ArkansasState page2026-10-02
CaliforniaState page2026-10-01
Colorado
  • Direct contractor, Subcontractor, Sub-subcontractor, Supplier: 4 months after the day on which the last labor is performed or the last laborers or materials are furnished by the lien claimant (C.R.S. § 38-22-109(5))
  • For labor and work by the day or piece, without furnishing laborers or materials: Laborer: 2 months after the completion of the building, structure, or other improvement (C.R.S. § 38-22-109(4))
  • Where the claimant files a notice under subsection (10) within the time in subsections (4) and (5): Four months after completion of the structure or other improvement or six months after the date of filing of the notice, whichever occurs first (C.R.S. § 38-22-109(10))
  • Six months after the last work or labor is performed, or laborers or materials are furnished, or after the completion of the building, structure, or other improvement, or the completion of the alteration, addition to, or repair thereof, as section 38-22-109 prescribes (C.R.S. § 38-22-110)
State page2026-10-02
Connecticut
  • Except for a subcontractor whose contract with the original contractor is in writing and has been assented to in writing by the other party to the original contract: Subcontractor, Sub-subcontractor, Supplier, Laborer: 90 days after the person ceases to furnish materials or render services (Conn. Gen. Stat. § 49-35(a))
  • Direct contractor: None required (Conn. Gen. Stat. § 49-35(a))
State page2026-10-02
Delaware
  • For a contractor that made its contract directly with the owner or reputed owner and furnished both labor and material for the structure, or provided construction management services in connection with them: Direct contractor: 180 days after the structure is completed (25 Del. C. § 2711(a)(1); 25 Del. C. § 2711(a)(2))
  • For all other persons, apart from the contractor described in 25 Del. C. § 2711(a): 120 days after the claimant's labor was completed or its last materials were delivered (25 Del. C. § 2711(b))
  • For labor of less than $100, where the claim is filed with a justice of the peace under subchapter III: Direct contractor, Subcontractor, Sub-subcontractor, Laborer: Only after 20 days from the claimant's last labor have expired, and within 10 days after that (25 Del. C. § 2731; 25 Del. C. § 2732)
  • The statement of claim, filed within the time set for it, may also serve as the complaint. The proceedings to recover the amount of the claim are by writ of scire facias (25 Del. C. § 2712(a); 25 Del. C. § 2714(a))
Other rules (1)
  • For a claim for labor of less than $100 filed with a justice of the peace under subchapter III: Direct contractor, Subcontractor, Sub-subcontractor, Laborer: The transcript and judgment become a lien on the structure when entered in the Superior Court within 2 days from the date of the judgment (25 Del. C. § 2735)
State page2026-10-02
District of Columbia
  • Direct contractor: During the construction or within 90 days after the earlier of the completion or termination of the project (D.C. Code § 40-301.02(a)(1))
  • For a subcontractor, materialman or laborer directly employed by the original contractor: Subcontractor, Supplier, Laborer: During the construction or within 90 days after the earlier of the completion or termination of the project (D.C. Code § 40-301.02(a)(1); D.C. Code § 40-303.01)
State page2026-10-02
Florida
Other rules (1)
  • In every case, as an outer limit: Subcontractor, Sub-subcontractor, Supplier: Before the owner disburses the final payment after the contractor has furnished its final payment affidavit. (Fla. Stat. § 713.06(2)(a))
Other rules (1)
  • If the original contract is terminated under section 713.07(4): The earlier of 90 days after the termination and 90 days after the lienor's final furnishing. (Fla. Stat. § 713.08(5))
  • 1 year after the claim of lien, or an amended claim of lien that shows a later date of final furnishing of labor, services, or materials, is recorded (Fla. Stat. § 713.22(1))
Other rules (1)
  • After the owner serves a notice of contest of lien: 60 days after service of the owner's notice of contest of lien. (Fla. Stat. § 713.22(2))
State page2026-10-03
Georgia
Other rules (1)
Other rules (1)
  • After the owner or the contractor records a notice of contest of lien: 60 days from receipt of the notice of contest of lien. (O.C.G.A. § 44-14-368(a))
State page2026-10-01
Hawaii
  • Where a notice that the improvement has been completed or abandoned is published and its affidavit of publication is filed: 45 days after publication of a notice that the improvement has been completed or abandoned is complete and the affidavit of publication is filed (Haw. Rev. Stat. § 507-43(a); Haw. Rev. Stat. § 507-43(b); Haw. Rev. Stat. § 507-43(f))
  • If a valid notice of completion is not published and filed within one year after the actual completion or abandonment of the improvement: 45 days after the date one year after the actual completion or abandonment of the improvement (Haw. Rev. Stat. § 507-43(b); Haw. Rev. Stat. § 507-43(g))
  • Where title to the property is registered in the land court and the lien is not claimed solely against the lessees' interest in one or more leasehold time share interests: A certified copy of the Order Directing Lien To Attach filed in the office of the assistant registrar of the land court within seven days after the order is entered (Haw. Rev. Stat. § 507-43(b))
State page2026-10-02
IdahoState page2026-10-02
Illinois
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: Within 90 days after the claimant's own contract is completed, or after completion of extra or additional work or final delivery of extra or additional material. (770 ILCS 60/24(a))
Other rules (1)
  • For work on an existing owner-occupied single family residence: Subcontractor, Sub-subcontractor, Supplier, Laborer: 60 days after first furnishing (770 ILCS 60/21(c))
  • Against or to the prejudice of any other creditor or incumbrancer or purchaser: Direct contractor: 4 months after completion, or the completion of extra or additional work or the final delivery of extra or additional labor, services, material, fixtures, apparatus or machinery, forms or form work, occurs (770 ILCS 60/7(a))
  • As to the owner: Direct contractor: 2 years after the contract, or any extra work, is completed, or any extra labor, services, material, fixtures, apparatus or machinery, forms or form work is furnished under it (770 ILCS 60/7(a))
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20. (770 ILCS 60/28)
  • Direct contractor: 2 years after the contract, or the extra or additional work, is completed, or extra or additional material is furnished under it (770 ILCS 60/9)
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: Within the same limits as to time the statute provides for the contractor in Section 7 and Sections 9 to 20. (770 ILCS 60/28; 770 ILCS 60/9)
Other rules (1)
  • After a written demand of the owner, lienor, a recorder under Section 3-5010.8 of the Counties Code, or any person interested in the real estate, or their agent or attorney, requiring suit to be commenced or answer to be filed in a pending suit: Suit commenced, or answer filed in a pending suit, within 30 days after the demand is served. (770 ILCS 60/34(a))
State page2026-10-03
Indiana
Other rules (1)
Other rules (2)
State page2026-10-02
Iowa
Other rules (1)
Other rules (1)
  • For the owner to stay liable to the subcontractor for the full value despite payment to the general contractor or owner-builder, except as provided in section 572.13B: Subcontractor, Sub-subcontractor, Supplier, Laborer: 90 days after the last of the materials was furnished or the last of the labor was performed (Iowa Code § 572.14)
  • Within two years from the expiration of ninety days after the date on which the last of the material was furnished or the last of the labor was performed (Iowa Code § 572.27)
Other rules (1)
  • Upon the written demand of the owner served on the claimant requiring the claimant to commence action to enforce the lien: Within thirty days after the demand is served (Iowa Code § 572.28(1))
State page2026-10-02
Kansas
  • For the improvement of residential property as K.S.A. 60-1103a defines it, where the claimant’s total claim exceeds $250: Subcontractor, Sub-subcontractor, Supplier, Laborer: Mailed before the lien is claimed under K.S.A. 60-1103 (K.S.A. 60-1103a(b); K.S.A. 60-1103a(a); K.S.A. 60-1103a(d))
  • For the construction of new residential property, for a lien claimed after title passes to a good faith purchaser for value: Filed before the recording of the deed effecting passage of title to the new residential property (K.S.A. 60-1103b(b); K.S.A. 60-1103b(a); K.S.A. 60-1103b(f))
  • Direct contractor: 4 months after material, equipment or supplies, used or consumed was last furnished or last labor performed under the contract (K.S.A. 60-1102(a))
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: 3 months after supplies, material or equipment was last furnished or labor performed by the claimant (K.S.A. 60-1103(a))
Other rules (2)
  • If the claimant has filed a notice of extension within four months since last furnishing labor, equipment, materials or supplies to the job site: Other than residential: Direct contractor: Within five months (K.S.A. 60-1102(c))
  • If the claimant has filed a notice of extension within three months since last furnishing labor, equipment, materials or supplies to the job site: Other than residential: Subcontractor, Sub-subcontractor, Supplier, Laborer: Within five months (K.S.A. 60-1103(e))
State page2026-10-02
KentuckyNot yet verified
Louisiana
  • 60 days after the work is substantially completed or abandoned, if a notice of termination is not filed (La. R.S. 9:4822(A))
Other rules (7)
  • If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811: Subcontractor, Sub-subcontractor, Supplier, Laborer: 6 months after the work is substantially completed or abandoned, if a notice of termination is not filed (La. R.S. 9:4822(B))
  • For a general contractor whose privilege has been preserved in the manner provided by R.S. 9:4811: Direct contractor: 7 months after the work is substantially completed or abandoned, if a notice of termination is not filed (La. R.S. 9:4822(C))
  • If, before the period of Subsection A expires and at least ten days before filing the statement of claim or privilege, notice of nonpayment is given to the owner in connection with a residential work for which a timely notice of contract was not filed: Subcontractor, Sub-subcontractor, Supplier, Laborer: 70 days after the work is substantially completed or abandoned, if a notice of termination is not filed (La. R.S. 9:4822(D))
  • If a notice of termination of the work is filed: 60 days after a notice of termination of the work is filed (La. R.S. 9:4822(A))
  • If a notice of contract is properly and timely filed in the manner provided by R.S. 9:4811: Subcontractor, Sub-subcontractor, Supplier, Laborer: 30 days after a notice of termination of the work is filed (La. R.S. 9:4822(B))
  • For a general contractor whose privilege has been preserved in the manner provided by R.S. 9:4811: Direct contractor: 60 days after a notice of termination of the work is filed (La. R.S. 9:4822(C))
  • If, before the period of Subsection A expires and at least ten days before filing the statement of claim or privilege, notice of nonpayment is given to the owner in connection with a residential work for which a timely notice of contract was not filed: Subcontractor, Sub-subcontractor, Supplier, Laborer: 70 days after a notice of termination of the work is filed (La. R.S. 9:4822(D))
State page2026-10-02
MaineState page2026-10-02
MarylandState page2026-10-02
Massachusetts
  • Direct contractor: the earlier of 60 days after a notice of substantial completion is filed or recorded and 90 days after such person or any person by, through or under him last performed or furnished labor or materials or both labor and materials (Mass. Gen. Laws ch. 254, § 2)
  • Subcontractor, Sub-subcontractor, Supplier: the earlier of 60 days after a notice of substantial completion is filed or recorded and 90 days after the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services (Mass. Gen. Laws ch. 254, § 4)
  • Direct contractor, Subcontractor, Sub-subcontractor, Supplier: the earlier of 90 days after a notice of substantial completion is filed or recorded and 120 days after the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or material or both labor and materials or furnished rental equipment, appliances or tools (Mass. Gen. Laws ch. 254, § 8)
  • For a lien under section 1 for personal labor performed by virtue of an agreement with, or by consent of, the owner or a person having authority from or rightfully acting for the owner: Laborer: A statement filed or recorded within the ninety days provided in section 1, for not more than thirty days of work actually performed in the ninety days before it is filed (Mass. Gen. Laws ch. 254, § 1; Mass. Gen. Laws ch. 254, § 8)
  • For a person who furnishes labor under a written contract with a contractor, or with a subcontractor of such contractor, and files a notice of contract under section 4: Laborer: the earlier of 60 days after a notice of substantial completion is filed or recorded and 90 days after the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or materials or both labor and materials to the project or furnished rental equipment, appliances or tools, or performed professional services (Mass. Gen. Laws ch. 254, § 4)
  • For a person who furnishes labor under a written contract with a contractor, or with a subcontractor of such contractor, and has a lien under section 4: Laborer: the earlier of 90 days after a notice of substantial completion is filed or recorded and 120 days after the last day a person who may enforce a lien under section two, or anyone claiming by, through or under him, performed or furnished labor or material or both labor and materials or furnished rental equipment, appliances or tools (Mass. Gen. Laws ch. 254, § 4; Mass. Gen. Laws ch. 254, § 8)
Other rules (1)
  • Once a civil action to enforce the lien is commenced: An attested copy of the complaint filed in the registry of deeds within thirty days of the commencement of the action (Mass. Gen. Laws ch. 254, § 5)
State page2026-10-02
Michigan
  • 90 days after the lien claimant last furnished labor or material for the improvement, pursuant to the lien claimant's contract (Mich. Comp. Laws § 570.1111(1))
State page2026-10-02
MinnesotaState page2026-10-02
Mississippi
  • For a person who does not have privity of contract with the contractor, or, if there is no contractor, with the owner, except on single-family residential construction: Sub-subcontractor, Supplier: 30 days after the first delivery of labor, services or materials to the property (Miss. Code Ann. § 85-7-407(2); Miss. Code Ann. § 85-7-407(4))
State page2026-10-02
Missouri
  • Direct contractor: Prior to receiving payment in any form of any kind from the person with whom the contract is made, or the owner if there is no contract, (a) either at the time of the execution of the contract, (b) when the materials are delivered, (c) when the work is commenced, or (d) delivered with first invoice (Mo. Rev. Stat. § 429.012.1; Mo. Rev. Stat. § 429.012.2)
  • For a mechanic's lien asserted against residential real property, as section 429.016 defines it, other than a lien for the repair, remodeling, or addition to owner-occupied residential property of four units or less, where the owner has recorded a notice of intended sale: A notice of rights recorded not less than five calendar days prior to the intended date of closing stated in a notice of intended sale (Mo. Rev. Stat. § 429.016.1; Mo. Rev. Stat. § 429.016.3; Mo. Rev. Stat. § 429.016.6; Mo. Rev. Stat. § 429.016.11(1))
Other rules (1)
  • For new residences for which the buyer has been furnished coverage against mechanics' and suppliers' liens through a title insurance company registered in the state of Missouri: Direct contractor: None required (Mo. Rev. Stat. § 429.012.4)
State page2026-10-02
Montana
Other rules (3)
  • When payment is made by or on behalf of the contracting owner from funds provided by a regulated lender and secured by an interest, lien, mortgage, or encumbrance for the purpose of paying the particular real estate improvement being liened, excluding a contract on an owner-occupied residence: Subcontractor, Sub-subcontractor, Supplier: 45 days after the services or materials are first furnished to the contracting owner (Mont. Code Ann. § 71-3-531(4); Mont. Code Ann. § 71-3-531(5))
  • Where the real estate improvement contract relates to a dwelling for five or more families or to an improvement described in § 71-3-531(1)(d): Subcontractor, Sub-subcontractor, Supplier: None required (Mont. Code Ann. § 71-3-531(1))
  • If a notice of the right to claim a lien is required under § 71-3-531, a copy of the notice filed with the county clerk and recorder: Subcontractor, Sub-subcontractor, Supplier: Not later than 5 business days after the date on which the notice of the right to claim a lien is given to the contracting owner (Mont. Code Ann. § 71-3-531(6)(a); Mont. Code Ann. § 71-3-531(6)(e))
Other rules (1)
State page2026-10-02
Nebraska
Other rules (1)
  • If an owner, holder of a security interest, or other person having an interest in the real estate gives the claimant written demand to institute a judicial proceeding within thirty days: Within thirty days after receipt of the written demand (Neb. Rev. Stat. § 52-140(2))
State page2026-10-02
Nevada
  • 90 days after the completion of the work of improvement or after the lien claimant's last delivery of material, furnishing of equipment or performance of work for the work of improvement, whichever is later (NRS 108.226(1); NRS 108.226(6))
Other rules (1)
State page2026-10-02
New Hampshire
Other rules (1)
  • An account in writing, for any person giving notice as provided in RSA 447:5-7: Subcontractor, Sub-subcontractor, Supplier, Laborer: As often as once in 30 days (N.H. Rev. Stat. Ann. § 447:8)
State page2026-10-02
New JerseyNot yet verified
New Mexico
Other rules (1)
  • Direct contractor: Within one hundred twenty days after the completion of a contract (N.M. Stat. Ann. § 48-2-6(A))
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: 90 days after the completion of the building, improvement or structure or of its alteration or repair (N.M. Stat. Ann. § 48-2-6(A))
State page2026-10-02
New York
Other rules (1)
  • For a notice of lien for retainage: 90 days after the date the retainage was due to be released. (N.Y. Lien Law § 10(1))
State page2026-10-03
North CarolinaState page2026-10-01
North Dakota
Other rules (1)
  • For the seller, when material is furnished for an original, complete, and independent building, structure, or improvement: Direct contractor, Subcontractor, Sub-subcontractor, Supplier: At the time the material is furnished for such improvement (N.D.C.C. § 35-27-21)
Other rules (1)
  • Upon written demand by or on behalf of the owner, delivered to the lienor and filed with the county recorder: Within thirty days after the date of delivery of the demand (N.D.C.C. § 35-27-25)
State page2026-10-02
Ohio
Other rules (1)
Other rules (1)
Other rules (1)
  • After a notice to commence suit, given by the owner, part owner, lessee, mortgagee or another person with an interest in the real property, or by an original contractor or subcontractor who has provided a bond or other reasonable security, is served: 60 days after service of the notice to commence suit is completed (Ohio Rev. Code § 1311.11(A)(1); Ohio Rev. Code § 1311.11(B))
State page2026-10-03
Oklahoma
Other rules (1)
  • For a claimant whose claim relates to a residential project, a single family or multifamily project of four or fewer dwelling units, none of which are occupied by an owner, or whose aggregate claim is less than Ten Thousand Dollars ($10,000.00), except for a lien affecting property then occupied as a dwelling by an owner: Subcontractor, Sub-subcontractor, Supplier, Laborer: None required (42 O.S. § 142.6(B)(3); 42 O.S. § 142.6(B)(1))
  • Direct contractor: 4 months after the date upon which material or equipment used on said land was last furnished or labor last performed under contract (42 O.S. § 142)
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: 90 days after the date upon which material or equipment used on said land was last furnished or labor last performed under such subcontract (42 O.S. § 143)
State page2026-10-02
Oregon
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: At any time during the progress of the improvement, for materials, equipment and labor or services provided after a date which is eight days, not including Saturdays, Sundays and other holidays, before the notice is delivered or mailed (ORS 87.021(1); ORS 87.021(3)(a); ORS 87.018(1))
  • Direct contractor: None required (ORS 87.021(1))
Other rules (3)
  • For a lien for materials or supplies to have priority over a recorded mortgage or trust deed on either the land or improvement: Direct contractor, Subcontractor, Sub-subcontractor, Supplier: Not later than eight days, not including Saturdays, Sundays and other holidays as defined in ORS 187.010, after the date of delivery of material or supplies (ORS 87.025(3))
  • For a person who performs labor upon a commercial improvement, provides labor and material for a commercial improvement, or rents equipment used in the construction of a commercial improvement: Subcontractor, Sub-subcontractor, Supplier, Laborer: None required (ORS 87.021(3)(b))
  • For a residential construction or improvement contract for which the aggregate contract price exceeds $2,000, unless the owner is a contractor licensed with the Construction Contractors Board under ORS chapter 701: Direct contractor: At the time of signing a residential construction or improvement contract with the owner (ORS 87.093(2); ORS 87.093(4); ORS 87.093(5); ORS 87.093(3); ORS 87.093(6))
  • 120 days after the claim of lien is filed (ORS 87.055)
State page2026-10-02
PennsylvaniaNot yet verified
Rhode Island
Other rules (2)
  • For the lien of any architect or engineer, or of any immediate or mediate subcontractor thereto, for work done in connection with the construction, erection, alteration, or reparation, the result of which is used therein: Direct contractor, Subcontractor, Sub-subcontractor: Before the later of two hundred (200) days of the performance of the work or ten (10) days after the actual and visible commencement, by excavation or otherwise, of the construction, erection, alteration or reparation (R.I. Gen. Laws § 34-28-7)
  • If the mailed notice of intention is returned to the person mailing it, not having been delivered for any reason: Within thirty (30) days after the return of the notice of intention, and in no event more than two hundred (200) days after the mailing of the notice (R.I. Gen. Laws § 34-28-4(a))
State page2026-10-02
South Carolina
Other rules (2)
  • Where a notice of project commencement is filed, for a notice of furnishing labor or materials sent to the contractor: Sub-subcontractor, Supplier: None required (S.C. Code § 29-5-20(B); S.C. Code § 29-5-23)
  • For a written notice to the owner of the furnishing of labor or material and its amount or value, where the work is done or material furnished upon the employment of a contractor or some other person than the owner: Subcontractor, Sub-subcontractor, Supplier, Laborer: None required (S.C. Code § 29-5-40)
  • 90 days after the person ceases to labor on or furnish labor or materials for the building or structure (S.C. Code § 29-5-90)
  • 6 months after the person ceases to labor on or furnish labor or material for the building or structure (S.C. Code § 29-5-120(A))
State page2026-10-02
South Dakota
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: None required (SDCL 44-9-10)
Other rules (1)
  • If a notice of project commencement is filed and posted under §§ 44-9-50 and 44-9-51, for a sub-subcontractor or a supplier to subcontractors, other than an individual laborer whose lien is less than two thousand dollars: Sub-subcontractor, Supplier, Laborer: 60 days after doing the last of such work, or furnishing the last item of such skill, services, material, or machinery (SDCL 44-9-53)
  • 120 days after doing the last of such work, or furnishing the last item of such skill, services, material, or machinery (SDCL 44-9-15)
  • Within six years after the date of the last item of the lien holder's claim as set forth in the filed and entered lien statement (SDCL 44-9-24)
Other rules (1)
  • Upon written demand by the owner, the owner's agent, or contractor, served on the person holding the lien, requiring the person to commence suit to enforce it: Within thirty days after such service (SDCL 44-9-26)
State page2026-10-03
Tennessee
  • For a remote contractor on an improvement other than one-family, two-family, three-family and four-family residential units, if its account is, in fact, unpaid: Subcontractor, Sub-subcontractor, Supplier, Laborer: Within ninety (90) days of the last day of each month within which work or labor was provided or materials, services, equipment, or machinery furnished (Tenn. Code Ann. § 66-11-145(a); Tenn. Code Ann. § 66-11-145(b))
  • For a contractor about to enter into a contract with the owner for improving residential real property, as § 66-11-146 defines that term: Direct contractor: Prior to commencing the improvement of the residential real property or making of the contract (Tenn. Code Ann. § 66-11-203)
Other rules (3)
State page2026-10-03
Texas
  • Other than residential: Subcontractor, Sub-subcontractor, Supplier, Laborer: Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the third month after that month. (Tex. Prop. Code § 53.056(a); Tex. Prop. Code § 53.056(a-1)(1))
  • Residential: Subcontractor, Sub-subcontractor, Supplier, Laborer: Due for each month in which labor or materials were provided or undelivered specially fabricated materials would normally have been delivered: the 15th day of the second month after that month. (Tex. Prop. Code § 53.056(a-1)(2); Tex. Prop. Code § 53.056(a))
Other rules (1)
  • For a claim for unpaid retainage: Subcontractor, Sub-subcontractor, Supplier: The earlier of the 30th day after the claimant's contract is completed, terminated or abandoned and the 30th day after the original contract is terminated or abandoned. (Tex. Prop. Code § 53.057(a-1))
  • Other than residential: Direct contractor: the 15th day of the 4th month after the month in which the original contractor's work was completed, terminated, or abandoned (Tex. Prop. Code § 53.052(a)(1))
  • Residential: Direct contractor: the 15th day of the 3rd month after the month in which the original contractor's work was completed, terminated, or abandoned (Tex. Prop. Code § 53.052(a)(2))
  • Other than residential: Subcontractor, Sub-subcontractor, Supplier, Laborer: the 15th day of the 4th month after the month in which the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later (Tex. Prop. Code § 53.052(b))
  • Residential: Subcontractor, Sub-subcontractor, Supplier, Laborer: the 15th day of the 3rd month after the month in which the claimant last provided labor or materials or would normally have been required to deliver the last of specially fabricated materials that have not been actually delivered, whichever is later (Tex. Prop. Code § 53.052(c))
Other rules (1)
  • For a lien claim for retainage: Subcontractor, Sub-subcontractor, Supplier: the 15th day of the 3rd month after the month in which the original contract under which the claimant performed was completed, terminated, or abandoned (Tex. Prop. Code § 53.052(d))
State page2026-10-02
Utah
  • the earlier of 180 days after final completion of the original contract occurs and 90 days after a notice of completion is filed (Utah Code § 38-1a-502(1)(a))
Other rules (1)
  • For a subcontractor who provides substantial work after a certificate of occupancy is issued or a required final inspection is completed: Subcontractor: No later than 180 days after final completion of that subcontractor's work (Utah Code § 38-1a-502(1)(b))
State page2026-10-03
Vermont
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: Written notice to the owner or the owner's agent having charge of the property, with no period stated (9 V.S.A. § 1921(b))
  • Direct contractor: None required (9 V.S.A. § 1921(a))
  • If payment is due at the time the memorandum is filed: 180 days after the memorandum is filed (9 V.S.A. § 1924)
  • If payment is not due at the time the memorandum is filed: Within 180 days from the time such payment becomes due (9 V.S.A. § 1924)
State page2026-10-03
Virginia
  • Where the building permit names a mechanics' lien agent, except for a lien claimed under subsection B of § 43-3 or a memorandum of lien recorded before the permit is issued: Residential: 30 days after the first date that he performs labor or furnishes material to or for the building or structure (Va. Code § 43-4.01(C); Va. Code § 43-4.01(B))
  • For a subcontractor, which includes contractors, laborers, mechanics and persons furnishing materials who contract with the general contractor and not with the owner: Subcontractor, Supplier, Laborer: In addition to complying with § 43-4, with no period stated (Va. Code § 43-7(A); Va. Code § 43-1)
  • For a person performing labor or furnishing materials for a subcontractor: Sub-subcontractor, Supplier, Laborer: In addition to complying with § 43-4, with no period stated (Va. Code § 43-9)
  • Not later than 90 days from the last day of the month in which the claimant last performs labor or furnishes material, and in no event later than 90 days from the time the building, structure, or railroad is completed, or the work thereon otherwise terminated (Va. Code § 43-4)
  • the later of 6 months after the memorandum of lien was recorded and 60 days after the building, structure or railroad was completed or the work thereon otherwise terminated (Va. Code § 43-17)
State page2026-10-03
Washington
  • Sub-subcontractor, Supplier: At any time, for professional services, materials, or equipment supplied after the date which is sixty days before the notice is mailed or delivered (RCW 60.04.031(1); RCW 60.04.031(6))
  • Direct contractor, Laborer: None required (RCW 60.04.031(2))
  • Subcontractor: None required (RCW 60.04.031(2))
Other rules (2)
  • In the case of new construction of a single-family residence: Sub-subcontractor, Supplier: At any time, for professional services, materials, or equipment supplied after a date which is ten days before the notice is given (RCW 60.04.031(1))
  • For the repair, alteration, or remodel of an existing owner-occupied single-family residence or appurtenant garage, by a person who does not contract directly with the owner-occupier or their common law agent: Subcontractor, Sub-subcontractor, Supplier: Given to the owner-occupier, with no period stated (RCW 60.04.031(3); RCW 60.04.031(3)(b))
  • 90 days after the person has ceased to furnish labor, professional services, materials, or equipment (RCW 60.04.091)
Other rules (1)
  • For the construction of two or more separate residential units, for each unit: 90 days after the cessation of the furnishing of labor, professional services, materials, or equipment on each residential unit (RCW 60.04.101; RCW 60.04.091)
State page2026-10-03
West Virginia
  • Direct contractor: 100 days after the completion of his work provided for in such contract (W. Va. Code § 38-2-8; W. Va. Code § 38-2-14)
  • Subcontractor, Sub-subcontractor: 100 days after the completion of his or her subcontract (W. Va. Code § 38-2-9; W. Va. Code § 38-2-2)
  • For a materialman or furnisher of machinery or other necessary equipment under a contract with the owner: Supplier: 100 days after the date when he shall have ceased to furnish material or machinery or other necessary equipment (W. Va. Code § 38-2-10; W. Va. Code § 38-2-14)
  • For a materialman or furnisher of machinery or other necessary equipment under a contract with any contractor or with any subcontractor: Supplier: 100 days after the materialman or other furnisher of machinery or other necessary equipment ceased to furnish the materials or machinery or other equipment (W. Va. Code § 38-2-11)
  • For a workman, artisan, mechanic, laborer or other person under a contract with the owner: Laborer: 100 days after he shall have ceased to perform any such work or labor (W. Va. Code § 38-2-12; W. Va. Code § 38-2-14)
  • For a workman, artisan, mechanic, laborer or other person under a contract with any general contractor or with any subcontractor: Laborer: 100 days after he or she ceased to do work or perform labor upon the building or improvement thereto (W. Va. Code § 38-2-13)
State page2026-10-03
Wisconsin
  • For a prime contractor who has contracted or will contract with any subcontractors, suppliers, or service providers, if no written contract for the work of improvement is entered into, except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character: Direct contractor: 10 days after the first labor, services, materials, plans, or specifications are performed, furnished, or procured for the improvement by or pursuant to the authority of the prime contractor (Wis. Stat. § 779.02(2)(a); Wis. Stat. § 779.02(2)(c); Wis. Stat. § 779.02(1); Wis. Stat. § 779.02(1)(d), (e))
  • Except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character, where the prime contractor is not required to give notice under section 779.02, or where the claimant contracted directly with the owner: Subcontractor, Sub-subcontractor, Supplier: 60 days after performing, furnishing, or procuring the first labor, services, materials, plans, or specifications (Wis. Stat. § 779.02(2)(b); Wis. Stat. § 779.02(3); Wis. Stat. § 779.02(1); Wis. Stat. § 779.02(1)(d), (e))
  • For a prime contractor who has contracted or will contract with any subcontractors, suppliers, or service providers, where a written contract for the work of improvement is entered into, except where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character: Direct contractor: Included in any written contract with the owner, with a copy of the written contract provided to the owner (Wis. Stat. § 779.02(2)(a); Wis. Stat. § 779.02(2)(c); Wis. Stat. § 779.02(1); Wis. Stat. § 779.02(1)(d), (e))
  • Where more than 4 family living units are to be provided or added by the work of improvement, if the improvement is wholly residential in character, or where the improvement is partly or wholly nonresidential in character: None required (Wis. Stat. § 779.02(1))
  • For a laborer or mechanic employed by any prime contractor or subcontractor: Laborer: None required (Wis. Stat. § 779.02(1))
  • 6 months after the lien claimant performed, furnished, or procured the last labor, services, materials, plans, or specifications (Wis. Stat. § 779.06(1))
State page2026-10-03
Wyoming
  • Direct contractor: the earlier of 150 days after the last day when work was performed or materials furnished under contract and 150 days after the date of substantial completion of the project (W.S. 29-2-106(a))
  • Subcontractor, Sub-subcontractor, Supplier, Laborer: the earlier of 120 days after the last day when work was performed or materials furnished under contract and 120 days after the date of substantial completion of the project (W.S. 29-2-106(a))
Other rules (1)
  • With respect to a subcontractor: Subcontractor, Sub-subcontractor, Laborer: 120 days after the last day he performed work at the direction of the contractor or other person authorized to provide direction (W.S. 29-2-106(a); W.S. 29-1-201(a)(vi))
State page2026-10-03

Preliminary notice: the deadline the statute sets for a preliminary notice, or None required where the statute requires no preliminary notice from the roles the line names (or from any role, when the line names none). Lien filing: the deadline for filing or recording the lien, or None required where the statute provides no lien filing for the roles the line names (or for any role, when the line names none), and the statute cited in the cell says what it provides instead. Deadline to sue: the deadline for a suit to enforce the lien. In each cell, a rule limited to some roles or to one project type names them, a rule that turns on a condition names the condition, and each rule's statute follows it. Other rules: further rules that turn on a condition, such as a recorded notice of completion, each with its condition. Not yet verified: the row states nothing about that state's law.

CC BY 4.0: free to reuse with a link back. The downloads carry the published rows only, with their sources and dates.

About this data

Each published row gives, for one jurisdiction, the rules its lien statute sets for the preliminary notice, the lien filing and the deadline to sue, each with its citation. The labels are written from the statute's words, and the JSON download carries the statute sentences themselves. The published rows were retrieved between 2026-09-30 and 2026-10-03 and verified between 2026-10-01 and 2026-10-03, and the next review is due by 2026-12-31. Each source behind the published rows is listed below with its date. Every other row is marked Not yet verified and carries nothing else.

Sources behind the published rows

  1. AS 34.35.050 to 34.35.140, Alaska Legislature (retrieved 2026-09-30)
  2. AS 01.10.080, Alaska Legislature (retrieved 2026-09-30)
  3. AS 44.12.010 to 44.12.025, Alaska Legislature (retrieved 2026-09-30)
  4. Ala. Code § 35-11-210, Alabama Legislature (retrieved 2026-10-02)
  5. Ala. Code § 35-11-218, Alabama Legislature (retrieved 2026-10-02)
  6. Ala. Code § 35-11-215, Alabama Legislature (retrieved 2026-10-02)
  7. Ala. Code § 35-11-221, Alabama Legislature (retrieved 2026-09-30)
  8. Ala. Code § 1-1-4, Alabama Legislature (retrieved 2026-09-30)
  9. Ala. Code § 1-3-8, Alabama Legislature (retrieved 2026-09-30)
  10. Arkansas Code of 1987 Annotated, LexisNexis public access for the Arkansas Code (retrieved 2026-09-30)
  11. A.R.S. § 33-992.01, Arizona Legislature (retrieved 2026-09-30)
  12. Laws 2024, ch. 89 (H.B. 2110), Arizona Legislature (retrieved 2026-10-01)
  13. A.R.S. § 33-993, Arizona Legislature (retrieved 2026-09-30)
  14. A.R.S. § 33-998, Arizona Legislature (retrieved 2026-09-30)
  15. A.R.S. § 33-1002, Arizona Legislature (retrieved 2026-09-30)
  16. A.R.S. § 1-243, Arizona Legislature (retrieved 2026-09-30)
  17. A.R.S. § 1-303, Arizona Legislature (retrieved 2026-09-30)
  18. A.R.S. § 1-301, Arizona Legislature (retrieved 2026-09-30)
  19. Cal. Civ. Code § 8204, California Legislative Information (retrieved 2026-09-30)
  20. Cal. Civ. Code § 8200, California Legislative Information (retrieved 2026-09-30)
  21. Cal. Civ. Code § 8110, California Legislative Information (retrieved 2026-09-30)
  22. Cal. Civ. Code § 8412, California Legislative Information (retrieved 2026-09-30)
  23. Cal. Civ. Code § 8190, California Legislative Information (retrieved 2026-09-30)
  24. Cal. Civ. Code § 8414, California Legislative Information (retrieved 2026-09-30)
  25. Cal. Civ. Code § 8460, California Legislative Information (retrieved 2026-09-30)
  26. Cal. Civ. Code § 8180, California Legislative Information (retrieved 2026-09-30)
  27. Cal. Civ. Code § 8182, California Legislative Information (retrieved 2026-09-30)
  28. Cal. Code Civ. Proc. § 12, California Legislative Information (retrieved 2026-09-30)
  29. Cal. Civ. Code § 8058, California Legislative Information (retrieved 2026-09-30)
  30. Cal. Code Civ. Proc. § 12a, California Legislative Information (retrieved 2026-09-30)
  31. Cal. Code Civ. Proc. § 135, California Legislative Information (retrieved 2026-09-30)
  32. Cal. Code Civ. Proc. § 12b, California Legislative Information (retrieved 2026-10-01)
  33. Colorado Revised Statutes 2024, title 38, Colorado General Assembly (archived copy, captured 2026-09-26)
  34. Conn. Gen. Stat. chapter 847, Connecticut General Assembly (retrieved 2026-10-02)
  35. D.C. Code § 40-301.02, Council of the District of Columbia (retrieved 2026-10-02)
  36. D.C. Code § 40-303.01, Council of the District of Columbia (retrieved 2026-10-02)
  37. D.C. Code § 40-303.02, Council of the District of Columbia (retrieved 2026-10-02)
  38. D.C. Code § 40-303.03, Council of the District of Columbia (retrieved 2026-10-02)
  39. D.C. Code § 40-303.13, Council of the District of Columbia (retrieved 2026-10-02)
  40. 25 Del. C. ch. 27, subch. II, Delaware Code Online (retrieved 2026-10-02)
  41. 25 Del. C. ch. 27, subch. III, Delaware Code Online (retrieved 2026-10-02)
  42. 25 Del. C. ch. 27, subch. I, Delaware Code Online (retrieved 2026-10-02)
  43. Fla. Stat. ch. 713 (2025), Online Sunshine (archived copy, captured 2026-05-17)
  44. Fla. Stat. § 110.117 (2025), Online Sunshine (archived copy, captured 2025-11-18)
  45. Official Code of Georgia Annotated, LexisNexis public access for the Georgia General Assembly (retrieved 2026-09-30)
  46. Haw. Rev. Stat. § 507-42, Hawaii State Legislature (retrieved 2026-10-02)
  47. Haw. Rev. Stat. § 507-43, Hawaii State Legislature (retrieved 2026-10-02)
  48. Haw. Rev. Stat. § 1-29, Hawaii State Legislature (retrieved 2026-09-30)
  49. Haw. Rev. Stat. § 8-1, Hawaii State Legislature (retrieved 2026-10-02)
  50. Haw. Rev. Stat. § 8-2, Hawaii State Legislature (retrieved 2026-10-02)
  51. Iowa Code § 572.13B, Iowa Legislature (retrieved 2026-09-30)
  52. Iowa Code § 572.1, Iowa Legislature (retrieved 2026-09-30)
  53. Iowa Code § 572.33, Iowa Legislature (retrieved 2026-09-30)
  54. Iowa Code § 572.13A, Iowa Legislature (retrieved 2026-09-30)
  55. Iowa Code § 572.13, Iowa Legislature (retrieved 2026-09-30)
  56. Iowa Code § 572.14, Iowa Legislature (retrieved 2026-09-30)
  57. Iowa Code § 572.9, Iowa Legislature (retrieved 2026-09-30)
  58. Iowa Code § 572.10, Iowa Legislature (retrieved 2026-09-30)
  59. Iowa Code § 572.11, Iowa Legislature (retrieved 2026-09-30)
  60. Iowa Code § 572.27, Iowa Legislature (retrieved 2026-09-30)
  61. Iowa Code § 572.28, Iowa Legislature (retrieved 2026-09-30)
  62. Iowa Code § 4.1, Iowa Legislature (retrieved 2026-09-30)
  63. Idaho Code § 45-507, Idaho State Legislature (archived copy, captured 2026-05-15)
  64. Idaho Code § 45-510, Idaho State Legislature (archived copy, captured 2025-12-19)
  65. Idaho Code § 73-109, Idaho State Legislature (archived copy, captured 2025-12-24)
  66. Idaho Code § 73-108, Idaho State Legislature (archived copy, captured 2025-11-12)
  67. 770 ILCS 60, Mechanics Lien Act, Illinois General Assembly (retrieved 2026-09-30)
  68. 770 ILCS 60, Mechanics Lien Act, Illinois General Assembly (archived copy, captured 2026-04-09)
  69. 5 ILCS 70/1.11, Illinois General Assembly (archived copy, captured 2025-05-02)
  70. 205 ILCS 630/17, Illinois General Assembly (archived copy, captured 2025-03-11)
  71. Indiana Code 2026, Title 32, Indiana General Assembly (retrieved 2026-09-30)
  72. K.S.A. 60-1103a, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  73. K.S.A. 60-1103b, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  74. K.S.A. 60-1102, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  75. K.S.A. 60-1103, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  76. K.S.A. 60-1105, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  77. K.S.A. 60-206, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  78. K.S.A. 35-107, Kansas Office of Revisor of Statutes (retrieved 2026-10-02)
  79. La. R.S. 9:4822, Louisiana State Legislature (archived copy, captured 2025-12-13)
  80. La. R.S. 9:4823, Louisiana State Legislature (archived copy, captured 2024-10-16)
  81. La. Code Civ. Proc. art. 5059, Louisiana State Legislature (archived copy, captured 2026-06-24)
  82. La. R.S. 1:55, Louisiana State Legislature (archived copy, captured 2026-06-15)
  83. Mass. Gen. Laws ch. 254, § 2, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-03-05)
  84. Mass. Gen. Laws ch. 254, § 4, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-05-08)
  85. Mass. Gen. Laws ch. 254, § 1, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2025-11-12)
  86. Mass. Gen. Laws ch. 254, § 8, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-05-12)
  87. Mass. Gen. Laws ch. 254, § 11, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-05-19)
  88. Mass. Gen. Laws ch. 254, § 5, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2025-12-11)
  89. Mass. Gen. Laws ch. 254, § 2A, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-06-05)
  90. Mass. Gen. Laws ch. 254, § 2B, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-03-11)
  91. Mass. Gen. Laws ch. 4, § 9, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-01-15)
  92. Mass. Gen. Laws ch. 4, § 7, The General Court of the Commonwealth of Massachusetts (archived copy, captured 2026-09-23)
  93. Md. Code, Real Prop. § 9-104, Maryland General Assembly (retrieved 2026-10-02)
  94. Md. Code, Real Prop. § 9-101, Maryland General Assembly (retrieved 2026-10-02)
  95. Md. Code, Real Prop. § 9-105, Maryland General Assembly (retrieved 2026-10-02)
  96. Md. Code, Real Prop. § 9-109, Maryland General Assembly (retrieved 2026-10-02)
  97. Md. Code, Gen. Prov. § 1-302, Maryland General Assembly (retrieved 2026-10-02)
  98. Md. Code, Gen. Prov. § 1-111, Maryland General Assembly (retrieved 2026-10-02)
  99. 10 M.R.S. § 3255, Maine Legislature (retrieved 2026-10-02)
  100. 10 M.R.S. § 3253, Maine Legislature (retrieved 2026-10-02)
  101. 10 M.R.S. § 3256, Maine Legislature (retrieved 2026-10-02)
  102. Mich. Comp. Laws § 570.1109, Michigan Legislature (archived copy, captured 2025-05-16)
  103. Mich. Comp. Laws § 570.1111, Michigan Legislature (archived copy, captured 2025-05-17)
  104. Mich. Comp. Laws § 570.1117, Michigan Legislature (archived copy, captured 2025-05-16)
  105. Mich. Comp. Laws § 570.1114, Michigan Legislature (archived copy, captured 2025-12-23)
  106. Mich. Comp. Laws § 570.1108a, Michigan Legislature (archived copy, captured 2025-05-17)
  107. Mich. Comp. Laws § 570.1108, Michigan Legislature (archived copy, captured 2025-05-16)
  108. Mich. Comp. Laws § 8.6, Michigan Legislature (archived copy, captured 2025-07-08)
  109. Mich. Comp. Laws § 435.101, Michigan Legislature (archived copy, captured 2025-05-17)
  110. Minn. Stat. ch. 514 (2025), Minnesota Office of the Revisor of Statutes (retrieved 2026-10-02)
  111. Minn. Stat. § 645.15 (2025), Minnesota Office of the Revisor of Statutes (retrieved 2026-10-02)
  112. Minn. Stat. § 645.44 (2025), Minnesota Office of the Revisor of Statutes (retrieved 2026-10-02)
  113. Mo. Rev. Stat. § 429.012, Missouri Revisor of Statutes (retrieved 2026-10-02)
  114. Mo. Rev. Stat. § 429.016, Missouri Revisor of Statutes (retrieved 2026-10-02)
  115. Mo. Rev. Stat. § 429.100, Missouri Revisor of Statutes (retrieved 2026-10-02)
  116. Mo. Rev. Stat. § 429.080, Missouri Revisor of Statutes (retrieved 2026-10-02)
  117. Mo. Rev. Stat. § 429.170, Missouri Revisor of Statutes (retrieved 2026-10-02)
  118. Mo. Rev. Stat. § 429.013, Missouri Revisor of Statutes (retrieved 2026-10-02)
  119. Mo. Rev. Stat. § 506.060, Missouri Revisor of Statutes (retrieved 2026-10-02)
  120. Mo. Rev. Stat. § 1.040, Missouri Revisor of Statutes (retrieved 2026-10-02)
  121. Mo. Rev. Stat. § 9.010, Missouri Revisor of Statutes (retrieved 2026-10-02)
  122. Mississippi Code 1972 Annotated, LexisNexis public access for the Mississippi Legislature (retrieved 2026-09-30)
  123. Mont. Code Ann. § 71-3-531, Montana Legislature (retrieved 2026-10-02)
  124. Mont. Code Ann. § 71-3-535, Montana Legislature (retrieved 2026-10-02)
  125. Mont. Code Ann. § 71-3-533, Montana Legislature (retrieved 2026-10-02)
  126. Mont. Code Ann. § 71-3-534, Montana Legislature (retrieved 2026-10-02)
  127. Mont. Code Ann. § 71-3-562, Montana Legislature (retrieved 2026-10-02)
  128. Mont. Code Ann. § 1-1-306, Montana Legislature (retrieved 2026-10-02)
  129. Mont. Code Ann. § 1-1-216, Montana Legislature (retrieved 2026-10-02)
  130. Mont. Code Ann. § 1-1-307, Montana Legislature (retrieved 2026-10-02)
  131. N.C. Gen. Stat. ch. 44A, art. 2, North Carolina General Assembly (archived copy, captured 2026-05-17)
  132. N.C. Gen. Stat. § 1-593, North Carolina General Assembly (archived copy, captured 2026-03-11)
  133. N.C. Gen. Stat. § 1A-1, Rule 6, North Carolina General Assembly (archived copy, captured 2026-06-14)
  134. N.C. Gen. Stat. § 103-5, North Carolina General Assembly (archived copy, captured 2025-06-20)
  135. N.D.C.C. ch. 35-27, North Dakota Legislative Branch (retrieved 2026-10-02)
  136. N.D.C.C. ch. 1-02, North Dakota Legislative Branch (retrieved 2026-10-02)
  137. N.D.C.C. ch. 1-03, North Dakota Legislative Branch (retrieved 2026-10-02)
  138. Neb. Rev. Stat. § 52-135, Nebraska Legislature (archived copy, captured 2026-06-14)
  139. Neb. Rev. Stat. § 52-136, Nebraska Legislature (archived copy, captured 2026-04-11)
  140. Neb. Rev. Stat. § 52-137, Nebraska Legislature (archived copy, captured 2026-06-14)
  141. Neb. Rev. Stat. § 52-129, Nebraska Legislature (archived copy, captured 2025-11-18)
  142. Neb. Rev. Stat. § 52-140, Nebraska Legislature (archived copy, captured 2026-06-14)
  143. Neb. Rev. Stat. § 25-2221, Nebraska Legislature (archived copy, captured 2025-10-05)
  144. N.H. Rev. Stat. Ann. § 447:5, New Hampshire General Court (archived copy, captured 2026-05-11)
  145. N.H. Rev. Stat. Ann. § 447:6, New Hampshire General Court (archived copy, captured 2026-09-09)
  146. N.H. Rev. Stat. Ann. § 447:8, New Hampshire General Court (archived copy, captured 2026-05-11)
  147. N.H. Rev. Stat. Ann. § 447:12-b, New Hampshire General Court (archived copy, captured 2025-04-18)
  148. N.H. Rev. Stat. Ann. § 447:9, New Hampshire General Court (archived copy, captured 2026-05-11)
  149. N.H. Rev. Stat. Ann. § 447:10, New Hampshire General Court (archived copy, captured 2025-08-23)
  150. N.H. Rev. Stat. Ann. § 21:35, New Hampshire General Court (archived copy, captured 2026-07-12)
  151. N.M. Stat. Ann. chapter 48, New Mexico Compilation Commission (retrieved 2026-10-02)
  152. NRS chapter 108, Nevada Legislature (archived copy, captured 2026-04-20)
  153. N.Y. Lien Law § 3, New York State Senate (retrieved 2026-09-30)
  154. N.Y. Lien Law § 10, New York State Senate (retrieved 2026-09-30)
  155. N.Y. Lien Law § 10, New York State Senate (archived copy, captured 2026-09-22)
  156. N.Y. Lien Law § 11, New York State Senate (retrieved 2026-09-30)
  157. N.Y. Lien Law § 11-b, New York State Senate (archived copy, captured 2025-04-18)
  158. N.Y. Lien Law § 11-b, New York State Senate (retrieved 2026-09-30)
  159. N.Y. Lien Law § 17, New York State Senate (retrieved 2026-09-30)
  160. N.Y. Gen. Constr. Law § 20, New York State Senate (archived copy, captured 2025-11-08)
  161. N.Y. Gen. Constr. Law § 25-a, New York State Senate (archived copy, captured 2025-08-25)
  162. N.Y. Gen. Constr. Law § 24, New York State Senate (archived copy, captured 2026-02-11)
  163. Ohio Rev. Code ch. 1311, Ohio Laws (archived copy, captured 2026-05-20)
  164. Ohio Rev. Code § 1.14, Ohio Laws (archived copy, captured 2026-06-12)
  165. Okla. Stat. tit. 42 (Liens), Oklahoma State Legislature (retrieved 2026-10-02)
  166. Okla. Stat. tit. 25 (Definitions and General Provisions), Oklahoma State Legislature (retrieved 2026-10-02)
  167. ORS chapter 87 (2025 edition), Oregon State Legislature (archived copy, captured 2026-04-11)
  168. ORS chapter 174 (2025 edition), Oregon State Legislature (archived copy, captured 2026-02-19)
  169. ORS chapter 187 (2025 edition), Oregon State Legislature (archived copy, captured 2026-06-06)
  170. R.I. Gen. Laws § 34-28-4.1, State of Rhode Island General Assembly (archived copy, captured 2025-11-09)
  171. R.I. Gen. Laws § 34-28-4, State of Rhode Island General Assembly (archived copy, captured 2025-11-09)
  172. R.I. Gen. Laws § 34-28-9, State of Rhode Island General Assembly (archived copy, captured 2026-09-19)
  173. R.I. Gen. Laws § 34-28-7, State of Rhode Island General Assembly (archived copy, captured 2026-06-09)
  174. R.I. Gen. Laws § 34-28-10, State of Rhode Island General Assembly (archived copy, captured 2025-11-09)
  175. R.I. Gen. Laws § 43-3-13, State of Rhode Island General Assembly (archived copy, captured 2025-05-02)
  176. S.C. Code tit. 29, ch. 5, South Carolina Legislature (retrieved 2026-10-02)
  177. SDCL 44-9-53, South Dakota Legislature (retrieved 2026-10-03)
  178. SDCL 44-9-10, South Dakota Legislature (retrieved 2026-10-03)
  179. SDCL 44-9-17, South Dakota Legislature (retrieved 2026-10-03)
  180. SDCL 44-9-15, South Dakota Legislature (retrieved 2026-10-03)
  181. SDCL 44-9-24, South Dakota Legislature (retrieved 2026-10-03)
  182. SDCL 44-9-26, South Dakota Legislature (retrieved 2026-10-03)
  183. SDCL 44-9-50, South Dakota Legislature (retrieved 2026-10-03)
  184. SDCL 44-9-51, South Dakota Legislature (retrieved 2026-10-03)
  185. SDCL 2-14-14, South Dakota Legislature (retrieved 2026-10-03)
  186. SDCL 1-5-1, South Dakota Legislature (retrieved 2026-10-03)
  187. Tennessee Code Annotated, LexisNexis public access for the Tennessee Code (retrieved 2026-09-30)
  188. Tex. Prop. Code ch. 53, Texas Legislative Council (retrieved 2026-09-30)
  189. Tex. Gov't Code ch. 311, Texas Legislative Council (retrieved 2026-09-30)
  190. Tex. Prop. Code ch. 1, Texas Legislative Council (retrieved 2026-10-01)
  191. Tex. Gov't Code ch. 662, Texas Legislative Council (retrieved 2026-09-30)
  192. Utah Code § 38-1a-501, Utah State Legislature (archived copy, captured 2017-02-16)
  193. Utah Code § 38-1a-502, Utah State Legislature (archived copy, captured 2017-03-03)
  194. Utah Code § 38-1a-701, Utah State Legislature (archived copy, captured 2017-03-03)
  195. Utah Code § 38-1a-507, Utah State Legislature (archived copy, captured 2017-02-17)
  196. Utah Code § 68-3-7, Utah State Legislature (archived copy, captured 2025-04-02)
  197. Utah Code Title 63G, Chapter 1, Part 3 (State Holidays), Utah State Legislature (archived copy, captured 2026-07-08)
  198. Va. Code § 43-4.01, Virginia General Assembly (retrieved 2026-10-03)
  199. Va. Code § 43-7, Virginia General Assembly (retrieved 2026-10-03)
  200. Va. Code § 43-1, Virginia General Assembly (retrieved 2026-10-03)
  201. Va. Code § 43-9, Virginia General Assembly (retrieved 2026-10-03)
  202. Va. Code § 43-4, Virginia General Assembly (retrieved 2026-10-03)
  203. Va. Code § 43-17, Virginia General Assembly (retrieved 2026-10-03)
  204. Va. Code § 1-210, Virginia General Assembly (retrieved 2026-09-30)
  205. Va. Code § 2.2-3300, Virginia General Assembly (retrieved 2026-10-03)
  206. 9 V.S.A. § 1921, Vermont Statutes Online, Vermont General Assembly (retrieved 2026-09-30)
  207. 9 V.S.A. § 1923, Vermont Statutes Online, Vermont General Assembly (retrieved 2026-09-30)
  208. 9 V.S.A. § 1924, Vermont Statutes Online, Vermont General Assembly (retrieved 2026-09-30)
  209. 1 V.S.A. § 138, Vermont Statutes Online, Vermont General Assembly (retrieved 2026-09-30)
  210. RCW chapter 60.04, Washington State Legislature (retrieved 2026-10-03)
  211. RCW 1.12.040, Washington State Legislature (retrieved 2026-10-03)
  212. RCW 1.16.050, Washington State Legislature (retrieved 2026-10-03)
  213. Wis. Stat. § 779.02, Wisconsin State Legislature (archived copy, captured 2025-12-14)
  214. Wis. Stat. § 779.06, Wisconsin State Legislature (archived copy, captured 2026-03-14)
  215. Wis. Stat. § 990.001, Wisconsin State Legislature (archived copy, captured 2026-04-19)
  216. Wis. Stat. § 995.20, Wisconsin State Legislature (archived copy, captured 2026-03-03)
  217. W. Va. Code § 38-2-14, West Virginia Legislature (archived copy, captured 2025-12-07)
  218. W. Va. Code § 38-2-8, West Virginia Legislature (archived copy, captured 2025-11-17)
  219. W. Va. Code § 38-2-9, West Virginia Legislature (archived copy, captured 2025-11-18)
  220. W. Va. Code § 38-2-2, West Virginia Legislature (archived copy, captured 2025-11-13)
  221. W. Va. Code § 38-2-10, West Virginia Legislature (archived copy, captured 2025-12-12)
  222. W. Va. Code § 38-2-11, West Virginia Legislature (archived copy, captured 2025-11-13)
  223. W. Va. Code § 38-2-12, West Virginia Legislature (archived copy, captured 2025-12-17)
  224. W. Va. Code § 38-2-13, West Virginia Legislature (archived copy, captured 2025-11-16)
  225. W. Va. Code § 38-2-34, West Virginia Legislature (archived copy, captured 2025-11-13)
  226. W. Va. Code § 2-2-1, West Virginia Legislature (archived copy, captured 2025-12-01)
  227. W. Va. Senate Bill 793 (2026 Regular Session), enrolled, West Virginia Legislature (retrieved 2026-10-03)
  228. Wyo. Stat. title 29 (Liens), Wyoming Legislature (retrieved 2026-10-03)

Changelog

  1. : 9 more jurisdictions published: South Dakota, Tennessee, Utah, Vermont, Virginia, Washington, West Virginia, Wisconsin and Wyoming.
  2. : 10 more jurisdictions published: Montana, Nebraska, Nevada, New Hampshire, New Mexico, North Dakota, Oklahoma, Oregon, Rhode Island and South Carolina.
  3. : 10 more jurisdictions published: Iowa, Kansas, Louisiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi and Missouri.
  4. : 10 more jurisdictions published: Alabama, Alaska, Arkansas, Colorado, Connecticut, Delaware, District of Columbia, Hawaii, Idaho and Indiana.
  5. : Dataset first published: 9 of 51 jurisdictions published.